Bid Abstract W911XK22B0005.pdf

PDF 199 KB Posted

Attached to
Battle Creek Dam Improvement Project Federal contract opportunity
Solicitation number
W911XK22B0005
Issued by
Department of the Army Corps of Engineers Engineering District Detroit

About this file

This abstract of bids is for a construction project to improve Battle Creek Dam. The solicitation seeks bids for tree and brush clearing, earthwork, filling, site restoration, utility removal, and inspection and lining of intake and outlet pipes at the dam. Key details include an estimated government cost of $589,770, bids from four contractors ranging from $601,470 to $822,900, and optional bids for concrete lining of the intake pipe and outlet pipe if inspections find it necessary. The work will be performed for the U.S. Army Corps of Engineers Detroit District and involves restoring and upgrading the dam.

View the file

Other files for this federal contract opportunity

Other files attached to Battle Creek Dam Improvement Project, newest first.
File Type Posted
Battle Creek USMC Dam Improvement Site Visit Attendance Sheet.pdf PDF
JA Sole Source Element Battle Creek Redacted.pdf PDF
Battle Creek USMC Dam - Certified Final RTA Plans.pdf PDF
Battle Creek USMC Dam - Specifications.pdf PDF
W911XK22B0005.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

08/11/2022 09/12/2022 1 2

0001 Tree and Brush Clearing 1 JA $ 331,700.00 $ 331,700.00 $ 237,000.00 $ 237,000.00 $ 463,918.00 $ 463,918.00

002 Earthwork 1 JA $ 99,870.00 $99,870.00 $ 138,000.00 $ 138,000.00 $ 120,839.00 $ 120,839.00

003 Fill on North Crest and Intake Pipe Repairs 1 JA $ 18,975.00 $18,975.00 $ 53,000.00 $ 53,000.00 $ 18,946.00 $ 18,946.00

004 Televise and Inspect Intake and Outlet Pipes 1 JA $ 2,930.00 $ 2,930.00 $ 5,000.00 $ 5,000.00 $ 8,443.00 $ 8,443.00

00005 Site Restoration 1 JA $ 47,585.00 $ 47,585.00 $ 300,000.00 $ 300,000.00 $ 77,568.00 $ 77,568.00

00006 Pump Decommissioning 1 JA $ 20,630.00 $ 20,630.00 $ 25,000.00 $ 25,000.00 $ 8,559.00 $ 8,559.00

00007

0007AA Sand Fill Over 40 CuFt 40 CuFt $ 41.00 $ 1,640.00 $ 10.00 $ 400.00 $ 34.95 $ 1,398.00

0007AB Sand Fill over 40 CuFt 350 CuFt $ 41.00 $ 14,350.00 $ 10.00 $ 3,500.00 $ 25.95 $ 9,082.50

00008

0008AA Bentonite Fill First 40 CuFt 40 CuFt $ 295.00 $ 11,800.00 $ 100.00 $ 4,000.00 $ 100.00 $ 4,000.00

0008AB Bentonite Fill Over 40 CuFt 20 CuFt $ 295.00 $ 5,900.00 $ 100.00 $ 2,000.00 $ 100.00 $ 2,000.00

00009 Utility Removal 1 JA $ 34,390.00 $ 34,390.00 $ 22,574.00 $ 22,574.00

$ 589,770.00 $ 792,900.00 $ 737,327.50

00010 Line Intake Pipe 1 JA $ 2,340.00 $ 2,340.00 $ 10,000.00 $ 10,000.00 $ 2,250.00 $ 2,250.00

$ 2,340.00 $ 10,000.00 $ 2,250.00

00011 Line Outlet Pipe 1 JA $ 9,360.00 $ 9,360.00 $ 20,000.00 $ 20,000.00 $ 9,000.00 $ 9,000.00

$ 9,360.00 $ 20,000.00 $ 9,000.00

601,470.00$ 822,900.00$ 748,577.50$

Option 2

Total for Option 2

Total Amount of Bid and All Options

F. ESTIMATED

AMOUNT

Well Decommissioning - Bentonite Fill

Total for Base

Option 1

Total for Option 1

N/A

D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT

Phoenix Diversified, LLCKovilic Construction

B. BID SECURITY (TYPE AND AMOUNT)

20%

C. AMENDMENTS ACKNOWLEDGED

ABSTRACT OF BIDS - Construction 1. SOLICITATION NUMBER

W911XK22B0005

4. ISSUING OFFICE

A. Hired Labor

5. PROJECT TITLE

US Army Corp of Engineers Contracting Branch, Detroit District

Battle Creek Dam Improvement Project

I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to the solicitation.

8. GOVERNMENT ESTIMATE

SIGNATURE DATE SIGNED

9. OFFERS

NO. 1 NO. 2

A. OFFEROR:

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Sandra M. Kenzie

C.Reasonable Contract (With Profit)

X B. Reasonable Contract (Without Profit)

7A. ITEM

NO

7C. EST.

QUANTITY7B. DESCRIPTION OF OFFERED ITEM

D. UNIT

6. Number of Amendments Issued

Well Decommissioning - Sand Fill

E. UNIT PRICE

A. OFFEROR:

20%

N/A

B. BID SECURITY (TYPE AND AMOUNT)

C. AMENDMENTS ACKNOWLEDGED

H7ZA9SMK

Typewritten Text 13 Sept 2022

PAGE OF PAGES

2 2

B. ESTIMATED

QUANTITY C. UNIT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT D. UNIT PRICE E. ESTIMATED

AMOUNT

0001 1 JA 180,000.00$ 180,000.00$

002 1 JA 50,000.00$ 50,000.00$

003 1 JA 175,000.00$ 175,000.00$

004 1 JA 25,000.00$ 25,000.00$

00005 1 JA 35,000.00$ 35,000.00$

00006 1 JA 20,000.00$ 20,000.00$

00007

0007AA 40 CuFt 200.00$ 8,000.00$

0007AB 350 CuFt 200.00$ 70,000.00$

00008

0008AA 40 CuFt 400.00$ 16,000.00$

0008AB 20 CuFt 400.00$ 8,000.00$

00009 1 JA 28,000.00$ 28,000.00$

615,000.00$

00010 1 JA 25,000.00$ 25,000.00$

25,000.00$

00011 1 JA 25,000.00$ 25,000.00$

25,000.00$

665,000.00$ Total Amount of Bid and All Options

INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

Option 2

Total for Option 2

Total for Option 1

7A. ITEM

NO

Option 1

Total for Base

20%

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

N/A

B. BID SECURITY (Type and Amount) Bid Bond 20% B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

Battle Creek Dam Improvement Project

NO. 3 NO. 4 NO. 5 NO. 6

A. OFFEROR: A. OFFEROR: A. OFFEROR: A. OFFEROR:

Griffith Builders Inc.

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER

W911XK22B0005

2. PROJECT TITLE 4. OFFERS (Continued)

2022-09-13T19:19:18-0400
KENZIE.SANDRA.MARIE.1384380553

File details come from the government source that posted it. Updated .