FY14_La_Pointe_Harbor_MD_100__Plans.pdf

PDF 1 MB Posted

Attached to
Maintenance Dredging at LaPointe Harbor Award Federal contract opportunity
Solicitation number
W911XK-14-B-0016
Issued by
Department of the Army Corps of Engineers Engineering District Detroit

About this file

plans

View the file

Other files for this federal contract opportunity

Other files attached to Maintenance Dredging at LaPointe Harbor Award, newest first.
File Type Posted
Lapointe_Construction_Abstract.pdf PDF
LaPointe_amendment_2.pdf PDF
LaPointe_amendment_1.pdf PDF
FY14_MD_La_Point_100__Specs.pdf PDF
Lapointe_MD_solicitation_-_FBO_posted_Aug_6.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CS101

GENERAL NOTES AND DRAWING INDEX

GENERAL PLAN, LOCATION MAP, VICINITY MAP,

DREDGE PLAN - REQUIRED DREDGING

AND REAL ESTATE PLAN

PLACEMENT PLAN - UPLAND PLACEMENT SITE PLAN

GI001

CN101

REAL ESTATE PLAN - OFFLOAD/TRANSFER AREARR101

GOVERNMENT-FURNISHED UPLAND PLACEMENT AREA.

REQUIREMENTS FOR PLACEMENT OF DREDGED MATERIALS WITHIN THE

SECTION 35 20 23 OF THE SPECIFICATIONS FOR INFORMATION REGARDING

THE CONTRACTORS ATTENTION IS DIRECTED TO THE SCOPE OF WORK AND8.

THE AUTHORIZED DEPTH FOR LA POINTE HARBOR IS 8.0 AND 10.0 FT. BELOW L.W.D.7.

NORTH ZONE (4801), 1983 NORTH AMERICAN DATUM (NAD 83), U.S. SURVEY FOOT.

PROJECTION, WISCONSIN SYSTEM OF STATE PLANE COORDINATES,

THE GRID COORDINATE SYSTEM SHOWN IS BASED ON THE LAMBERT6.

HORIZONTAL AND VERTICAL CONTROL.

REFER TO THE SPECIFICATIONS FOR FURTHER INFORMATION REGARDING5.

AT RIMOUSKI, QUEBEC, (I.G.L.D. 1985). SOUNDINGS ARE SHOWN AS THUS: -9.7.

QUEBEC, (I.G.L.D. 1985). ELEVATIONS ARE REFERRED TO MEAN WATER LEVEL

LAKE SUPERIOR, ELEVATION 601.1 FT. ABOVE MEAN WATER LEVEL AT RIMOUSKI,

ALL DEPTHS AND CONTOURS ARE REFERRED TO LOW WATER DATUM (L.W.D.) FOR 4.

MARKED REQUIRED.

DREDGING WORK UNDER THIS CONTRACT FOR THE CONDITIONS SHOWN IS 3.

SOUNDINGS TAKEN WITHIN THE UPSTREAM AND DOWNSTREAM LIMITS SHOWN.

NEW 8.0 FT. AND 10.0 FT. DEPTH CONTOUR OBTAINED FROM PRIOR TO DREDGING

MAINTENANCE DREDGING AREAS WILL BE REVISED TO CONFORM TO THE

RESULT OF THE SURVEYS INDICATED HEREINBEFORE. THE REQUIRED

UPON THE 8.0 FT AND 10.0 FT DEPTH CONTOURS THAT ARE THE

THE REQUIRED DREDGING AREAS AT LA POINTE HARBOR, WI ARE BASED2.

INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME.

AREA OFFICE on 27 MAY 2014 AND CAN ONLY BE CONSIDERED AS

RESULTS OF AUTOMATED HYDROGRAPHIC SURVEYS BY THE DULUTH

THE INFORMATION DEPICTED ON SHEET 2 REPRESENTS THE 1.

