10-T-0027-P2-Correct due date.pdf

PDF 35 KB Posted

Attached to
RECOVERY--99--Fabricate 4 each machinery enclosure assemblies for the Inland Route Lock
Solicitation number
W911XK-10-T-0027
Issued by

About this file

Amendment to correct the contract completion date that is in the Scope of Work

View the file

Other files

File Type Posted
10-T-0027-P3-Add Clauses.pdf PDF
10-T-0027-P1-Enclosure Drawing.pdf PDF
Crooked River Machinery Enclosure 2 of 2 —
10-T-0027-Enclosures.pdf PDF
10-T-0027-Enclosures.pdf PDF
Enclosure 1.pdf PDF
Enclosure 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES93502961

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

Amendment is being issued to change the delivery date in the Scope of Work from 15 January 2010, TO 30 days from aw ard of contract.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Dec-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-T-0027

X 9B. DATED (SEE ITEM 11)

22-Dec-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Dec-2009

CODE

CONTRACTING DIVISION

DETROIT DISTRICT, USAED

477 MICHIGAN AVE.

DETROIT MI 48226

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-T-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REVISED SCOPE OF WORK

TECHNICAL SPECIFICATION

FOR

MACHINERY ENCLOSURES FOR CROOKED RIVER LOCK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN WELDING SOCIETY (AWS)

AWS D1.2/D1.2M (2008) Structural Welding Code - Aluminum

ASTM INTERNATIONAL (ASTM)

ASTM B 209 (2007) Aluminum and Aluminum Alloy Sheet and

Plate

ASTM D 1056 (2007) Flexible Cellular Materials – Sponge or Expanded Rubber

ASTM D 2000 (2008) Rubber Products in Automotive

Applications

1.2 SYSTEM DESCRIPTION

This technical specification covers the supply of four (4) machinery enclosures.

1.3 LUMP SUM PRICES

1.3.1 Machinery Enclosures

1.3.1.1 Payment

Payment will be made for costs associated with each machinery enclosure as specified.

1.3.1.2 Unit of Measure

Unit of measure: lump sum.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted:

SD-01 Product Data

Welding of Steel; G

Schedules of welding procedures for steel, prior to commencing fabrication.

SD-02 Test Reports

Tests, Inspections, and Verifications

Certified test reports for materials with all materials delivered to the site.

1.5 HANDLING AND DELIVERY

1.5.1 Packaging

Packing, crating, cradles, etc. necessary to ensure safe shipment are the responsibility of the Contractor and shall become the property of the Government upon delivery of the equipment. Machined surfaces shall be adequately protected from corrosion and physical damage. Equipment delivered and placed in storage shall be stored with protection from the weather, humidity, temperature variation, dirt and dust, or other contaminants.

1.5.2 Shipping

Shipping of all parts to and from the Soo Area Office is the responsibility of the Contractor.

1.5.3 Final Delivery

All parts shall be delivered to the Soo Area Office no later than 1530 EST 15 January 2010 30 days after award.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 General

Materials and repairs shall conform to the requirements indicated or specified. If materials are not specified, then materials of the best commercial grade quality suited to the intended use and as approved shall be furnished.

2.1.2 Machinery Enclosure Assemblies

Four (4) machinery enclosure assemblies shall be fabricated. The work required for each part is detailed in the attached drawings. Material must meet ASTM B 209, alloy 5052, temper H32. All exterior surfaces shall have a brushed finish void of any weld marks. All welds must conform to AWS D1.2.

2.1.2.1 Machinery Enclosure Bolts

Eighty (80) 1/4"-20UNC X 1-1/2” long 316 stainless steel hex head bolts with flat washers and nuts shall be supplied.

2.1.2.2 Machinery Enclosure Concrete Anchors

Eighty (80) 3/8"-16UNC X 3” long 316 stainless steel wedge stud anchors with flat washers and nuts shall be supplied.

2.1.2.3 Machinery Enclosure Bottom Seals

Four (4) adhesive backed, closed cell, neoprene foam rubber strips 2” X 1/4" X 360” shall be supplied. Material shall meet ASTM D 1056, durometer 50 OO, temperature range -40 degrees F to 150 degrees F.

2.1.2.4 Machinery Enclosure Cover Seals

Neoprene rubber shall meet ASTM D 2000 BC, durometer 50 A, temperature range -40 degrees F to 150 degrees F.

2.1.2.5 Machinery Enclosure Cover Seal Adhesive

Adhesive must be compatible with neoprene rubber and aluminum.

PART 3 EXECUTION

3.1 SHOP ASSEMBLY

3.1.1 Shop Assembly of Machinery Enclosures

Each machinery enclosure shall be assembled before delivery to ensure proper fit of individual components.

(End of Summary of Changes)