This is an Abstract of Offers for Construction, a federal procurement document issued by the US Army Corps of Engineers Detroit District for solicitation W911XK26BA014. The solicitation was issued on 03 February 2026 with an opening date of 05 March 2026. The project is titled "FY25 Saginaw River Maintenance Dredging" and involves dredging operations and related maintenance work at the Saginaw River and Bay locations in Michigan.

Two offers were received from Morrsh Wallace Construction Inc. and Ryba Dean Marine. The base bid includes mobilization and demobilization, required dredging from STA 00+00 to BAY STA 70+00 (divided into tiered pricing for the first 39,900 cubic yards at higher rates and over 39,900 cubic yards at lower rates), access gate repair, aggregate surfacing, and vegetation clearing at multiple sites. The base bid totals $2,425,295.20 (Morrsh Wallace) and $1,799,636.20 (Ryba Dean Marine). Two options are available: Option 1 covers dredging from RIVER STA 938+00 to RIVER STA 800+00 totaling $858,350.00 and $722,636.00 respectively; Option 2 covers dredging from RIVER STA 20+00 to BAY STA 70+00 totaling $540,350.00 and $665,921.90 respectively. The total amount of base and all options for the two offerors is $3,656,431.20 and $3,139,194.81. Bid security of 20% was required, and one amendment was issued to the solicitation.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

03 Feb 2026 05 Mar 2026 1 1

DATE SIGNED

7A. ITEM NO 7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY D. UNIT E. UNIT PRICE

F. ESTIMATED

AMOUNT D. UNIT PRICE

E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT

1 MOBILIZATION & DEMOBILIZATION 1 JOB $ 596,873.00 $ 596,873.00 $ 490,000.00 $ 490,000.00 $ 242,794.37 $ 242,794.37

0002 Required Dredging - STA 00+00 to BAY STA 70+00

0002AA First 39,900 CY 39,933 CY 19.40 $ 774,700.20 $ 11.40 $ 455,236.20 $ 9.72 $ 388,148.76

0002AB Over 39,900 CY 51,000 CY 13.40 $ 683,400.00 $ 11.40 $ 581,400.00 $ 9.72 $ 495,720.00

0003 Access Gate Repair at Saginaw River DMDF 1 Job 1,765.00 $ 1,765.00 $ 10,500.00 $ 10,500.00 $ 6,030.87 $ 6,030.87

0004 Aggregate Surfacing at Saginaw River DMDF 100 Ton 89.00 $ 8,900.00 $ 475.00 $ 47,500.00 $ 85.65 $ 8,565.00

0005 Vegetation Clearing at Saginaw River DMDF 1 Job 237,107.00 $ 237,107.00 $ 132,000.00 $ 132,000.00 $ 222,960.29 $ 222,960.29

0006 Vegetation Clearing at Saginaw Bay CDF 1 Job 122,550.00 $ 122,550.00 $ 83,000.00 $ 83,000.00 $ 109,189.62 $ 109,189.62

0007 Mobilization & Demobilization for Upper River Dredging 1 JOB 134,746.00 $ 134,746.00 $ 80,000.00 $ 80,000.00 $ 226,713.90 $ 226,713.90

0008AA First 12,800 CY 12,800 CY 21.80 $ 279,040.00 $ 13.50 $ 172,800.00 $ 12.88 $ 164,864.00

0008AB Over 12,800 CY 21,300 CY 14.50 $ 308,850.00 $ 13.50 $ 287,550.00 $ 12.88 $ 274,344.00

0009AA First 13,800 CY 13,800 CY 19.50 $ 269,100.00 $ 10.00 $ 138,000.00 $ 9.72 $ 134,136.00

0009AB Over 13,800 CY 18,000 CY 13.30 $ 239,400.00 $ 10.00 $ 180,000.00 $ 9.72 $ 174,960.00

1. SOLICITATION NUMBER

W911XK26BA014

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. SIGNATURE

9. OFFERS

yes

B. BID SECURITY (Type and Amount)

20%

6. NUMBER OF AMENDMENTS ISSUED: 1

FY25 Saginaw River Maintenance Dredging

X

(Check A, B, or C and complete D, E, and F)

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type and Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

yes

Morrsh Wallace Construction Inc.

Ryba Dean Marine

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE

NO. 1 NO. 2

A. HIRED LABOR

A. OFFEROR: A. OFFEROR:

ABSTRACT OF OFFERS - CONSTRUCTION

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Michelle L. Barr

US Army Corps of Engineers Detroit District

Total Amount of Option 2

Total Amount of All Options

Total Amount of Base and All Options

$2,425,295.20

$508,500.00

1,231,136.00

$3,656,431.20

$1,799,636.20 $1,473,408.91

Option 1 Dredging - RIVER STA 938+00 to RIVER STA 800+00

Option 2 Dredging - RIVER STA 20+00 to BAY STA 70+00

Option 1

Option 2

722,636.00 540,350.00 665,921.90

Total Amount of Base Bid

Total Amount of Option 1

$2,657,986.20 $2,448,426.81

$ 318,000.00

858,350.00

$ 309,096.00

975,017.90

2026-03-09T15:08:44-0400
BARR.MICHELLE.LEE.1232355901

File details come from the government source that posted it. Updated .