INDEX TO DRAWINGS

DESCRIPTIONSHEET ID SHEET

MICHIGAN

ILLINOIS

INDIANA OHIO

LAKE SUPERIOR

GEORGIAN

BAY

LA

KE

ERI

E

CANADA

0 5025 75 100

LAKE HURON

MICHIGAN

LAKE

US Army Corps of Engineers

Detroit District

N

LOCATION MAP SCALE OF MILES

PARKING

WOOD

W

ALL

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

D O C

K

D O C

K

W

IR

E

W O

O D

BREAKW

ATER

M I

D D L E

S T

M A I

N

S T R E E T

MADALINE ISLAND AIRPORT

BIG

B

AY

RD

F O

R T

R

D

CHEBOMNICON RD

R

IC

E

S T

VOYAGER LN

SUNNY SLOPE RD

M A

N D

A M

IN

R

A

IL

MILLER

THIER EMPLOYMENT AS REQUIRED BY ER 1110-1-8152

APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF

SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS

THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR

THIS PROJECT WAS DESIGNED BY THE DETROIT DISTRICT OF

WILLIAM D. MERTE P.E., CHIEF COST & GENERAL ENGINEERING BRANCH

MICHAEL K. O’BRYAN P.E., CHIEF ENGINEERING & TECHNICAL SERVICES

SHEET OF

GI001

LA POINTE HARBOR

PHILLIP C. ROSS P.E., CHIEF ENGINEERING & CONSTRUCTION OFFICE

UPLAND PLACEMENT SITE

G E

N E

R A

L N

O T

E S A

N D D

R A

W

IN

G I

N D

E X

G E

N E

R A

L P

L A

N L

O C

A T

IO

N M

A P

V

IC

IN

IT

Y M

A P

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

SHEET OF

fi

S

A AF

E

Y

Y

T

P S

C O

R P

O F

G

IN

E E

R S

D E

T R

IT

D

IS

T R

IC

T

In c r e a s e

P r o f it .S u b m it

V

E C

P ’S

V a lu e n g in e e r in g

T R

O

IT

M

IC

H

IG

A N

D E

T R

O

IT

D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

X

W M

W

X K -1

-B -0

Detroit District of Engineers

US Army Corps

J

U N

E

B

C O

E J

U N

P R

O S

S

F Y

M

A

IN

T E

N A

N C

E D

R E

D G

IN

G L

A P

O

IN

T E H

A R

B O

R

W

IS

C O

N S

IN

A W

A W

J

U N

R

E A

D Y T

O A

D V

E R

T

IS

E

INTERNATIONAL

BOUNDARY

I N T E

RNATI

ONAL

MINNESOTA

SOO

KEWAUNEE

WISCONSIN

GRAND HAVEN

SAGINAW

DETROIT NDARY

B O

DULUTH

PROJECT

LOCATION

U

LA POINTE HARBOR

B R

E A

K W

A T

E R

D O

C K

F E

R R

Y

L I G

H T

G R

E E

N

L I G

H T

N O

R T

H

L A

P

L I G

H T

S O

U T

H

L A

P

L A

P

L

A

K

U

A

P O I N

T E

N 589,000

LA POINTE HARBOR, WISCONSIN

FY14 MAINTENANCE DREDGING

VICINITY MAP

GENERAL PLAN

GENERAL NOTES

LA POINTE

DREDGE PLAN

-15.3

-14.9

-14.8

-14.7

-14.6

-14.6 -14.6

-14.5 -14.5

-14.4

-14.2

-14.2

-14.2

-14.1

-14.1

-14.0

-13.9

-13.9

-14.0

-14.0

-13.8

-13.8 -13.8

-13.8

-13.8

-13.8

-13.7

-13.7

-13.7

-13.7

-13.7

-13.7

-13.7

-13.7

-13.7

-13.6

-13.6

-13.6

-13.6

-13.6

-13.5

-13.6

-13.4

-13.4

-13.4

-13.4

-13.4

-13.3

-13.3

-13.2

-13.2

-13.2

-13.2

-13.1

-13.2

-13.1

