| File | Type | Posted |
|---|---|---|
| W911WN23Q3014 0004.pdf | ||
| W911WN23Q3014 0002.pdf | ||
| W911WN23Q3014 0002.pdf | ||
| W911WN23Q3014 0001.pdf | ||
| W911WN23Q3014.pdf | ||
| Attachment 1 Wage Determination No. 2015-4235, Rev 22, Washington and Allegheny County PA.pdf | ||
| Attachment 3 Wage Determination No. 2015-4349 , Rev 20, Monongalia County WV.pdf | ||
| Attachment 2 Wage Determination No. 2015-4247, Rev 20, Grenne County PA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET431531396
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: Scada System Upgrades:
The purpose of this Amendment is to answ er vendor questions and update Addendum to FAR 52.212-1.
See Summary of Changes for Details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN23Q3014
X 9B. DATED (SEE ITEM 11)
07-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2023
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN23Q3014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
INQUIRIES AND RESPONSES
#1 Bidder Inquiry: Solicitation Submittal Instructions refer to filling in FAR 52.212-3, paragraph b. Typically this is provided with the solicitation. We could not find the specified FAR. Please provide the FAR or indicate if we should instead fill out FAR 52.219-28 which is provided but worded differently than the original FAR.
Government Response: The solicitation includes FAR 52.212-3 Alt 1: Addendum to FAR 52.212-1 has been updated to reflect this.
#2 Bidder Inquiry: We believe the specifications may not address all manufacturer software required to complete this project. Please confirm that ALL software licenses for both development and runtime for the PLC’s, HMI’s, SCADA Computers, and Managed Ethernet switches will be provided by the Government directly as GFE, regardless of whether or not it has been addressed in the specification.
Government Response: GE iFix for Mon Remotes provide license software versions. Reaffirm compatibility.
Look at Rockwell Automation software HMI and PLC's for Stratix and Hirschman Ring Switches.
#3 Bidder Inquiry: The project duration of (1) month (July 17 through August 17, 2023) does not seem realistic considering the amount of software installation required and the amount of testing which must be performed with USACE personnel present. Will offers be considered and possibly awarded that take exception to the project duration or is the (1) month duration a mandatory bid criteria?
Government Response: The project duration remains as advertised.
#4 Bidder Inquiry: Has the USACE assigned new IP addresses such that old equipment addresses do not conflict during the transition? In other words, they have not re-used any existing addresses in the final configuration.
Government Response: No ip addreses are being reused. All ip addresses are new.
#5 Bidder Inquiry: Will the USACE’s system Ethernet switches be able to handle both new and old IP subnet addresses at the same time? For example, Point Marion remotely handles multiple locations, and all locations will not be transferred to the new IP addresses on the same day.
Government Response: Yes.
#6:
Bidder Inquiry: It may be necessary to perform network address translation or otherwise temporarily route network traffic to make remote operation possible while PLCs remain on 2 separate subnets across remote sites (e.g.
Point Marion to Hildebrand/Opekiska/Morgantown). Will USACE IT be available to make necessary network changes to support these efforts?
Government Response: LRP Personnel will be made available to support these efforts.
#7
Bidder Inquiry: Please confirm the contractor is to install new M1 CPUs with the old IP address and test the gate operation, then change the IP address and test gate operation again. The SOW states this redundant work. Considering the tight project schedule, this does not seem like an efficient method of installation and provides no apparent benefit.
Government Response: Yes.
#8 Bidder Inquiry: Emsworth PLCs are L61 CPUs can only go to Version 20, this is not WINDOWS10 compatible. How is USACE handling this?
Government Response: L61 PLCs will be able to be updated to Version 20 and run on windows 10.
#9 Bidder Inquiry: Since the model of Panelview HMI’s is not addressed in the specification, please confirm that they are ALL capable of being flashed to the latest version of FactoryTalk View Studio.
Government Response: Flash to the latest version compatible to the existing hardware.
#10 Bidder Inquiry: Due to time constraints, some work sites will not be possible to transition and test ALL gates to the new IP addresses during a single day. Will the USACE operate these gates manually during this transition, or does the contractor have additional responsibilities during this period?
Government Response: There will have to be USACE personnel avaialble to make local gate moves if needed.
#11 Bidder Inquiry: Please confirm that there is no hardware, manufacturer software licenses, PLC’s, HMI’s, computers, Ethernet/Fiber patch cables, temporary equipment, or other components being provided by the contractor. This contract is for LABOR only.
Government Response: This contract is for labor. Contract alterations, if applicable, will be incorporated by Contract Modification.
#12 Bidder Inquiry: The PLC’s being replaced are over 10 years old and possibly brittle. If a backplane or similar component falls apart or breaks during transition to the new CPU, please indicate whether the Government will provide the replacement component(s) or if that is the contractor responsibility.
Government Response: Alterations to the Contract, if applicable, will be incorporated by Contract Modification.
#13 Bidder Inquiry: Will GFE computers be furnished as new and replace existing equipment in the field, or does the Government intend to reuse any existing computers already in service?
Government Response: GFE is new, no reused pc's are introduced.
#14 Bidder Inquiry: GFE is new, no reused pc's are introduced.
Government Response: Yes, LRP will do.
#15 Bidder Inquiry: Will the Contractor be required to install new computer operating systems?
Government Response: No. LRP will do.
