Bid Abstract W911XK22B0001.pdf

PDF 291 KB Posted

Attached to
Manistee South Breakwater Repair, Manistee, MI
Solicitation number
W911XK22B0001
Issued by

About this file

This abstract of bids is for the Manistee South Breakwater Repair construction project solicited by the U.S. Army Corps of Engineers Detroit District. The solicitation seeks firms to mobilize to the Manistee South Breakwater in Manistee, Michigan to remove existing armor stone and construct a steel sheet pile encapsulation of the existing timber crib structure. Voids in the encapsulation are to be filled with graded stone, and a concrete cap is to be placed on top with armor stone at the toe of the sheet pile. The government estimate for construction costs is between $1-5 million. Three bids were received by the June 6th deadline ranging from $1.9-3.3 million. The North American Industry Classification System code for this project is 237990. This firm-fixed price contract is set aside 100% for HUBZone small businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

05/06/2022 06/06/2022 1 1

MOBILIZATION &

DEMOBILIZATION

1 Job $ 204,152.00 $ 204,152.00 $ 228,126.00 $ 228,126.00 $ 257,260.00 $ 257,260.00

002 Demolition 1 Job $ 146,264.00 $146,264.00 $ 71,455.00 $ 71,455.00 $ 48,000.00 $ 48,000.00

00003 Required Seteel Sheet Piles

Structure 1 Job $ 1,102,033.00 $1,102,033.00 $ 1,369,402.00 $ 1,369,402.00 $ 916,000.00 $ 916,000.00

0004AA FIRST 1,242 Tones 1,242 Ton $ 209.00 $ 259,578.00 $ 66.29 $ 82,332.18 $ 60.00 $ 74,520.00

0004AB OVER 1,242 Tons 532 Ton $ 209.00 $ 111,188.00 $ 62.87 $ 33,446.84 $ 60.00 $ 31,920.00

00005

0005AA First 1,017 Ton 1,017 ton $ 276.00 $ 280,692.00 $ 138.54 $ 140,895.18 $ 100.00 $ 101,700.00

0005AB Over 1,017 Ton 436 Ton $ 276.00 $ 120,336.00 $ 77.63 $ 33,846.68 $ 100.00 $ 43,600.00

00006 Required Required Reinforced Concrete

1 Job $ 181,338.00 $ 181,338.00 $ 225,646.00 $ 225,646.00 $ 240,000.00 $ 240,000.00

00007 Required Reinforced Concrete Cap 1 Job $ 227,435.00 $ 227,435.00 $ 237,726.00 $ 237,726.00 $ 200,000.00 $ 200,000.00

$ 2,633,016.00 $ 2,422,875.88 $ 1,913,000.00

E. UNIT PRICE

F. ESTIMATED

AMOUNT

Required Rubble Protection Stone

Section 0 & 0-1 Demo & Repair

Section P & Q Repair

D. UNIT PRICE

E. ESTIMATED

AMOUNT

D. UNIT PRICE

E. ESTIMATED

AMOUNT

TOTAL AMOUNT OF BID

Required Fill Stone (1-3")

20%

N/A

B. BID SECURITY (TYPE AND AMOUNT)

C. AMENDMENTS ACKNOWLEDGED

Roen SalvageGreat Lakes Dock and Materials

B. BID SECURITY (TYPE AND AMOUNT)

20%

C. AMENDMENTS ACKNOWLEDGED

n/a

ABSTRACT OF BIDS - Construction

1. SOLICITATION NUMBER

W911XK22B0001

4. ISSUING OFFICE

A. Hired Labor

5. PROJECT TITLE

US Army Corp of Engineers Contracting Branch, Detroit District

Manistee South Breakwater Repair

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Travis Specht I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to the solicitation.

8. GOVERNMENT ESTIMATE

SIGNATURE DATE SIGNED

A. OFFEROR:

9. OFFERS

NO. 1 NO. 2

A. OFFEROR:

C.Reasonable Contract (With Profit)

X B. Reasonable Contract (Without Profit)

7A. ITEM

NO

7C. EST.

QUANTITY7B. DESCRIPTION OF OFFERED ITEM

D. UNIT

6. Number of Amendments Issued

2. DATE ISSUED 3. DATE OPENED PAGEOF PAGES

05/06/2022 06/06/2022 2 2

MOBILIZATION &

DEMOBILIZATION

1 Job $ 391,000.00 $ 391,000.00

002 Demolition 1 Job $ 343,665.00 $ 343,665.00

00003 Required Seteel Sheet Piles

Structure 1 Job $ 1,392,000.00 $ 1,392,000.00

0004AA FIRST 1,242 Tones 1,242 Ton $ 162.40 $ 201,700.80 0004AB OVER 1,242 Tons 532 Ton $ 162.40 $ 86,396.80 00005

0005AA First 1,017 Ton 1,017 ton $ 197.20 $ 200,552.40 0005AB Over 1,017 Ton 436 Ton $ 197.20 $ 85,979.20

00006 Required Required Reinforced Concrete

1 Job $ 285,575.00 $ 285,575.00

00007 Required Reinforced Concrete Cap

1 Job $ 320,750.00 $ 320,750.00

$ 3,307,619.20

Required Rubble Protection Stone

Section P & Q Repair

TOTAL AMOUNT OF BID

D. UNIT PRICE E. ESTIMATED AMOUNT

Section 0 & 0-1 Demo & Repair

Required Fill Stone (1-3")

7A. ITEM

NO 7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D. UNIT E. UNIT PRICE

F.

ESTIMA

TED

6. Number of Amendments Issued C.Reasonable Contract (With Profit)

C. AMENDMENTS ACKNOWLEDGED

0 N/A

X B. Reasonable Contract (Without Profit)

B. BID SECURITY (TYPE AND AMOUNT)

20%

A. Hired Labor

A. OFFEROR:

Maverick Construction

DATE SIGNED

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

9. OFFERS

Manistee South Breakwater Repair

NO. 3

ABSTRACT OF BIDS - Construction

1. SOLICITATION NUMBER

W911XK22B0001

4. ISSUING OFFICE I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

US Army Corp of Engineers Travis Specht Contracting Branch, Detroit District SIGNATURE