-13.2 -13.1

-13.0

-12.9

-12.9

-12.9

-12.8

-12.8

-12.8

-12.8

-12.8

-12.8

-12.8

-12.7

-12.6

-12.5

-12.5

-12.6

-12.6

-12.5

-12.5

-12.6

-12.4

-12.4

-12.3

-12.3 -12.3 -12.3

-12.3

-12.3

-12.1

-12.1

-12.1

-12.2

-12.2

-11.9

-11.9

-11.9

-11.9

-11.8

-11.7

-11.7

-11.7

-11.6

-11.5

-11.5

-11.4

-11.3

-11.3

-11.3

-11.1

-11.2

-11.1

-10.9

-10.9

-10.8

-10.8

-10.8

-10.6

-10.6

-10.4

-10.3

-10.3

-10.1

-10.2

-10.2

-10.2 -10.2

-10.0

-10.0

-10.0

-9.9

-9.8

-9.9

-9.8

-9.7

-9.7

-9.7

-9.7

-9.7

-9.7 -9.7 -9.7

-9.5

-9.4

-9.2 -9.3

-9.3

-9.2

-9.3

-9.1

-9.1

-9.1

-9.1

-9.0

-9.0

-9.0

-9.0

-9.0

-9.0

-9.0

-9.0

-9.0 -9.0

-9.0

-8.9 -8.9

-8.9

-8.7

-8.7

-8.8

-8.7

-8.8

-8.7

-8.7

-8.7

-8.8

-8.8

-8.6

-8.6

-8.6

-8.6

-8.6

-8.6

-8.6

-8.6

-8.4

-8.5

-8.4

-8.5

-8.5

-8.4

-8.5

-8.5

-8.4

-8.5

-8.3

-8.3 -8.3

-8.3

-8.3

-8.3

-8.1 -8.1

-8.1

-8.1

-8.1

-8.1

-8.0

-8.0

-8.0

-7.9

-7.8

-7.9

-7.9

-7.9

-7.7

-7.7

-7.7

-7.7 -7.7

-7.7

-7.6

-7.6

-7.6

-7.6

-7.6

-7.6

-7.6

-7.6

-7.6

-7.5

-7.5

-7.5

-7.4

-7.4

-7.4

-7.4

-7.3

-7.4

-7.3

-7.4

-7.4

-7.4

-7.3

-7.4

-7.3

-7.2

-7.2

-7.2

-7.2

-7.2

-7.2

-7.0

-7.0

-7.1 -7.1 -7.0 -7.0

-7.0

-7.0

-7.0

-7.1

-7.0

-7.1 -7.0

-6.9

-6.9

-6.9 -6.9

-6.8

-6.8

-6.8

-6.8

-6.7

-6.7

-6.6

-6.5

-6.5

-6.5

-6.3

-6.3

-6.2 -6.2 -6.2

-6.2

-6.2

-6.2

-6.1

-5.9

-5.9

-5.6

-5.6

-5.4

-5.3

-5.3

-5.3

-5.3

-5.2

-5.2

-5.1

-5.1

-5.1

-4.8

-4.8

-4.8

-4.8

-4.8

-4.7

-4.7

-4.6

-4.6

-4.5

-4.5

-4.5

-4.3

-4.3

-4.3

-4.3

-4.2

-4.3

-4.2

-4.3

-4.1

-4.0

-4.1

-4.0

-3.9

-3.8

-3.7

-3.4

-3.3

-3.0

-3.0

-3.0

-3.0

-2.8

-2.5 -2.2 -1.9 -1.6

1A

1T

PARKING

E 1,770,500 E 1,770,500

E 1,771,000 E 1,771,000

W A

L L

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

W A L L

D O C

K

D O C

K

W

IR

E

W O

O D

B R

E A

K W

A T

E R

M A

R E E T

D O C

K

F E R

Y

W

C

A T

IO

P R

X

P.O.

IGLD85 604.07

TOP OF STEEL MARKED ON STEEL

GAUGE LOCATION RED SQUARE

N

2A

8.0 FT BELOW L.W.D.

REQUIRED DREDGING2

A N

S I T I

E A

10.0 FT BELOW L.W.D.

REQUIRED DREDGING

2T

SEE SHEET 4 OF 4

OFFLOAD/TRANSFER AREA

SURVEY CONTROL

STA. DESCRIPTION

COORDINATES

EASTINGNORTHING

NAV. AID NORTH LIGHT 588497.73 1770573.87

NAV. AID GREEN LIGHT 588679.95 1770747.69

NAV. AID SOUTH LIGHT 588348.16 1770823.80

LAP 3 BRASS DISK 588499.82 1770563.83

LAP 2 BRASS DISK 588872.22 1771226.73

LAP 1 BRASS DISK 589033.41 1770742.03

LAPOINTE BRASS DISK 588681.99 1770742.68

NORTHING EASTING

COORDINATE TABLE

COORDINATES

POINT DESCRIPTION

lap 1 lap 2 lap 3 lapointe channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

channel line pt.

