Power Cable Supply SOW.docx
DOCX document 25 KB Posted
- Attached to
- Point Marion Power Cable
- Solicitation number
- W911WN25Q0801
About this file
This Statement of Work (SOW) outlines requirements for power feed cable supply to Point Marion Lock and Dam. The requirements include delivery of 400 feet each of 350 MCM THHN Stranded Copper Wire in brown, orange, yellow, and white colors, plus 450 feet of 3/0 awg THHN Stranded Copper Wire in green.
The contract specifies a 25-year warranty requirement and delivery within 60 days of award notice. Delivery is F.O.B. destination to Point Marion Lock and Dam in Dilliner, PA, with prepaid transportation charges. The cable must be properly packaged to prevent shipping damage, with vendor responsibility for repairs or replacements during transport. Technical questions can be directed to specified POCs Zach Ostrander or Mike Clark. The contract is being managed by the Department of the Army Corps of Engineers Engineering District Pittsburgh under solicitation number W911WN25Q0801.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification for Power Cable Supply
1.0 GENERAL REQUIREMENTS. These specifications establish the requirements to furnish new Power Feed Cable for Point Marion Lock and Dam.
1.1 Four hundred (400) feet of 350 MCM THHN Stranded Copper Wire in Brown, four hundred (400) feet of 350 MCM THHN Stranded Copper Wire in Orange, four hundred (400) feet of 350 MCM THHN Stranded Copper Wire in Yellow, four hundred (400) feet of 350 MCM THHN Stranded Copper Wire in White, and four hundred and fifty (450) feet of 3/0 awg THHN Stranded Copper Wire in Green will be delivered to the Point Marion Lock and Dam.
2.0 TECHNICAL QUESTIONS. Technical questions may be directed to Zach Ostrander at telephone 412-403-6087 or Mike Clark at telephone 724-725-5289 during normal business hours.
3.0 WARRANTY. The new power feed cable shall have a twenty-five (25) year Warranty.
4.0 DELIVERY. The new power feed cable shall be crated, boxed, or otherwise packaged to the extent necessary to prevent damage during shipment. All costs for repair and or replacement of damaged parts during transportation and delivery is the responsibility of the vendor.
4.1 Time of Delivery. The Government requires delivery of the new power feed cable within 60 days after the date of a written notice of contract award.
4.2 Place of Delivery. The power feed cable supplied under this contract as specified in section 1.1 shall be delivered F.O.B. destination, transportation charges prepaid, to the following location:
Mike Clark – Point Marion Lock and Dam 304 Powerplant Road Dilliner, PA 15327-9603 Telephone 724-725-5289