This document provides an amendment to a solicitation and responses to requests for information related to the FY21 Detroit River and Pointe Mouillee CDF Maintenance Dredging project. The U.S. Army Corps of Engineers is seeking contractors through an invitation for bid to conduct maintenance dredging of the Pointe Mouillee South Inner Channel and East Outer Channel in Monroe County, Michigan. Dredged materials will be placed in the Pointe Mouillee Confined Disposal Facility Cell #3. Additional work includes installing 200 linear feet of rodent barrier and replacing two range lights. The estimated cost of construction is between $1-5 million. The North American Industry Classification System code applicable to this small business set-aside contract is 237990.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W911XK21B0001 for FY21 Detroit River and Pointe Mouillee CDF Maintenance Dredging is amended to update sections of the specifications and provide responses to the Requests for Information (RFI). Please see following pages for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911XK21B0001
X 9B. DATED (SEE ITEM 11)
26-Jan-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
11-FEB-2021
CODE
U.S.ARMY ENGINEER DISTRICT, DETROIT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1X
W911XK21B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
Solicitation Amendment No. 0001 For Solicitation No. W911XK21B0001 FY21 Detroit River and Pointe Mouillee CDF Maintenance Dredging
CHANGES TO SPECIFICATIONS
SECTION 35 20 23 – DREDGING
DELETE: The text for Section 1.13.3 Titled “Shoals” No shoaled material above the required pay prism line will be allowed for final acceptance.
ADD: The following text for Section 1.13.3 Titled “Shoals” No shoaled material above the required pay prism line will be allowed for final acceptance except at the discretion of the contracting officer. Refer to specification section 35 20 23 paragraph 3.7.1 titled “Examination” for description of shoals that can remain in place at the discretion of the contracting officer.
DELETE: The text for Section 3.7.1 Titled “Examination” As soon as practicable after the completion of the entire work or any section thereof (if the work is divided into sections) as in the opinion of the Contracting Officer will not be subject to damage by further operations under the contract, such work will be thoroughly examined at the cost and expense of the Government by sounding or by sweeping, or both, as determined by the Contracting Officer. Should any shoals, or other lack of contract depth be disclosed by this examination, the Contractor is required to remove same by dragging the bottom or by dredging at the contract rate for dredging, but if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of such shoals may be waived at the discretion of the Contracting Officer. The Contractor or its authorized representative will be notified when soundings and/or sweepings are to be made and will be permitted to accompany the survey party. When the area is found to be in a satisfactory condition, it will be accepted finally. Should more than two
(2) sounding or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of such third and any subsequent sounding or sweeping operations will be charged against the Contractor at the rate of $3,500 per calendar day in which the Government plant is engaged in sounding or sweeping and/or is enroute to or from the site or held at or near the said site for such operations.
ADD: The following text for Section 3.7.1 Titled “Examination” As soon as practicable after the completion of the entire work or any section thereof (if the work is divided into sections) as in the opinion of the Contracting Officer will not be subject to damage by further operations under the contract, such work will be thoroughly examined at the cost and expense of the Government by sounding or by sweeping, or both, as determined by the Contracting Officer. Should any shoals, or other lack of contract depth be disclosed by this examination, the Contractor is required to remove same by dragging the bottom or by dredging at the contract rate for dredging, but if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of such shoals may be waived at the discretion of the Contracting Officer. Shoals that are not in compliance with paragraph 1.13.3 titled “Shoals” but are not due to negligence of the contractors dredging operations but outside factors to include but not limited to clay, virgin material, cobbles, shoals forming from shipping traffic, from weather, currents, maybe we waived at the discretion of the Contracting Officer. Any shoals determined to be left above project depth due to negligence by the contractor during dredging operations, shall be removed by the contractor at no additional cost to the Government. The Contractor or its authorized representative will be notified when soundings and/or sweepings are to be made and will be permitted to accompany the surveyparty. When the area is found to be in a satisfactory condition, it will be accepted finally. Should more than two (2) sounding or sweeping operations by the Government over an area be necessary by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of such third and any subsequent sounding or sweeping operations will be charged against the Contractor at the rate of $3,500 per calendar day in which the Government plant is engaged in sounding or sweeping and/or is enroute to or from the site or held at or near the said site for such operations.
DELETE: The text for Section 3.6 Titled “Measurement” The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. Prior, after and check surveys will be made by sonic sounding methods. The Government will make prior and after surveys and may make check surveys. Measurements for final payment shall be based on Government surveys. Measurements for progress payment are based on contractors check surveys. The Contractor shall make check surveys. Once the Government completes after dredge surveys, any material determined to be left above project depth will be removed by the Contractor at no additional cost to the Government. Additional soundings will be taken as the Contracting Officer may deem necessary. Only one (1) prior survey will be made for work required under each contract, by the Government. If additional prior surveys are required, due to the Contractor's operations, the cost of such surveys shall be paid by the Contractor. The cost of such surveys shall be the same as specified in the Paragraph entitled, "FINAL EXAMINATION AND ACCEPTANCE."