ngs disk corps disk corps disk corps disk

588367.501 1770855.683

588495.299 1770934.379

588533.400 1770872.500

588960.792 1770914.173

588990.392 1770823.774

589015.692 1770792.775

588876.694 1770686.279

588849.295 1770721.979

588817.395 1770695.780

588795.295 1770722.880

588668.697 1770771.480

588640.598 1770698.282

588663.098 1770661.883

588535.300 1770583.186

589023.526 1770733.989

588872.115 1771226.360

588499.714 1770563.547

588681.874 1770742.310

1A

2A dredging limit dredging limit

1T transition area transition area2T

588297.680 1770969.070

588428.940 1771042.150

588779.230 1770729.050

588762.860 1770894.780

N

,5

N

,0

N

,5

N

,5

N

,0

N

,5

LAP-1

LAP-2

LAP-3

LIGHT

GREEN

LAPOINTE BREAKWATER

DOCK

FERRY

LIGHT

NORTH

LIGHT

SOUTH

L A K E S U P E R I O R

CN101

R E

Q U

IR

E D D

R E

D G

IN

G D

R E

D G

E P

L A

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

SHEET OF

fi

S

A AF

E

Y

Y

T

P S

C O

R

G

IN

E E

R S

D E

T R

T R

IC

T

In c r e a s e

P r o f it .S u b m it

V

E C

P ’S

V a g in e e r

T R

O

IT

M

IC

H

IG

A N

D E

T R

O

IT

D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

X

W M

W

X K -1

-B -0

Detroit District of Engineers

US Army Corps

J

U N

E

B

C O

E J

U N

P R

O S

S

F Y

M

A

IN

T E

N A

N C

E D

R E

D G

IN

G L

A P

O

IN

T E H

A R

B O

R

W

IS

C O

N S

IN

A W

A W

J

U N

R

E A

D Y T

O A

D V

E R

T

IS

E

LEGEND

HORIZONTAL CONTROL POINT

DREDGING LIMIT TURNING POINT

CHANNEL LINE TURNING POINT

SHORELINE

no.

CHANNEL LINE / DREDGE LIMIT

8.0 FT DEPTH CONTOUR

10.0 FT DEPTH CONTOUR

BELOW L.W.D.

REQUIRED DREDGING 8.0 FT

BELOW L.W.D.

REQUIRED DREDGING 10.0 FT

no.

SCALE IN FEET

050 50 100 150

PLACEMENT AND REAL ESTATE PLAN

TN GN

-0° 34’ 09"

(AT CENTER OF SHEET)

CS101

S

A AF

E

Y

Y

T

P S

C O

R

G

IN

E E

R S

D E

T R

T R

IC

T

In c r e a s e

P r o f it .S u b m it

V

E C

P ’S

V a g in e e r

T R

O

IT

M

IC

H

IG

A N

D E

T R

O

IT

D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

X

W M

W

X K -1

-B -0

J

U N

E

P R

O S

S

A W

A W

P A

R K I

N G

A I

R P

O

U

N W

A Y

P A

R K I

N G

WOODED AREA

WOODED AREA

WOODED AREA

M A

D E L I

N E

I S L

A

R P

O R T

BI

G

BAY

ROAD

(P

UBLI

C)

AREATO

PLACEMENT

ROAD

ACCESS

R E

A L E

S T

A T

E P

L A

N U

P L

A N

D P

L A

C E

M E

N T S

IT

E P

L A

N A

N D

P L

A C

E M

E N

T P

L A

N

D

A

B

C

DESCRIPTION

COORDINATES

EASTINGNORTHING

A

B

C

D

592813 1777643

592881 1777647

592910 1777684

592989 1777597

PLACEMENT AREA

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

SHEET OF

fi

Detroit District of Engineers

US Army Corps

B

C O

E J

U N

F Y

M

A

IN

T E

N A

N C

E D

R E

D G

IN

G L

A P

O

IN

T E H

A R

B O

R

W

IS

C O

N S

IN

J

U N

R

E A

D Y T

O A

D V

E R

T

IS

E

AND WATER TO THE PLACEMENT SITE.

TO CONFINE PLACED DREDGE MATERIAL

IN ACCORDANCE WITH SECTION 01 57 20.00 20

EROSION AND SEDIMENTATION CONTROL FEATURES

5. THE CONTRACTOR IS REQUIRED TO CONSTRUCT TEMPORARY

PLACEMENT SITE TOPOGRAPHIC SURVEY WAS CONDUCTED IN MAY 2014.

ONLY BE INTERPRETED AS REPRESENTATIVE OF CONDITIONS AT THAT TIME.

4. DRAWING IS BASED ON AERIAL IMAGERY DATED MAY 2011 AND CAN

35 20 23 FOR ADDITIONAL REQUIREMENTS.

OF DREDGE MATERIAL AND SPILLS. SEE SPECIFICATION SECTION

CONTRACTOR IS REQUIRED TO KEEP ALL PUBLIC THOROUGHFARES CLEAR3.

SECTION 01 10 10 FOR FURTHER INFORMATION.