#16 Bidder Inquiry: Please clarify the language on page 23 regarding STIG implementation to address the following questions: “Notice: The Security Technical Implementation Guide (STIG) will be followed and implemented for review regarding all control systems within the contract. Based on Department of Defense (DoD) policy and security controls adhered to at no time can a computer or external device be connected to the internet to install software, configure, program, update or recover data from any computer, HMI panel or PLC indicated within this contract.”
a. Whose responsibility is it to implement STIGs and prepare documentation for review concerning each of the control systems in this contract?
b. Whose responsibility is it to review the documentation regarding STIG implementation?
c. Is Contractor responsible for implementing any STIG or preparing any documentation for review?
d. Will STIG implementation be required for all pieces of equipment and software composing the control systems in this contract, even if they are not otherwise modified as part of this contract?
e. What criteria will the reviewer use to determine whether STIG implementation is acceptable?
f. Is the reviewer’s acceptance of STIG implementation a contract requirement?
g. What does it mean for a computer to be “connected to the internet”? Are the existing computers that are remote controlled “connected to the internet”?
h. What is an “external device”, and what does it mean for an external device to be “connected to the internet”?
i. What means are acceptable for transferring information to and from equipment composing the control systems in this contract?
j. What will be done regarding control system components for which no STIG is published?
k. What will be done regarding control system components which cannot be configured to meet the requirements of relevant STIGs?
Government Response: a. LRP’s
b. LRP’s
c. LRP’s
d. LRP’s
e. LRP’s
f. No external internet connections allowed to control systems.
g. No computers have no internet capability, but are on line.
h. An external device such as a phone using Wi-Fi or other hot spot device.
i. CD or GFE portable external hard drive.
j. LRP will address with UCIC.
k. LRP will address with UCIC.
#17 Bidder Inquiry: Please clarify the language on page 22 regarding firmware and software: “… the Contractor shall update the firmware of each device that is assigned a new IP address. The firmware of each device shall be compatible with the latest version of software used in the system.”
a. Please confirm that the Government will choose software versions of GFE software, and that Contractor will choose compatible firmware versions.
b. Please confirm that, should no such firmware exist which would provide compatibility between outdated equipment and GFE software, the Government will furnish new compatible equipment or different compatible software.
c. Shall firmware other than the latest available be acceptable if its use is required for compatibility with GFE software?
Government Response: This is confirmed.
a. This is confirmed.
b. Alterations to the Contract, if applicable, will be incorporated by Contract Modification.
c. The firmware needs to be compatible with the software.
#18 Bidder Inquiry: Can we email you a completed SF1449 with an electronic signature by the due date/time? Or will will you require a "hard" copy, with an electronic signature?
Government Response: A completed SF1449 with electronic signature is acceptable.
#19 Bidder Inquiry: If our reps and certs are currently in SAM, will you require us to submit the associated reps/cert forms in the RFQ with our quote?
Government Response: No.
#20
Bidder Inquiry: How can we get a copy of SOW?
Government Response: The SOW is incorporated into the SF1449 and can be found on pages 20-26.
#21 Bidder Inquiry: Will we have access to the existing PLC and HMI programs before the installation dates? If so, will it be by July 17th?
Government Response: The contractor will have to gather this information.
#22 Bidder Inquiry: I see on the Point Marion Lock & Dam there is a discrepancy on page 22 of the solicitation on the HMI quantity. (See below)
Would you please clarify? Charleroi L/D – Five (5) PLCs and one (1) PC based HMI Maxwell L/D – Five (5) PLCs and one (1) PC based HMI Point Marion L/D – Six (6) PLCs and one (2) PC based HMIs Morgantown L/D – Six (6) PLCs and one (1) PC based HMI Hildebrand L/D – Six (6) PLCs and one (1) PC based HMI Opekiska L/D – Four (4) PLCs and one (1) PC based HMI Government Response: The count 7 is (Point Marion has 1 local and 1 remote control pc HMI).
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
Provision to fill-in and return with quote: FAR 52.212-3 Alt 1: If your System for Award Management (SAM) registration is current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation) as of the date of your offer, only paragraph (b) needs to be filled in;
otherwise complete the entire provision.
Questions: Contractual and Technical questions relating to the solicitation or procedures are to be submitted via email to: LRP.contracting@usace.army.mil and ‘cc’Mary Doherty at mary.k.doherty@usace.army.mil no later than 15 June 2023 at 10:00 a.m. Use the solicitation number as the SUBJECT: W911WN23Q3014 SCADA Systems. An amendment to the solicitation will be posted on SAM to answer all questions received in a timely manner.
FAR 52.217-8, Option to Extend Services is included in this solicitation and any resultant contract. The rates (as evaluated during the contract award process) to be used during the continued performance of any services will be the rates in effect at the time of the extension.
Quotes will be evaluated as follows:
Price evaluation: The government shall review acceptable offers by lowest price. Price reasonableness and fairness will be evaluated.
Award will be made to the lowest-priced, responsible* offeror, whose quote conforms to the requirement of the solicitation. [*Responsible means a contractor that meets the standards in FAR 9.104-1 – available at https://www.acquisition.gov/.] The government reserves the right to reject any quote determined to be unrealistically low for successful contract completion and that would not be in the best interest of the government.
Submittal Instructions: The entire solicitation need not be returned; only those pages on which you filled-in completed information need to be submitted.
SF 1449, page 1:
Block 12 – if you offer discount terms, enter them here; otherwise the government terms are Net 30 days.
Block 17a. Code – this is your CAGE Code (Facility Code is blank), Business Name, Address, Unique entity identification (previously DUNS); and phone number Block 30a, b and c must be completed Provision 52.212-3 Alt 1 as explained above If any amendment(s) is(are) issued [SF Form 30] it/(they) must be acknowledge(d) and submitted with your quote.
(End of Summary of Changes)