Question and Answer For

FY14 Erie Pier Maintenance

W911XK-14-B-0006

As of May 21, 2014

Question 1) Do you know if the fender timbers used can be plastic?

Answer 1) Only timber fenders will be accepted is as shown and specified in the plans and specification.

Question 2) Plan page CG102 indicates to see Spec Section 31 32 11 for erosion control blanket and seeding requirements. There are no such sections attached to the specifications. Page 107 of the specifications ends with section 31 23 00.00 20 page 7.

Answer 2) Amendment 0002, updates the Specification file. Section 31 32 11 is included.

Question 3) Is there a more descriptive seed than MNDOT 250? What are dates for installation?

Answer 3) The details for the MNDOT 250 seed mix can be obtained from MNDOT's website, http://www.dot.state.mn.us/environment/erosion/pdf/seedingmanual.pdf .

Installation shall be in accordance with the MNDOT Seeding Manual within the duration of the contract.

Question 4) Is there a specification for a certain type of erosion control blanket?

Answer 4) Specification Section 31 32 11 addresses the erosion control blanket, this Section is added via amendment 0002.

http://www.dot.state.mn.us/environment/erosion/pdf/seedingmanual.pdf