BY THE CONTRACTOR AT ITS OWN EXPENSE. SEE SPECIFICATION

REAL ESTATE RIGHTS DESIRED BY THE CONTRACTOR SHALL BE OBTAINED

THE GOVERNMENT. ANY ADDITIONAL PROPORTY AGREEMENTS AND/OR

REAL ESTATE RIGHTS FOR THE PLACEMENT SITE HAVE BEEN OBTAINED BY2.

SLOPES, AND GRADING REQUIREMENTS.

ADDITIONAL REQUIREMENTS REGARDING MAXIMUM PLACEMENT HEIGHT, SIDE

THE SITE IS PROHIBITED. SEE SPECIFICATION SECTION 35 20 23 FOR

THE CONFINES OF THE PLACEMENT SITE. THE DISCHARGE OF WATER FROM

1. ALL PLACED DREDGED MATERIAL AND ASSOCIATED WATER SHALL REMAIN WITHIN

LEGEND

EDGE OF PAVEMENT

TREE LINE

EXISTING STRUCTURE

PLACEMENT LIMITS

DREDGE MATERIAL

SPOT ELEVATION

POINT

HORIZONTAL CONTROL

NOTES

P A

V E

M E

N T

P A

V E

M E

N T

BOX

ELECTRICAL

R C

A I

N

P I P E

S T

O C

K

P I L E

E X S I S T I

N G

S

A

MARKS

ELECT

MARKS

ELECT

M A

R K

S

E L

E C

T

M A

R K

S

E L

E C

T

D R

A I

N A

G

T C

H

D R

A I

N A

T C

H

SCALE IN FEET

050 50 100 150

E C

T R I

C

T E

R

D

E L

E C

T I

C A

L

FEDERAL CHANNEL LIMIT

NOTES

LEGEND

HORIZONTAL CONTROL POINT

CHANNEL LINE TURNING POINT

SHORELINE...

no.

CHANNEL LINE / DREDGE LIMIT

SITE

LIMITS OF OFFLOAD/TRANSFER

GATE

ACCESS

N

W A L L

W A L L

W A L L

W A L L

D O C

K

M A

R E E T

D O C

K

F E R

Y

W

C

A T

IO

P R

X

P.O.

EXISTING FENCE

EXISTNG FENCE

43 FT FROM

FOR ACCESS

PARKING SPOTS AVAILABLE

TWO SOUTHERNMOST

B U L

K H E

A D

F T

F R

PARKING

PAVED

LAP-1

DOCK

FERRY

RR101

O F F

L O

A D /T

R A

N S

F E

R S

IT

E R

E A

L E

S T

A T

E P

L A

N

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

SHEET OF

fi

S

A AF

E

Y

Y

T

P S

C O

R

G

IN

E E

R S

D E

T R

T R

IC

T

In c r e a s e

P r o f it .S u b m it

V

E C

P ’S

V a g in e e r

T R

O

IT

M

IC

H

IG

A N

D E

T R

O

IT

D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

X

W M

W

X K -1

-B -0

Detroit District of Engineers

US Army Corps

J

U N

E

B

C O

E J

U N

P R

O S

S

F Y

M

A

IN

T E

N A

N C

E D

R E

D G

IN

G L

A P

O

IN

T E H

A R

B O

R

W

IS

C O

N S

IN

A W

A W

J

U N

R

E A

D Y T

O A

D V

E R

T

IS

E

35 20 23 FOR ADDITIONAL REQUIREMENTS.

OF DREDGE MATERIAL AND SPILLS. SEE SPECIFICATION SECTION

CONTRACTOR IS REQUIRED TO KEEP ALL PUBLIC THOROUGHFARES CLEAR3.

SECTION 01 10 10 FOR FURTHER INFORMATION.

BY THE CONTRACTOR AT ITS OWN EXPENSE. SEE SPECIFICATION

REAL ESTATE RIGHTS DESIRED BY THE CONTRACTOR SHALL BE OBTAINED

THE GOVERNMENT. ANY ADDITIONAL PROPORTY AGREEMENTS AND/OR

REAL ESTATE RIGHTS FOR THE OFFLOAD AREA HAVE BEEN OBTAINED BY2.

REQUIREMENTS.

CONDITIONS. SEE SPECIFICATION SECTION 35 20 23 FOR ADDITIONAL

CONTRACTOR IS REQUIRED TO RESTORE OFFLOAD AREA TO PRE-PROJECT1.

REAL ESTATE PLAN

SCALE IN FEET

020 20 40 60

SHEET01-Default-000
SHEET02-Default-000
SHEET03-Default-000
SHEET04-Default-000

File details come from the government source that posted it. Updated .