Amendment 1.pdf
PDF 36 KB Posted
- Attached to
- 2010 Vessel Yard Concrete Replacement
- Solicitation number
- W911XK-10-B-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers W911XK-10-B-0007.pdf | ||
| Amendment 2.pdf | ||
| Amendment 1 Plans.zip | ZIP file | |
| Plans and Specifications.zip | ZIP file | |
| Duluth Vessel Yard Concrete Replacement Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES01698123
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY10 Duluth Vessel Yard Concrete Replacement Duluth, MN
This amendment is being issued to make the follow ing changes:
1. Incorporate a new bid schedule
2. Extend the completion date from 60 to 70 days
3. Make changes to the plans and specif ications
4. Revise FAR Clauses 52.211-10 and 52.236-4020, and to ADD FAR Clauses 52.217-7, 52.217-5, and EFAR Provision 52.214-5000.
The bid opening date remains unchanged. No other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0013
X 9B. DATED (SEE ITEM 11)
10-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2010
CODE
CONTRACTING DIVISION
DETROIT DISTRICT
477 MICHIGAN AVE
RM 700
DETROIT MI 48226-2550
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-B-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 01
PROJECT NAME: FY10 DULUTH VESSEL YARD CONCRETE REPLACEMENT DULUTH, MN
CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. UNIT PRICES PROVIDED BELOW WILL BE USED
TO DETERMINE LOW BID.
OFFERORS SHALL USE THE FOLLOWING SHEDULE TO SUBMIT THEIR BIDS.
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 Replace Vessel Yard Concrete
(Approx 11,000 Square Feet)
1 LS $____________ $_______________
0002 Duluth Area Office Entry 1 LS $____________ $_______________
0003 Option 1- Additional Sidewalk 1 LS $____________ $_______________
TOTAL AMOUNT OF BID (Including Option) $_______________
CHANGES TO THE SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
Add Section and Corresponding Attachment:
SECTION 03 33 00
CAST-IN-PLACE ARCHITECTURAL CONCRETE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI 211.1 (1991; R 2009) Standard Practice for
Selecting Proportions for Normal, Heavyweight, and Mass Concrete
ACI 211.2 (1998; R 2004) Standard Practice for Selecting Proportions for Structural Lightweight Concrete
ACI 301 (2005; Errata 2008) Specifications for
Structural Concrete
ACI 301M (2005; Errata 2008) Metric Specifications for Structural Concrete
ACI 318 (2008; Errata 2008; Errata 2009; Errata
2009; Errata 2009; Errata 2009; Errata 2009) Building Code Requirements for Structural Concrete and Commentary
ACI 318M (2008; Errata 2008; Errata 2009; Errata
2010) Building Code Requirements for Structural Concrete and Commentary
ACI 347 (2004) Guide to Formwork for Concrete
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM A 36/A 36M (2008) Standard Specification for Carbon
Structural Steel
1.2 SYSTEM DESCRIPTION
All materials, procedures, and requirements specified in Section 03 31 00.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE shall fully apply to cast-in-place architectural concrete, except as otherwise specified.
1.2.1 Concrete Mix Design
Each colored mix design shall be the same or approved equivalent to the mix design attached to this section.
1.2.2 Formwork Design
Design formwork conforming to ACI 301MACI 301 and ACI 347.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-04 Samples
Autumn Beige coarse aggregate
Panels
1.4 QUALITY ASSURANCE
1.4.1 Detail Drawings
1.4.2 Panels
Provide sample panels 12 inch by 12 inch by 2 inch Sample panels shall be used as job standards throughout construction. The panel shall incorporate the specified color and aggregate. Submit a sample panel for approval.
PART 2 PRODUCTS
2.1 MATERIALS
Submit samples of materials listed below, indicating sizes and shapes.
2.1.1 Coarse Aggregate
Aggregates for the Autumn Beige Concrete Mix Design shall conform to a ¾ inch round rock aggregate mixture. A 1 quart sample shall be provided with the mix design. The sample should include round aggregate incorporating all sizes required in the attached autumn beige mix design.
2.1.6 Form Release Agents
Form release agents shall be manufacturer's standard, non-staining, nonpetroleum based, compatible with surface sealer finish coating.
PART 3 EXECUTION
3.1 FORMWORK ERECTION
Erect formwork in accordance with the applicable drawings to ensure that the finished concrete members conform accurately to the indicated dimensions, lines, elevations, and finishes. Deflection shall not exceed 1/360th of each component span or distance between adjacent supports. Deflections and tolerance shall not be cumulative. Install form lines as necessary to provide the required finish. Forms shall be coated with form release agents before reinforcement is placed. Formwork shall conform to ACI 301M ACI 301 and ACI 347.
3.2 CONCRETE FINISHES
Finishes on the curved walls, retaining walls and pillars sides shall be Class A finish as referenced in ACI 347-04 Guide to Formwork for Concrete.
3.6 PROTECTION OF WORK
Work shall be protected against damage from subsequent operations.
3.7 DEFECTIVE WORK
Defective work shall be repaired or replaced, as directed, using approved procedures.
