This amendment modifies a solicitation for repairs to the Somerfield North Recreation Area on Youghiogheny River Lake. The amendment extends the response deadline to June 4, 2021 and answers questions from offerors. Repairs include removing a soil-impacted asphalt parking lot and installing a new gravel lot and concrete pad near the boat ramp. Additional work involves excavation, drainage improvements, gate and guiderail installation, and site work. The estimated value is $250,000 to $500,000. The small business set-aside is for a firm-fixed price contract with the U.S. Army Corps of Engineers Pittsburgh District as the agency. The NAICS code is 237310 for highway and bridge construction, with a $39.5 million small business size standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Repairs to the Summerfield, North Recreation Area, Youghiogheny River Lake The purpose of this Amendment is to:
1) Extend the due date for Quotes to 4 June 2021 @ 1:00 p.m. ET.
2) Answ er questions arising from the Solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN21B8003
X 9B. DATED (SEE ITEM 11)
03-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jun-2021
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-CT
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN21B8003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 03-Jun-2021 01:00 PM to 04-Jun-2021 01:00 PM.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
QUESTIONS AND ANSWERS
Q1: “The excavation quantities of the separate locations as far as cut and fill. There is only 60 yards fill in the lower lot. I was under the impression that the blacktop removed from the upper was to be used as embankment in the lower lot. All the fill is in the upper lot is that including the topsoil quantity?”
A1: The 60 CY of Lower Lot Fill Quantity is the anticipated volume of fill placement in the Lower Lot, generated from excavations within the Lower Lot. This leaves an excess soil amount of cut in the Lower Lot, that will be used in the Upper Lot. This excess soil amount is anticipated to be 510 CY, reported in CLIN 0008.
The 670 CY of Upper Lot Fill Quantity, reported in CLIN 0010, is the anticipated volume of fill placement in the Upper Lot, generated from both excavations within the Upper Lot plus the 510 CY excess soil amount reported in
CLIN 008.
Q2: “From the preconstruction meeting, I thought that this mentioned it was a balance job and nothing would be brought in or taken out.not?”
A2: The site is near balanced, and no export of soil is anticipated. 390 CY of Topsoil, reported in CLIN 0011, is anticipated to be brought in for the Upper Lot conversion to grassy area.
Q3: “We also mentioned using the blacktop as fill in the lower lot. Are the cut and fill quantities for the two locations right they may be reversed? Is it maybe that the blacktop is not included in the excavation or fill quantities?”
A3: The assumption for the quantities is that blacktop will be disposed of off-site, and gravel will be imported for the fill material in the lower lot. The contractor is encouraged to submit an RFI for re-use of asphalt millings in the lower lot.
(End of Summary of Changes)