ADD: The following text for Section 3.6 Titled “Measurement” The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. Prior, after and check surveys will be made by sonic sounding methods. The Government will make prior and after surveys and may make check surveys. Measurements for final payment shall be based on Government surveys. Measurements for progress payment are based on contractors check surveys. The Contractor shall make check surveys. Once the Government completes after surveys, any material determined to be left above project depth on the government after surveys will be removed by the contractor at no additional cost to the Government. Refer to section 35 30 23 paragraph 1.10 titled “Contract Compliance” that contract compliance is based off the Government after surveys. Additional soundings will be taken as the Contracting Officer may deem necessary. Only one (1) prior survey will be made for work required under each contract, by the Government. If additional prior surveys are required, due to the Contractor's operations, the cost of such surveys shall be paid by the Contractor. The cost of such surveys shall be the same as specified in the Paragraph entitled, "FINAL EXAMINATION AND
ACCEPTANCE."
RFI Questions W911XK21B0001 FY21 Detroit River and Pointe Mouillee CDF Maintenance Dredging:
1. There is a discrepancy in the dredging acceptance criteria, in section 35 20 23 3.7.1 it states the contracting officer will have discretion on acceptance of shoal areas within dredged areas. While in section 35 20 23 1.10 it states that all areas examined in accordance with paragraph 1.13.3 Shoals criteria and will be required to be removed at no additional cost to the government. Which statement is the controlling statement for contract acceptance?
Response: In section 1.13.3: No shoaled material above the required pay prism line will be allowed for final acceptance except at the discretion of the contracting officer. Refer to specification section 35 20 23 paragraph
3.7.1 titled” Examination” for description of shoals that can remain in place at the discretion of the contracting officer. See changes to the Specifications in Amendment 0001 attached.
Then in section 3.7.1 Add: Shoals that are not in compliance with paragraph 1.13.3 titled “Shoals” but are not due to negligence of the contractors dredging operations but outside factors to include but not limited to clay, virgin material, cobbles, shoals forming from shipping traffic, from weather, currents, maybe we waived at the discretion of the COR. Any shoals determined to be left above project depth due to negligence by the contractor during dredging operations, shall be removed by the contractor at no additional cost to the Government”. See changes to the Specifications in Amendment 0001 attached.
2. After the contractor reaches contract volume in the final section of the contract, leaving that section of work only partial complete. Will the contractor be required to remove any material flagged in accordance with 30 20 23 1.10 Contract Compliance within the area partial dredged at the contractor’s expense?
Response: The contractor is required to dredge in a fashion that the channel is clear down to project depth with no shoals remaining in accordance with specification section 35 30 23 paragraph 3.7.1 and 1.13.3. If the contractor reaches the final stations of dredging and all areas from the upstream limit to downstream limit or vice versa are clear but the contractor reaches contract volume and cannot travel any further or remove material down to project depth then the contractor will not be required to remove shoaling at his own expense. A modification will be issued to remove the remaining material down to project depth if funding allows or it will be noted on the final cut sheets, daily reports, and final surveys of the ending cross sections of the contract.
3. Due to the requirements in 30 20 23 1.10 Contract Compliance- Are full coverage multibeam survey required for any and/or all progress payments?
Response: The contractor can use single beam or multibeam for progress payments, the final payment is based off government prior and after surveys and the 100% of the AB items on the contract will not be paid until the government completes their after surveys and agrees on the final quantity removed and visually inspects for channel clearance and that no shoals remain above project depth that are not in accordance with 35 30 23 paragraphs 1.13.3 and 3.7.1
4. Will QC contractor’s surveys showing completion of a section prior to infill events from natural causes including shipping traffic be required to be full coverage multibeam surveys? What order of hydrographic survey will be required for final acceptance?
Response: We amended the text in section 35 20 23 Paragraph 3.6 titled “Measurement” to read that “Once the Government completes after surveys, any material determined to be left above project depth on the government after surveys will be removed by the contractor at no additional cost to the Government. Refer to section 35 30 23 paragraph 1.10 that contract compliance is based off the Government after surveys. See changes to the Specifications in Amendment 0001 attached.
(End of Summary of Changes)
5. Will USACE identify all areas within the contract that have material above project grade that are not materials removed in maintenance dredging contracts, for example undisturbed lake bed sediments like rock or clays? If not by what method will such areas be identified to be exempt from 30 20 23 1.10 Contract Compliance and requiring re-dredging with equipment not required for standard maintenance dredging operations?
Response: Refer to sections 35 20 23 paragraph 3.1.2 titled “Obstructions” and specification section 01 22 00.00 paragraphs titled “payments”
6. The Range Light Specification (35 20 23, 3.3.6.6.1.4.a) say "Red/Green/Amber/Clear" instead of specifying one color. The light comes in any of these colors, but a color must be specified. For each of the two range lights, what color is required?
Response: The range lights color should be amber.