-- End of Section –-
Attachment 1
Mix Designs
REPORT OF CONCRETE MIX DESIGN
Mix: 4200# 3/4” roundrock W/AIR Application; DECORATIVE EXT CONC
DRM# 0032ROEX
Materials:
Cement LAFARGE Type 1 Portland ASTM: C150 Pozzolan ISG COAL CREEK MN ASTM C618 Type C/F Fine Aggregate Robertson Pit Sand ASTM: C33 Coarse Aggregate Robertson Pit Rock ASTM: C33 Water Reducer EUCLID mr ASTM: C494, Type A Air Entrainment EUCLID AEA 92 ASTM: C260
HIGH RANGE WATER REDUCER PLASTOL 5500 POLYCARBOXLATE TYPE F
Color scoffield AUTUMN beige group C
Design Specification:
Compressive Strength 4000 PSI Slump 5.5” Maximum Water Cement Ratio .47 Maximum Size Coarse Agg. 3/4“ Air Content 5 to 8%
Proportions:
Cement LB/YD 510 Pozzolan LB/YD 40 Fine Aggregate LB/YD 1240 Coarse Aggregate (#4-1/2) LB/YD Coarse Aggregate (3/4-#4) LB/YD 1920 Coarse Aggregate (3/4-1.5) LB/YD Water Reducer OZ/YD 22 Air Entrainment OZ/YD 4.0 ADJUST AS REQUIRED IN FIELD Water LB/YD 259 (31 GAL) Color pail/yard 1
W/C +P RATIO .45
Designed Slump 5.5
REPORT OF CONCRETE MIX DESIGN
Mix: 4200# 3/4” roundrock W/AIR Application; EXT CONC
DRM# 0032EX
Materials:
Cement LAFARGE Type 1 Portland ASTM: C150 Pozzolan ISG COAL CREEK MN ASTM C618 Type C/F Fine Aggregate Robertson Pit Sand ASTM: C33 Coarse Aggregate Robertson Pit Rock ASTM: C33 Water Reducer EUCLID mr ASTM: C494, Type A Air Entrainment EUCLID AEA 92 ASTM: C260
HIGH RANGE WATER REDUCER PLASTOL 5500 POLYCARBOXLATE TYPE F
Color scoffield winter beige group b
Design Specification:
Compressive Strength 4000 PSI Slump 5.5” Maximum Water Cement Ratio .46 Maximum Size Coarse Agg. 3/4“ Air Content 5 to 8%
Proportions:
Cement LB/YD 505 Pozzolan LB/YD 90 Fine Aggregate LB/YD 1290 Coarse Aggregate (#4-1/2) LB/YD Coarse Aggregate (3/4-#4) LB/YD 1798 Coarse Aggregate (3/4-1.5) LB/YD Water Reducer OZ/YD 26 Air Entrainment OZ/YD 4.0 ADJUST AS REQUIRED IN FIELD Water LB/YD 259 (32 GAL) Color pail/yard 1
W/C +P RATIO .45
Designed Slump 5.5
CHANGES TO THE PLANS
Sheet 1 of 5 Change Numbering to: Sheet 1 of 8
Sheet 2 of 5 Change Numbering to: Sheet 2 of 8
Sheet 3 of 5 Change Numbering to: Sheet 3 of 8
Sheet 4 of 5 Change Numbering to: Sheet 4 of 8
Sheet 5 of 5 Change Numbering to: Sheet 5 of 8
Add Sheet: 6 of 8 DULUTH AREA OFFICE FRONT STEPS
Add Sheet: 7 of 8 SIDEWALK CROSS SECTIONS
Add Sheet: 8 of 8 TAN SECTION DETAIL
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has increased by 10 days from 60 days to 70 days.
CLIN 0001
The CLIN description has changed from REPLACE VESSEL YARD to FY10 DULUTH VESSEL
YARD.
The CLIN extended description has changed from CONCRETE APPROX 11,000 SQUARE FEET to
CONCRETE REPLACEMENTFOR ACCOUNTING PURPOSES ONLY.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
SECTION 00700 - CONTRACT CLAUSES
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 calendar days after Notice to Proceed. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than seventy (70) days after the receipt of the notice to proceed for the base and seven
(7) additional calendar days from the notice of any exercised option. The times stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
TIME EXTENSION
52.236-4020 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 89)
(ER 415-1-15)
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather I accordance with the CONTRACT CLAUSE entitled “DEFAULT (FIXED-PRICE CONSTRUCTION).” In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied: (1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month. (2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor’s progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (7) DAY WORK WEEK FOR LAKE SUPERIOR
JAN FEB MAR APR MAY JUN
31 29 31 20 5 5
JUL AUG SEP OCT NOV DEC
5 5 6 8 30 31
c. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC Report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for fifty percent (50%) or more of the contractor’s scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather days exceeds the number of days anticipated in Subparagraph (b) above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the CONTRACT CLAUSE entitled
“DEFAULT (FIXED PRICE CONSTRUCTION)”.
(END OF CLAUSE)
(End of Summary of Changes)