About this file

This document provides details on a federal contract solicitation for maintenance dredging services. The U.S. Army Corps of Engineers Detroit District is seeking contractors to dredge within delineated limits in Ontonagon Harbor, Michigan. Work will include mobilizing equipment to the harbor, dredging via an unrestricted method, and placing dredged materials at a beach nourishment site as shown in the plans. The estimated price for construction is between $500,000 and $1,000,000. This is a firm-fixed price and 100% small business set-aside contract solicited under NAICS code 237990 with a size standard of $30 million in average annual receipts. The solicitation package is available electronically via beta.sam.gov and interested contractors must register in the System for Award Management prior to bid submission. The questions and answers document provides clarification on water quality certification requirements and responsibilities for the dredging project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # W91XK-20-B-0011 FY20 Ontonagon Harbor MD

Number

Date/Time Received in Outlook

(Govt Exchange Server)

Answer Initials of Respondant

1 6/19/2020 1:08PM

The 401 Water Quality Certification was obtained by the USACE in 2018 and is valid for 5 years for placement of dredged material. See 401 certification for conditions of dredged material discharge into the specified shoreline site. Note: the Corps does not obtain a 401 water quality certification for the act of dredging within our federal navigation channel. EAB

Solicitation Issued June 8, 2020

Question

Questions Close 2/15/

In reference to Spec section 01 57 19; Is discharge into navigable waters allowable, without additional measures of containment pit/water quality testing being required? Is the Contractor responsible for obtaining the 401 Water Quality Certification?

Date/Time Answered

7/2/2020

/2020 ??