10-T-0027-P2-Correct due date.pdf
PDF 35 KB Posted
- Solicitation number
- W911XK-10-T-0027
About this file
Amendment to correct the contract completion date that is in the Scope of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-T-0027-P3-Add Clauses.pdf | ||
| 10-T-0027-P1-Enclosure Drawing.pdf | ||
| Crooked River Machinery Enclosure 2 of 2 | — | |
| 10-T-0027-Enclosures.pdf | ||
| 10-T-0027-Enclosures.pdf | ||
| Enclosure 1.pdf | ||
| Enclosure 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES93502961
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
Amendment is being issued to change the delivery date in the Scope of Work from 15 January 2010, TO 30 days from aw ard of contract.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-T-0027
X 9B. DATED (SEE ITEM 11)
22-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Dec-2009
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
477 MICHIGAN AVE.
DETROIT MI 48226
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-T-0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REVISED SCOPE OF WORK
TECHNICAL SPECIFICATION
FOR
MACHINERY ENCLOSURES FOR CROOKED RIVER LOCK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.2/D1.2M (2008) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM B 209 (2007) Aluminum and Aluminum Alloy Sheet and
Plate
ASTM D 1056 (2007) Flexible Cellular Materials – Sponge or Expanded Rubber
ASTM D 2000 (2008) Rubber Products in Automotive
Applications
1.2 SYSTEM DESCRIPTION
This technical specification covers the supply of four (4) machinery enclosures.
1.3 LUMP SUM PRICES
1.3.1 Machinery Enclosures
1.3.1.1 Payment
Payment will be made for costs associated with each machinery enclosure as specified.
1.3.1.2 Unit of Measure
Unit of measure: lump sum.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted:
SD-01 Product Data
Welding of Steel; G
Schedules of welding procedures for steel, prior to commencing fabrication.
SD-02 Test Reports
Tests, Inspections, and Verifications
Certified test reports for materials with all materials delivered to the site.
1.5 HANDLING AND DELIVERY
1.5.1 Packaging
Packing, crating, cradles, etc. necessary to ensure safe shipment are the responsibility of the Contractor and shall become the property of the Government upon delivery of the equipment. Machined surfaces shall be adequately protected from corrosion and physical damage. Equipment delivered and placed in storage shall be stored with protection from the weather, humidity, temperature variation, dirt and dust, or other contaminants.
1.5.2 Shipping
Shipping of all parts to and from the Soo Area Office is the responsibility of the Contractor.
1.5.3 Final Delivery
All parts shall be delivered to the Soo Area Office no later than 1530 EST 15 January 2010 30 days after award.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
Materials and repairs shall conform to the requirements indicated or specified. If materials are not specified, then materials of the best commercial grade quality suited to the intended use and as approved shall be furnished.
2.1.2 Machinery Enclosure Assemblies
Four (4) machinery enclosure assemblies shall be fabricated. The work required for each part is detailed in the attached drawings. Material must meet ASTM B 209, alloy 5052, temper H32. All exterior surfaces shall have a brushed finish void of any weld marks. All welds must conform to AWS D1.2.
2.1.2.1 Machinery Enclosure Bolts
Eighty (80) 1/4"-20UNC X 1-1/2” long 316 stainless steel hex head bolts with flat washers and nuts shall be supplied.
2.1.2.2 Machinery Enclosure Concrete Anchors
Eighty (80) 3/8"-16UNC X 3” long 316 stainless steel wedge stud anchors with flat washers and nuts shall be supplied.
2.1.2.3 Machinery Enclosure Bottom Seals
Four (4) adhesive backed, closed cell, neoprene foam rubber strips 2” X 1/4" X 360” shall be supplied. Material shall meet ASTM D 1056, durometer 50 OO, temperature range -40 degrees F to 150 degrees F.
2.1.2.4 Machinery Enclosure Cover Seals
Neoprene rubber shall meet ASTM D 2000 BC, durometer 50 A, temperature range -40 degrees F to 150 degrees F.
2.1.2.5 Machinery Enclosure Cover Seal Adhesive
Adhesive must be compatible with neoprene rubber and aluminum.
PART 3 EXECUTION
3.1 SHOP ASSEMBLY
3.1.1 Shop Assembly of Machinery Enclosures
Each machinery enclosure shall be assembled before delivery to ensure proper fit of individual components.
(End of Summary of Changes)