Bid Abstract - Monroe AMD (Final).pdf

PDF 273 KB Posted

Attached to
Monroe Harbor Advanced Maintenance Dredging
Solicitation number
W911XK26BA013
Issued by

About this file

This is an Abstract of Bids for a construction contract issued by the US Army Corps of Engineers, Contracting Branch, Detroit District, for Monroe Harbor Advanced Maintenance Dredging. The solicitation number is W911XK26BA013, issued on December 17, 2025, with a bid opening date of January 21, 2026. The contract encompasses dredging operations in the Federal Channel and Turning Basin from approximately CS 20+00 Lake to CS 20+00 River, extending through CS 60+00 to CS 79+00, including the DTE Dock area.

Three bids were received from M-K Construction Co Inc, Morrish-Wallace Construction, Inc. d/b/a Ryba Marine Construction, and Dean Marine and Excavating, Inc., with bid securities of 5%, 20%, and 20% respectively. The base contract includes mobilization/demobilization and dredging of approximately 52,000 cubic yards (40,000 CY at one rate plus 12,000 CY at an overage rate), with two optional dredging phases of 16,500 cubic yards each. Bid prices for the base contract ranged from $2,242,360.00 to $3,951,420.15, with total combined base and options ranging from $2,597,765.00 to $6,256,470.15. Unit prices varied significantly across offerors, ranging from $28.10 to $70.97 per cubic yard for dredging services. The government's revised estimate was $3,360,960.00 for the base contract and $3,466,778.66 when including all options.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

12/17/2025 1/21/2026 1 1

0001 Mobilization/Demobilization 1 JOB $ 485,160.00 $ 485,160.00 $ 342,948.66 $ 342,948.66 $ 255,815.00 $ 255,815.00 $ 274,420.15 $ 274,420.15

Base Dredging: CS 20+00 Lake to CS 20+00 River Federal channel and DTE Dock. Dredging the Federal Channel and Turning Basin CS 60+00 to CS 79+00

0002AA First 40,000 CY 40,000 CY $ 35.50 $ 1,420,000.00 $ 43.15 $ 1,726,000.00 $ 29.25 $ 1,170,000.00 $ 70.97 $ 2,838,800.00

0002AB Over 40,000 CY 12,000 CY $ 28.10 $ 337,200.00 $ 20.96 $ 251,520.00 $ 29.60 $ 355,200.00 $ 69.85 $ 838,200.00

$ 2,242,360.00 $ 2,320,468.66 $ 1,781,015.00 $ 3,951,420.15

Option 1 Dredging: CS 20+00 Lake to CS 20+00 River Federal channel and DTE Dock. Dredging the Federal Channel and Turning Basin CS 60+00 to CS 79+00

CY

0003AA First 10,000 CY 10,000 CY $ 37.60 $ 376,000.00 $ 42.97 $ 429,700.00 $ 24.75 $ 247,500.00 $ 69.85 $ 698,500.00

0003AB Over 10,000 CY 6,500 CY $ 28.20 $ 183,300.00 $ 22.07 $ 143,455.00 $ 24.75 $ 160,875.00 $ 69.85 $ 454,025.00

$ 559,300.00 $ 573,155.00 $ 408,375.00 $ 1,152,525.00

Option 2 Dredging: CS 20+00 Lake to CS 20+00 River Federal channel and DTE Dock. Dredging the Federal Channel and Turning Basin CS 60+00 to CS 79+00

CY

0004AA First 10,000 CY 10,000 CY $ 37.60 $ 376,000.00 $ 42.97 $ 429,700.00 $ 24.75 $ 247,500.00 $ 69.85 $ 698,500.00

0004AB Over 10,000 CY 6,500 CY $ 28.20 $ 183,300.00 $ 22.07 $ 143,455.00 $ 24.75 $ 160,875.00 $ 69.85 $ 454,025.00

$ 559,300.00 $ 573,155.00 $ 408,375.00 $ 1,152,525.00

$ 1,118,600.00 $ 1,146,310.00 $ 816,750.00 $ 2,305,050.00

$ 3,360,960.00 $ 3,466,778.66 $ 2,597,765.00 $ 6,256,470.15

C. AMENDMENTS ACKNOWLEDGED

TOTAL AMOUNT OF BASE AND ALL OPTIONS

TOTAL AMOUNT OF OPTION 2

TOTAL AMOUNT OF OPTIONS

E. ESTIMATED

AMOUNT

D. UNIT PRICE

TOTAL AMOUNT OF BASE

TOTAL AMOUNT OF OPTION 1

ABSTRACT OF BIDS - Construction

1. SOLICITATION NUMBER

W911XK26BA013

4. ISSUING OFFICE

A. Hired Labor

5. PROJECT TITLE

US Army Corp of Engineers Contracting Branch, Detroit District

Monroe Harbor Advanced Maintenance Dredging

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Kari L. Tauriainen, Contracting Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

8. REVISED GOVERNMENT ESTIMATE

SIGNATURE DATE SIGNED

B. BID SECURITY (TYPE AND AMOUNT)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT PRICE

A. OFFEROR:

9. OFFERS

NO. 1 NO. 2

A. OFFEROR:

E. ESTIMATED

AMOUNT

20%

N/A, no amendment N/A, no amendment

MORRISH-WALLACE CONSTRUCTION,

INC. d/b/a Ryba Marine Construction

M-K CONSTRUCTION CO INC

B. BID SECURITY (TYPE AND AMOUNT)

5%

C.Reasonable Contract (With Profit)

X B. Reasonable Contract (Without Profit)

7A. ITEM

NO

7C. EST.

QUANTITY7B. DESCRIPTION OF OFFERED ITEM

D. UNIT

6. Number of Amendments Issued

E. UNIT PRICE

F. ESTIMATED

AMOUNT

D. UNIT PRICE

NO. 3

A. OFFEROR:

DEAN MARINE AND EXCAVATING, INC.

B. BID SECURITY (TYPE AND AMOUNT)

20%

C. AMENDMENTS ACKNOWLEDGED

N/A, no amendment

E. ESTIMATED

AMOUNT

CUI

2026-01-28T08:33:19-0500
Kari L Tauriainen

File details come from the government source that posted it. Updated .