W911WN18B8009__Amendment_0001_-_New_Cumberland_Hydraulic_Replacement.pdf

PDF 214 KB Posted

Attached to
New Cumberland Hydraulic Replacement
Solicitation number
W911WN18B8009
Issued by

About this file

Amendment 0001

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET480381876

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Re: RIVER CHAMBER HYDRAULIC SYSTEM UPGRADE AT NEW CUMBERLAND LOCKS AND DAM, OHIO RIVER, JEFFERSON COUNTY, OHIO

The purpose of this Amendment is to:

1. Provide answ ers to questions asked in reponse to the Solicitation.

2. Incorporate revised Specification Sections 01 35 00.00 08 and 35 05 40.14 10 in response to questions asked.

3. Incorporate the current Wage Determination, OH180002, dated 08/17/2018, OH2, Heavy

See Summary of Changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN18B8009

X 9B. DATED (SEE ITEM 11)

01-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2018

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN18B8009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

QUESTIONS AND ANSWERS

Q 1: Can the floating plant be moored and stored in the auxiliary lock chamber?

A 1: Yes, the floating plan can be moored and stored in the auxiliary chamber or outside the auxiliary chamber below the downstream miter gates. Access to the auxiliary chamber is through the downstream miter gates only.

Q 2: What are the load restrictions on miter gate bridge, land, mid and river wall?

A 2: Operability of the locks is of primary concern and Government Lock personnel must be able to continue to operate the lock through the duration of the contract and will require access at times to the wall recesses covered by horizontal wall grating. It is not anticipated given the contract scope of work that equipment will be of a size or weight that will exceed the walls capacity when using appropriate cribbing or shoring as needed. A restriction of 100 psf for the construction load is indicated on 1.5.4 of Section 01 35 00.00 08 for the miter gates and this load restriction shall apply to the land, middle and river wall grating and plating.

Spec SECTION 01 35 00.00 08 para 1.6 requires submission for approval of a construction site plan, which shall show the location of equipment storage and access and haul routes. Larger construction loads may be acceptable pending the Government’s review. The equipment will be evaluated during the construction submittal process when actual equipment, rig sizes and locations are submitted based on the Contractors means and methods. Contractor equipment with equipment specifications and cut sheets anticipated to accomplish work that may be placed on the middle wall shall be submitted within the plan. Cribbing, shoring or other means provided by the Contractor may be required due to openings at top of wall, equipment, galleries, trenches, concrete strength limitations and other features of the walls. See amendment.

Q 3: What is the max truck length that can access the site with the restricted entrance width and road layout?

A 3: In previous contracts and deliveries to the site, a full size highway semi-truck has successfully accessed the site using a skilled driver. The contractor shall determine their specific delivery and equipment requirements using the existing access road conditions.

Q 4: What was the size of the crane used to set new bulk head crane on bridge?

A 4: We do not have this information available.

Q 5: What is the barge count per day each month?

A 5: The barge count per day each month is 10 on average.

Q 6: Are there any known conduit spares and of what size are available from Main Building to Cross over bottom?

A 6: There are four 4" conduits including one 4" spare, and one 4" fibre duct originally built into the lock. Each conduit has a varying amount of space available. A dewatering and inspection of the crossover late last year revealed the following:

1st conduit (fibre duct): two wires; 1 1/4" cable and 5/8" ground wire.

2nd conduit: four cables; two 7/8" cables and two 1 1/4" cables.

3rd conduit: four cables; three 1" inch cables and one 7/8" cable.

4th conduit: five cables; two 1 1/4" cables, one 1"cable, one 3/4" cable, and one 1/2" cable.

5th conduit (spare): four cables; four 1/2" cables

Q 7: SECTION 01 35 00.00 3.1 SEQUENCE OF WORK Paragraph 2 instructs the contractor to perform all civil works prior to installation of electrical and mechanical works. This would only make sense to apply to the electrical work and mechanical work within in the trench and pit. Please confirm that mechanical piping installation in the gallery and electrical works in the cross over and main building can occur prior to cleaning of the trench and pits. This would allow for winter works to occur and not be working on top of lock during inclement weather.

A 7: Yes, mechanical piping installation in the gallery and electrical works in the cross over and main building can occur prior to cleaning of the trench and pits. SECTION 01 35 00.00 3.1 SEQUENCE OF WORK Paragraph 2 specifically states "Civil site work to clean the trench and enlarge the pit recesses must be accomplished prior to the electrical and mechanical installation."

Q 8: Painting - Factory Finishes: Specification 35 05 40.14 10 clause 2.15 PAINTING states: "Shop prime and coat all exposed exterior surfaces of assemblies and equipment except stainless steel, synthetic rubber, and plastic, as specified unless the equipment is given a standard factory finish as allowed by other paragraphs of this specification." Can your office please provide additional guidance about acceptable standard factory finishes? For example, will the government accept the standard factory finishes provided by the manufacturers of the motors, proportional valves, reservoir isolators, hydraulic pumps, and other standard painted components?

A 8: Equipment shall be protected from corrosion and damage from environmental exposure. Factory finishes will be acceptable if they are rated for outdoor service. If the factory finish is not rated for outdoor service than an additional finish is required.

Q 9: Hydraulic Line Between Reservoir and Isolator: Specification 35 05 40.14 10 clause 2.2.19 Isolator Piping and Drawing M-6043 indicate that hose shall be used to connect each reservoir with its remote isolator.

Other drawings (including G-0040, M-4035, M-4037, and others) suggest that a combination of pipe and hose is desired. It is assumed that hard pipe, with hose at both ends, is intended. Can your office please confirm?

Is there a size or wall spec requirement for these low-pressure lines?

A 9: Yes, the intent is for hard pipe with hose at each end. The hose for the reservoir isolator shall be suitable for vacuum service and meet or exceed SAE J517 100R4.

Q 10: Hose Ratings: Specification 35 05 40.14 10 clause 2.5 HOSES and FITTINGS requires 5000 psi rated, six-spiral wire hoses. Does this requirement apply to hoses on return and reservoir isolator lines?

A 10: It applies to return hoses as well. Vacuum or suction lines shall meet or exceed SAE J517 100R4. See amendment.

Q 11: Shut-Off Valve Ratings: Specification 35 05 40.14 10 clause 2.8 SHUT-OFF VALVES requires 3000 psi rated (minimum) ball valves. Does this requirement apply to ball valves on return lines?

A 11: This requirement applies to return lines.

Q 12: Shop Test Oil Temperature: Specification 35 05 40.14 10 clause 2.13.1 Shop Tests of Hydraulic Power Units requires a hydraulic fluid temperature equal to or less than 70 degrees Fahrenheit. This requirement may be difficult (expensive) to meet. Depending on the location of the shop and the time of year of the tests, air/oil coolers may not be sufficient. In this case, water/oil coolers or chillers will be required to satisfy this test requirement. Can the government please confirm whether this requirement will be modified and if manufacturers should budget on the equipment/resources necessary to ensure test oil temps at or below 70 degrees?

A 12: This requirement will be removed from the specifications, see amendment.

Q 13: Portable Pump and Motor Unit Spec: Specification 35 05 40.14 10 clause 2.11 PORTABLE PUMP AND

MOTOR UNIT states that the pump and motor package should "match" the pump and motor on the HPU.

Does this mean that the motor on the portable unit should also be immersible rated?

A 13: The motor on the portable HPU shall match the other motors, therefore shall also be immersible rated.

Q 14: Pump Motor Enclosure: Specification 35 05 40.14 10 clauses 2.2.1 Motors and 2.13.3 Pump Motors require

"totally enclosed non-ventilated" (TENV) motor enclosures. Will immersible rated motors (as rated by the motor manufacturer) with other enclosure types be allowed? (TENV motors are large and expensive.)

A 14: Government research determined TENV to be the preferable motor enclosure due to the low operating time.

However, a motor with another enclosure type may be submitted for government approval if it is rated immersible and meets all of the other specification requirements.

Q 15: Drawing M-6044 shows a NEMA 6P junction box that houses the Ethernet Remote I/O Control System for the Hydraulic Power Units. The specification calls out Stainless Steel enclosures for the Control Desks but does not directly address this box. Does USACE want this skid mounted Junction Box in Stainless Steel or Fiberglass, which is more common?

A 15: A stainless steel junction box is required.

Q 16: Pump motors that meet all specification requirements simultaneously cannot be located. Although there are a couple of requirements that will be difficult, if not impossible, to satisfy simultaneously - the immersible requirement presents the greatest concern.

Immersible rated motors with TEBC (Totally Enclosed Blower Cooled) enclosures, not TENV enclosures, are available. According to Baldor, these motors (even those equipped with optional sealed blowers) are not meant to be used after flood events without proactive disassembly/ inspection /service. Although the manufacturer rates the motors for two weeks of submerged service, Baldor's product manager indicates that immersible duty motor bearings can experience water exposure upon motor submergence. Baldor advises that their immersible motors should be removed from service, disassembled, and inspected after every submersion event. It is assumed that post-flood motor disassembly/ inspection /service requirements will not be accepted by the government. Can this please be confirmed? [These ABB/Baldor employees can offer additional details:

Sean Fitzgerald, Sales representative, 203-269-1354 and Bob Perdue, Immersible Product Manager, bob.perdue@us.abb.com]

Submersible rated motors with TENV enclosures are available. These motors meet most (not all) of the specification's requirements - but are only available for vertical installation arrangements. The 40" maximum HPU height precludes a vertical pump/motor group orientation. Although, our search for an appropriate horizontal mount motor continues - this concern is mentioned now as we understand the project's Q&A period will soon end.

It appears that suppliers will not be able to avoid one or more exceptions to the specification's motor requirements. It is unclear how the government prioritizes the motor specification requirements. For example, if two requirements are mutually exclusive - which of the two will the government prefer? Will suppliers be deemed non-compliant if they guess wrong? It is also unclear how the government would like suppliers to proceed given the very real possibility that neither of the following will be found:

a. Immersible rated motors that do not require post-flood service b. Submersible rated motors appropriate for horizontal installations

Passion Engineering is working on a solution to the submersible motor orientation concern - but the outcome of our investigation/ design exploration is not yet certain. Given the upcoming closure of the Q&A period, we are sharing our concerns/thoughts now, before this design investigation is complete.

A 16: The specification identifies a TENV enclosure but a TEBC motor may be submitted for government approval if it is rated immersible and meets all of the other specification requirements. See amendment. Motors in lock and dam applications operate infrequently under intermittent duty cycles with low operating times.

Specification section 35 05 40.14 10 para 2.12.3.1 states that the motor must “operate intermittently for 15 minutes without exceeding the temperature rise permitted by the applicable NEMA standards for the class of insulation and frame construction used.” The government recognizes the recommended associated maintenance required after a flood event.

Q 17: Specification 35 05 40.14 10 clause 2.4 PIPE AND FITTINGS advises that non-welded piping solutions such as Parflange F37 or equivalent shall be submitted to the Contracting Officer for approval. We respectfully request your consideration and approval of Tube-Mac's Pyploc and 37 deg. Flare non-welded piping systems.

Applicable data sheets and references are attached for your review. Your approval of these systems will allow us to prepare a competitive proposal for an appropriate clean, non-welded piping system that complies with all applicable specifications requirements.

A 17: Tube-Mac’s 37 degree flare flange would be an equivalent alternative to the Parflange F37 and could be used.

Tube-Mac’s Pyplok would be an equivalent non-welded pipe solution where future disassembly of the pipe will not be required. As required by the specification, application of each non-welded piping solution shall be submitted to the Contracting Officer for final design approval.

Q 18: Specification 35 05 40.14 10 clause 2.11 PORTABLE PUMP AND MOTOR UNIT specifies a maximum allowable assembly weight of 1500 lbs. Although questions about the motor remain, preliminary design work suggests that this requirement, in combination with the clause's other requirements, may not be achievable.

(The motor and pump, alone, could weigh ~1100 lbs. This would leave only 400 lbs, perhaps less, for the pump adapter, coupling, cart assembly, 12" diameter wheels, hoses, and other peripherals.) Although our design work is preliminary, we believe that a weight limit of 2000 lbs can be satisfied with relative ease. We respectfully request adjustment of the weight limit or acceptance of a reduced power/flow unit.

A 18: The portable pump and motor unit design weight limit of 1500 lbs has been increased to 1800 lbs. See amendment.

Q 19: Many of the electrical components have a rating of IP 67 which is not designed to be submerged. Even some components with an IP68 rating would not technically be suitable to be submerged for two weeks. So if the idea is not that the electrical components will survive the immersion event, what is the plan for the electrical components on the HPU after the anticipated immersion event?

A 19: Electrical components that are not rated for submersion will be replaced after a flood event. Maintenance personnel will follow procedures to remove these components prior to the flood event if conditions allow.

Q 20: Which is the correct viscosity for this application.

a. 2.2.24 Return Filter Each hydraulic power unit shall be provided with a tank mounted, return line filter. The filter shall be sized so as to not incur more than a 35 psi pressure drop when filtering 75 gpm of 740 SSU oil at 50 degree F.

b. 2.2.23 Pressure Filter

Each hydraulic power unit shall be provided with a pressure filter mounted as shown on the drawings. The filter shall be sized so as to not incur more than a 70 psi pressure drop when filtering 75 gpm of 162 SSU oil at 50 degree F.

A 20: 740 SSU is the correct viscosity. See amendment.

Q 21: Can the Government please provide the reinforcing bar drawings for the portions of concrete that require demo?

A 21: No additional as-built reinforcing drawings in the identified demolition areas are available than were provided in the reference drawing set.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

ADDENDUM TO SECTION 00 73 00

00 73 00-1 WAGE RATES

Attachment 1 contains the schedule of wage rates applicable to all work under the contract:

General Decision No. OH180002 08/17/2018 OH2 Superseded General Decision Number OH20170002 State: Ohio Construction Types: Heavy Counties: Ohio Statewide https://www.wdol.gov/wdol/scafiles/davisbacon/OH2.dvb?v=20

00 73 00-2 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS

a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Line Item No. 0001, an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in

Line Item No. 0001 will cause the bid to be rejected as non-responsive.

b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Line Item No. 0001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Line Item No. 0001.

c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The Government will not reimburse any subcontractor's paid bond premiums.

00 73 00-3 REQUIRED INSURANCE

a. The Contractor shall procure and maintain during the entire period of his performance under this contract, the following minimum insurance. (See also the clause of the contract entitled "Insurance - Work on a Government Installation").

Type Amount Property Bodily Injury Damage

Comprehensive General Liability $500,000 Per Occurrence $100,000

Automobile Liability 200,000 Each Person --- 500,000 Per Occurrence 20,000

Workmen's Compensation and Employers Liability As Legally Required by the State (OH & WV)

b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.

c. Longshoreman and Harbor Worker's Insurance MAY be required for this work. Please consult with your insurance carrier and applicable statutes (33 USC 901, et. seq.).

00 73 00-5 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/pages/home.aspx.

The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00-6 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. (See also the clause of the contract 52.236-8 OTHER CONTRACTS).

00 73 00-7 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the clause entitled "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

9 6 6 5 5 4 4 4 3 3 4 7

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the clause entitled, "Default (Fixed-Price Construction)".

d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data obtained from the "Climatography of the United States No. 20". The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.

00 73 00-8 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION.

Those who disseminate information contained in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient: Business name and address, and name and telephone number of person receiving the information.

00 73 00-9 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

Submittals, including ENG 4025 transmittal form Meeting Minutes Construction Photographs Correspondence Requests for Information Payroll Documents Statement and Acknowledgement Forms (SF 1413) Request for Additional Classification (SF 1444) Progress Payment Requests and Supporting Documentation Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report, and

Certificate of Current Cost or Pricing Data Contractor Quality Control Reports (with attachments) Accident Reports Schedules and Schedule Updates Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

Advance Payment Bond Bid Bond including Annual Bid Bond Performance Bond including Annual Performance Bond Payment Bond Patent Infringement Bond Any performance security instruments Certificate of Insurance Novation/Change of Name Agreement Assignment of Claims Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings

Paper Payroll Documents Physical signatures on contracts and modifications o SF 1442 o SF 30

(End of Summary of Changes)