Submittal_Register.pdf

PDF 21 KB Posted

Attached to
Maintenance Dredging at the Saginaw River, Michigan
Solicitation number
W911XK-15-B-0008
Issued by

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
W911XK-15-B-0008_P00002.pdf PDF
Specification_Section_22_05_83.63.pdf PDF
W911XK-15-B-0008_P00001.pdf PDF
Plans.pdf PDF
Specifications.pdf PDF
W911XK-15-B-0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

FY15 MD Saginaw

01 10 10 SD-01 Preconstruction Submittals

1.2.2 G REOAdditional Property Agreements

Certified Survey Results 01 33 00 SD-01 Preconstruction Submittals

1.1.1 G AOFSubmittal register

01 35 13.10 SD-01 Preconstruction Submittals

1.7.2Payrolls and Basic Records G AOFActivity Hazard Analysis (AHA)

1.7.1 G AOFAccident Prevention Plan

G AOFEnvironmental Protection Plan G AOFContractor Quality Control Plan

1.7.3 G AOFProgress Chart

SD-07 Certificates Survey Technician's Qualifications

01 35 26 SD-01 Preconstruction Submittals 1.6Accident Prevention Plan (APP)

Activity Hazard Analysis (AHA) Crane Critical Lift Plan Crane Operators Fall Protection and Prevention Plan

SD-06 Test Reports 1.11Notifications and Reports

Accident Reports Crane Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

01 35 26 SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit

License Certificates 1.11.4Certificate of Compliance

01 45 04.00 10 SD-01 Preconstruction Submittals 3.2Quality Control Plan

01 57 20.00 20 SD-01 Preconstruction Submittals Environmental Protection Plan

22 05 83.63 SD-03 Product Data 2.1.1CIPP Liner

2.1.1 G AOFCIPP Lining Tube

1.2 G AOFThermoset Resin

SD-08 Manufacturer’s Instructions 3.1CIPP Manufacturer's Written

Installation Instructions SD-09 Manufacturer’s Field Reports

3.1.4 G AOFPipe Lining Installation

3.4 G AOFPre-Lining Inspection

3.4 G AOFPost-Lining Inspection

31 00 00 SD-01 Preconstruction Submittals GDewatering Work Plan

35 20 23.13 SD-01 Preconstruction Submittals G AOFDredge Plant Instrumentation

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

35 20 23.13 G AOFContractor Quality Control Plan SD-06 Test Reports

G AOFData Appropriately Archived e-mail

SD-07 Certificates G AOFLetter of National Dredging

Quality Management Program Certification

35 20 23 SD-01 Preconstruction Submittals Sounding Equipment Description and Calibration Data;

G AOFDredging, Conveyance and Placement Plan

G AOFDredging Placement Safety Plan;

G AOFNotice of Start of Dredging;

SD-02 Shop Drawings Soundings

SD-06 Test Reports G AOFDaily Report of Dredging

Operations;

SD-11 Closeout Submittals Material Disposal Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .