LOGISTICS MANAGEMENT OFFICE

US ARMY CORPS OF ENGINEER

1000 LIBERTY AVENUE ATTN: LOGISTICS

PITTSBURGH PA 15222-4186

TEL: FAX:

W81ET422499435

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W911WN-12-T-0037 17-Sep-2012 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

21-Sep-2012(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

412-395-7549DONNA YON

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W911WN-12-T-0037

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SPECIFICATIONS

EAST BRANCH LAKE

CONTROL TOWER REROOFING

MODIFIED BITUMEN MEMBRANE ROOFING SYSTEM

SPECIFICATIONS

1. GENERAL REQUIREMENTS

1.1 GENERAL

The work is located at East Branch Lake, 631 East Branch Dam Road, Wilcox, PA 15870-9748.

The site of the work may be reached from state and local roads and streets. The work includes the removal of existing membrane and built up roofing and the placement of new built up roofing at two roofs of the Dam control tower. The general description of the work is to furnish all equipment, labor, layout of work, supervision and materials necessary to complete the work as shown and as specified. The existing building roofs consist of EPDM membrane and board insulation over a previous built-up roof which still exists. The roof deck consists of tapered sawdust concrete fill over cast-in-place concrete. EPDM membrane is present on the inner sides of the parapets and extends up the sides of the parapets, back down the outside wall of the parapets, and is terminated using a metal sealing strip screwed to the parapet as shown on the reference drawings and pictures attached to these specifications. Work on the building roofs consists of removing existing EPDM membrane, insulation and built-up roofing and roof drains, and installing new mechanically fastened polyisocyanurate board insulation, roof drains, and modified bitumen roofing. The new roof membrane shall be extended up the inner side of the parapet and secured with mechanical fasteners as well as cold-applied adhesive. New flashing shall be installed on parapet walls and on all roof drains and protrusions from the roof surface.

Tapered insulation shall be used to provide a minimum roof slope of 1/4 inch per foot to the roof drains.

1.2 MEASUREMENT AND PAYMENT

Payment shall include all costs of labor, materials, supplies, equipment, supervision, cleanup, and other costs of completing the work as specified to remove the existing roofing materials and install the new roofing system.

Payment Item – REROOF CONTROL TOWER

1.3 SAFETY

All work shall be performed in accordance with the Corps of Engineers Safety Manual EM385- 1-1. Latest version includes updates 1 through 15 and is available online at http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx.

The contractor shall complete and submit the Accident Prevention Plan (separate attachment) included with this specification.

Safety Shoes – All employees engaged in construction operations shall wear safety shoes meeting the requirements of EM 385-1-1, Section 05.E.

Protective Eyewear – All workers on the site shall wear, as a minimum, protective eyewear meeting the requirements of EM 385-1-1, Section 05.A. Additional eye protection may be required in accordance with the requirements of EM 385-1-1, Section 05.B.

Hearing Protection – Hearing protection shall be provided for workers in accordance with EM 385-1-1, Section 05.C.

1.4 PROJECT SUBMITTALS

The contractor shall provide submittals for Government Approval. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications. It will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work.

1.4.1 CONSTRUCTION PROGRESS SCHEDULE

The Contractor shall submit a construction progress schedule consisting of a bar chart that will be used as a basis for measuring Contractor progress for payment purposes. The chart may be prepared in a format proposed by the Contractor and approved by the Contracting Officer. The chart shall be prepared in sufficient detail to clearly show the Contractor's planned progress and the relationship of the various items of work. The selection and number of activities shall be subject to the Contracting Officer's approval. The chart shall be updated monthly to show actual progress and percentage of work completed for each activity. The Contractor shall submit, as part of his monthly request for payment, updated copies of his progress schedule identifying the work completed during the reporting period. If the Government issues changes to the existing work or adds additional work items to the contract, the Contractor shall revise his progress schedule accordingly. If the Contractor's progress falls behind his planned work effort, a revised schedule shall be furnished to show how the Contractor proposes to complete the remaining work within the contract time. If the Contractor fails to submit updates as required, the Contracting Officer may withhold approval of partial payment estimates, until such submittals are made. This project must be completed by 31 July 2013.

1.5 COORDINATION MEETING AND POINTS OF CONTACT

Prior to commencement of any work being performed on site, the contractor shall participate in a teleconference with the Administrative Contacting Officer (ACO) and the Lake Resource Manager.

East Branch Lake Resource Manager – Mr. Mike Setlock, 814-965-2065 ACO – Mr. Kirk McWilliams 724-684-7462

1.6 VERIFICATION OF FIELD CONDITIONS

The Contractor shall verify all dimensions and conditions in the field and shall advise the Contracting Officer of any discrepancy before performing any work.

1.7 PROJECT/SITE CONDITIONS

1.7.1. WORK AREAS

It is noted that the work areas are on two of the roofs of the control tower. The Contractor shall be fully responsible for determining the methods used to transport materials and equipment to and from the roofs as well as the removal of waste materials from the roofs. The Contractor shall ensure that his operations will not interfere with the operation of the project or the duties of project personnel. Scaffolding, transport of materials and equipment shall be the responsibility of the Contractor.

1.7.2 TIME OF PERFORMANCE

The Contractor shall confine all operations at the work site between the hours of 7:30 AM and 4:00 PM, Monday through Friday, unless otherwise approved. Work will not be permitted on weekends or Federal holidays unless otherwise approved. Work shall be scheduled so that all work shall be completed in one construction season. For example, work will not be permitted to commence in the Fall, stop for the Winter then begin again the following Spring.

1.8 PROTECTION OF GOVERNMENT PROPERTY

The contractor shall protect all government property during the performance of this contract. All damage to existing government property as a result of the contractors work shall be repaired or replaced to the satisfaction of the Contracting Officer. Exposed roof and building interior shall be protected at all times. At areas where existing roofing materials have been removed, the contractor shall install and maintain temporary protection from the weather until permanent installation of roofing materials can be made. The Contractor shall coordinate roof demolition with the Contracting Officer. Work area shall be cleaned by the contractor after construction is complete. In no case shall materials be permitted to fall into the lake.

1.9 PROTECTION OF PERSONNEL

The Contractor shall insure that adequate measures are in place to protect workers, facility operation personnel and the public from injury due to the operations being performed. All protective measures shall be in accordance with EM 385-1-1.

1.10 IDENTIFICATION OF EMPLOYEES

The Contractor shall be responsible for furnishing an identification badge/card to each employee prior to the employee working on-site and for requiring each employee engaged on the work to display identification. Identification shall consist of name tags with the name of the Contractor and the employee's name. Additionally, a valid state driver's license or other Government-issued photo identification card is required for positive identification.

1.11 SECURITY REQUIREMENTS

This paragraph contains information for security requirements for work on Government Property. The purpose of these security requirements it to ensure that all Contractor or subcontractor employees working on this contract have received proper clearance for access to the Government property. Identification of Critical Infrastructure and submission of required employee information will be discussed at the Preconstruction Meeting. Required employee information shall be submitted to the Contracting Officer or Pittsburgh Office of Security and Law Enforcement, as applicable, at least 15 calendar days prior to required employee access to the project.

1.11.1 Contract for work on Government property, (No Access to Critical Infrastructure)

This paragraph applies to Government facilities not defined as Critical Infrastructure by USACE- Pittsburgh District.

All Contractor and subcontractor employees working on this contract who require access to non-critical infrastructures, as defined in the scope of this contract, on Pittsburgh District facilities (i.e. flood control dams, navigation locks, etc.), in areas that are available to the general public are required to have a favorable background check in accordance with "Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors" (HSPD-12).

The Contractor shall provide the information required by the attached E-Quip Information Needed for Contractors to the Contracting Officer for performance of the background check.

This background check shall be conducted by the local or state police agency where the employee resides at the Contractor's expense, through the local or state police agency where the employee resides. The results of these checks will be presented to the Administrative Contracting Officer (ACO), prior to the employee starting work on the contract. The ACO will make a determination of suitability based on the results of the checks. Any employee found not to be within the suitability standards will not be granted access to the project.

Employee information submitted to the Contracting Officer and results of investigations will be retained in a secure location until 90 calendar days after completion of the contract. The records will be destroyed at the end of this period.

Only those individual Contractor employees that were specifically identified and approved will be cleared to work on Government property. The Contractor shall report any change(s) in personnel prior to the individual(s) arriving on site. The Contractor shall follow the same requirements as listed above for any new employees who will require access to the site.

1.11.2 Background investigations are defined in two parts as described below:

Prior to any contractor employees accessing the work site, an initial background check (LEXUS/NEXUS) shall be completed. To accomplish this, the prime Contractor shall submit a complete list of employees who will be working on Government property (prime contractor employees and any subcontractor employees) to include Name, Social Security Number, Date of Birth and Place of Birth. This list shall be submitted to the Pittsburgh Office of Security & Law Enforcement who will conduct this initial criminal check based on the information provided. The Pittsburgh Office of Security & Law Enforcement will notify the Contracting Officer of the results within five working days of receiving the information. If no issues are found, approval to begin work will be provided in writing by the Contracting Officer or the Contracting Officer's Representative to the Contractor upon receipt of the results from the Pittsburgh Office of Security & Law Enforcement. At that time, Contractor employees receiving a favorable background check will be permitted access to the work site.

Employee information submitted to the Pittsburgh Office of Security and Law Enforcement and results of investigations will be retained in encrypted form and in a secure location until 90 calendar days after completion of the contract. The records will be destroyed at the end of this period.

1.11.3 Changes in Security Requirements

Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, US Army Force Protection Measures, regulation or policy changes, etc. Changes to any security requirements shall be added to the contract by modification.

The Pittsburgh District Office of Security & Law Enforcement may be contacted by phone or e-mail at the following number/address:

Steve Davidson; Phone 412-395-7504; e-mail stephen.davidson@usace.army.mil Paul Surace; Phone 412-395-7162; e-mail: paul.m.surace@usace.army.mil.

E-Quip Information Needed for Contractors

Information Needed for Contractors Full Name Date of Birth City of Birth Social Security Number Country of Birth

Are they a US Citizen E-mail Address Phone Number (Primary and Secondary Supervisor Full Name Supervisor E-mail Address Supervisor Phone Number Government POC Full Name Government POC E-mail Address Government POC Phone Number

Reference Drawings

Reference drawings show existing conditions to the best knowledge of the Government. Unless otherwise noted, dimension, elevations, and other features shown on contract drawings, are generally based on the reference drawings supplemented by field surveys. The Government cannot guarantee the accuracy of the dimensions, elevations, and features shown on reference drawings or on contract drawings which are based on the reference drawings, and it shall be the responsibility of the Contractor, whenever necessary, to verify all elevations and the dimensions by measurements in the field. All elevations are referenced to the local datum used for the original construction of the structure. The Contractor shall verify elevations and dimensions before laying out the work. The Contracting Officer shall be notified of any discrepancies prior to commencing work.

The following reference drawings are applicable to this work:

East Branch Dam Control Tower

Drawing No. Title

O38b-U1-40/7 Control Tower Elevations O38b-U1-40/19.4 Control Tower Sections O38b-U1-40/21.5 Control Tower Sectional Plans

INSPECTIONS AND ACCEPTANCE OF WORK

Notwithstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer or the ACO. The Contracting Officer or ACO shall be the individuals solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.

1.12 MODIFIED BITUMEN ROOFING SYSTEM DESCRIPTION

The new roofing system shall be a minimum two-ply SBS or APP modified bitumen roof membrane consisting of fiberglass felt venting base sheet and cap sheet. Modified bitumen roof membrane shall be either set in hot asphalt, torch applied or set in cold-applied adhesive.

1.13 WARRANTY

Manufacturer's standard warranty for the roofing system shall be provided for not less than 15 years from acceptance of the work. Warranty shall state that manufacturer shall repair or replace defective materials if the roofing system leaks or allows the insulation beneath the membrane to become wet during the period of the warranty. The contractor shall adhere to all the requirements of the roofing manufacturer for activating the guarantee

1.14 QUALIFICATION OF APPLICATOR

Roofing system applicator shall be approved, authorized, or licensed in writing by the modified bitumen sheet roofing system manufacturer and shall have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator shall supply the names, locations and client contact information of 5 projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.

1.15 TORCH SAFETY

Take all precautions necessary to prevent ignition of combustible materials during torch application of roofing. Flammable liquids shall not be stored on the roof. Provide two fully charged minimum 15 pound CO2 fire extinguishers in separate, easily accessible locations on the roof and within 30 feet of torch work area at all times. Seal off voids or openings in the substrate with non-combustible materials prior to installing torch-applied materials in the area.

When working around intakes and openings, temporarily disconnect and block to prevent flame of torch from being drawn into the opening. Provide non-combustible shielding or flame guard protection where gaps or voids occur in the construction in area of torch work.

1.15.1 Fire Watch

Provide a fire watch for a minimum of one hour after completion of all torch work at the end of each work shift. Maintain the fire watch for additional time required to ensure no potential ignition conditions exist. Utilize heat sensing meters to scan for hot spots in the work. Do not leave the rooftop unattended during breaks in work during a work shift. Walk and scan all areas of application checking for hot spots, fumes, or smoldering, especially at wall and curb areas, prior to departure at the end of each work shift. Ensure any and all suspect conditions are eliminated prior to leaving the site each work shift.

2. PRODUCTS

2.1 BITUMINOUS MATERIALS

Bituminous materials shall conform to the following requirements:

2.1.1 Asphalt Bitumen

ASTM D 312, Type III or IV, in accordance with modified bitumen membrane manufacturer requirements and compatible with the slope conditions of the installation.

2.1.2 Asphalt Roof Cement

ASTM D 4586, Type II for vertical surfaces, Type I for horizontal surfaces, compatible with the modified bitumen roof membrane and as recommended by the modified bitumen membrane manufacturer.

2.1.3 Asphalt Primer

ASTM D 41, or other primer compatible with the application and as approved in writing by the modified bitumen membrane manufacturer.

2.2 COLD-APPLIED MEMBRANE ADHESIVE

Adhesive for application of the membrane plies shall be as recommended by the membrane manufacturer and be compatible with all other roofing materials, including primer (if required) and cold tar pitch..

2.3 INSULATION

Insulation shall be compatible with the membrane, as recommended by the membrane manufacturer's printed instructions. Insulation shall be a standard product of the manufacturer and shall be factory marked with the manufacturer's name or trade mark Minimum thickness shall be as recommended by the manufacturer. Boards shall be marked individually. The insulation manufacturing process shall not include chlorofluoro carbons (CFC) or formaldehydes. Insulation and fiberboard shall conform to EPA requirements for recycled/recovered materials. Tapered insulation shall be installed to maintain constant slope to the roof drains. Minimum thickness of insulation shall be 2 inches. Where tapered insulation is specified, the finish slope of the roof shall be 1/4-inch per foot. Insulation shall be Polyisocyanurate meeting ASTM C 1289, Type I, or ASTM C 1289 Type II.

2.4 FASTENERS

Nails, screws and other fasteners shall be an approved type recommended by the manufacturer of the insulation, roofing felt or membrane and flashing or as otherwise compatible with the roofing system.

2.5 CANTS AND WOOD NAILERS

Treated wood cants and nailers shall be treated in accordance with AWPA C2 with waterborne preservatives intended for above ground use. Cants shall be made from treated wood or treated fiberboard and cut to reduce change in direction of the membrane to 45 degrees or less.

Fiberboard shall conform to ASTM C 208, treated with sizing, wax or bituminous impregnation.

When membrane or flashing is to be torch applied, cants shall be fire resistant. Edge nailers shall be of thickness to finish flush with the top surface of the insulation. Surface mounted nailers shall be the full thickness of the insulation.

2.6 FLASHING

Lead, lead-coated metal, and galvanized steel shall not be used. Materials shall match or be similar to the existing adjacent materials for compatibility. Accessories and other items essential to complete the sheet metal installation, though not specifically indicated or specified, shall be provided.

2.6.1 Aluminum Extrusions

ASTM B 221M ASTM B 221, Alloy 6063, Temper T5.

2.6.2 Sealant

Elastomeric sealants shall conform to ASTM C 920 and the following:

a. Polysulfide Sealant: Type S, Grade NS, Class 25, Use NT, A.

b. Polyurethane sealant: Grade NS, Class 25, Use NT, A.

c. Silicone sealant: Type S, Grade NS, Class 25, Use NT, A.

2.6.3 Polyvinyl Chloride (PVC) Reglets

ASTM D 1784, Class 14333D, 1.9 mm 0.075 inch minimum thickness.

2.6.4 Roof Drains

Roof drains shall conform to ASME A112.21.2M, with dome and integral flange, and shall have a device for making a watertight connection between roofing and flashing. Design shall be similar to the original. The Contractor shall ensure new roof drain is adequate and can be installed without demolition of the roof deck.

2.7 MODIFIED BITUMEN SHEET

Modified bitumen sheet shall be a bitumen modified by styrene butadiene styrene (SBS); or modified by SBS which has been further modified with styrene ethylene butadiene styrene

(SEBS). Sheets shall be uniform in thickness and appearance, and free from blisters or tape splices. Sheets shall not stick to the roll or stack, and shall be suitable for joining along the entire length by the procedure recommended by the manufacturer. Materials provided shall be suitable for the service and climatic conditions of the installation. Modified bitumen sheets shall be watertight and visually free of pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability.

a. Venting Base Sheet: ASTM D 4897, Type II, with perforations and as approved by the modified bitumen roof membrane manufacturer.

b. Fiberglass Felt Base Sheet: ASTM D 4601,ASTM D 1668 Type II, with perforations and as approved by the modified bitumen roof membrane manufacturer.

c. SBS Base Sheet: ASTM D 6162 or ASTM D 6164 or ASTM D 6163, Type II, Grade S, 80 mils thick.

d. SBS Cap Sheet: ASTM D 6162 or ASTM D 6164 or ASTM D 6163; Type II, Grade G, minimum 145 mils thick at selvage edge, and as required to provide specified fire safety rating.

2.7.1 Surfacing Material

Surfacing shall be factory applied granules requiring no further coating. The surfacing material shall be white.

3. EXECUTION

3.1 DEMOLITION AND DISPOSAL

All existing roofing materials shall be removed. All existing reglets, metal sealing strips , membrane s insulation, nailers and fasteners shall be removed and disposed of, without damaging the underlying concrete deck. All materials removed in the performance of this contract and not reused shall become the property of the contractor and be disposed of offsite in accordance with Federal, State and Local regulations. On-site burning will not be permitted, and materials will not be permitted to fall into the lake.

3.2 COORDINATION REQUIREMENTS

Insulation and roofing membrane shall be finished in one operation up to the line of termination at the end of each day's work. Phased construction will not be permitted.

3.3 ENVIRONMENTAL CONDITIONS

The temperature of the roofing materials shall be as required by the manufacturer. Air temperature shall be above 40 degrees F and there shall be no visible ice, frost, or moisture on the roof deck when the insulation and roofing are installed. Wind conditions shall be suitable for installation of insulation: Wind chill may affect the proper application temperatures of materials; hot materials may be blown about, creating safety dangers; insulation boards may become difficult and hazardous to handle; wrappers, coverings, and other debris may become airborne, and possibly contaminate laps and seams.

3.4 SUBSTRATE PREPARATION

The substrate preparation of any bay or section of the building shall be completed before insulation work is begun thereon. Existing roofing shall be completely. Roof drains and other items penetrating the roof shall be secured in position and properly prepared for flashing. Prior to application of insulation, substrate joints shall be covered with a 4 inch strip of roofing felt, embedded in and coated with asphalt cement. Substrate surface shall be smooth, clean, and dry at time of application.

3.5 HEATING OF ASPHALT

Asphalt shall not be heated higher than 105 degrees F above the EVT or 50 degrees F below the flash point, or 525 degrees F, whichever is lower. EVT and flash point temperatures of asphalt in the kettle shall be conspicuously posted on the kettle. Kettle shall be provided with automatic thermostatic controls and an accurate thermometer. Kettle operators shall be in attendance at all times during heating to ensure that the maximum temperature is not exceeded. Flame-heated equipment shall not be placed on the roof.

3.6 INSTALLATION OF WOOD NAILERS

Nailers shall be provided as necessary for the attachment of finish materials. Nailers shall be secured as recommended by the insulation or roofing manufacturer. Bolt anchors shall have nuts and washers countersunk, and bolts shall be cut flush with top of nailer. Powder-actuated fasteners, sized and spaced for nailer anchorage equivalent to that specified and indicated, may be used when approved.

3.7 APPLICATION OF INSULATION

Insulation shall be laid in two or more layers. Units of insulation shall be laid in courses parallel with the roof slope. End joints shall be staggered. Insulation shall be cut to fit neatly against adjoining surfaces. Joints between insulation boards shall not exceed /4 inch. Joints in successive layers shall be staggered with respect to joints of preceding layer. Insulation which can be readily lifted after installation is not considered to be adequately secured. Insulation shall be applied so that all roof insulation applied each day is waterproofed the same day. Phased construction will not be permitted. Application of impermeable faced insulation shall be performed without damage to the facing.

3.7.1 Foam Insulation

Polyisocyanurate foam insulation shall be isolated from modified bitumen membrane by a separate or composite layer of cellular glass, mineral fiber board, perlite board, glass mat gypsum roof board, or fiberboard.

3.7.2 Insulation Installation

Insulation layers shall be laid in solid moppings of hot asphalt applied at a rate of at least 20 pounds per square. Asphalt shall not be applied further than one panel length ahead of roof insulation being installed. Asphalt primer shall be applied at the rate of 1 gallon per square over the entire surface to be mopped when the insulation is applied over concrete deck.

3.7.3 Protection Requirements

The insulation shall be kept dry at all times. Insulation boards shall not be kicked into position.

Storing, walking, wheeling, or trucking directly on insulation or on roofed surfaces will not be permitted. Smooth, clean board or plank walkways, runways, and platforms shall be used, as necessary to distribute weight.

3.8 PROTECTION OF ALUMINUM

Aluminum surfaces shall not directly contact other metals except stainless steel, zinc, or zinc coating. Where aluminum contacts another metal, paint the dissimilar metal with a primer followed by two coats of aluminum paint. Where drainage from a dissimilar metal passes over aluminum, paint the dissimilar metal with a non-lead-pigmented paint.

3.9 CONNECTIONS AND JOINTING

3.9.1 Flashing Detail

A "Typical Parapet Flashing Detail is attached to the end of this Section of the Specifications, showing required arrangement of nailers, coping cover edge strip and counter flashing. Color of flashing shall be white.

3.9.2 Riveting

Joints in aluminum sheets 0.040 inch or less in thickness shall be mechanically made.

3.9.3 Seaming

Flat-lock seams shall finish not less than 1 inch wide. Plain-lap seams shall lap not less than 3 inches unless otherwise specified. Flat seams shall be made in the direction of the flow.

3.10 CLEATS

A continuous cleat shall be provided where required to secure loose edges of the sheet metalwork. Butt joints of cleats shall be spaced approximately 1/8 inch apart. The cleat shall be fastened to supporting concrete with screws and shall be driven in expansion shields set in concrete or masonry.

3.11 FLASHING FOR ROOF DRAINS

Set flashing on finished felts in a full bed of asphalt roof cement, ASTM D 2822. Extend roofing plies to edge of drain bowl opening at roof drain deck flange. Neatly fit and press primed roof drain flashing into heavy coat of asphalt roof cement applied to top of roofing plies.

Strip in and completely cover flashing with two layers of modified bitumen sheet, extending the first sheet 6 inches on the roofing beyond the edge of flashing. Extend the cap sheet 6 inches beyond the previous flashing ply. Bond the two layers to the metal flashing and to each other with hot asphalt. Securely clamp membrane, metal flashing, and strip flashing in the flashing clamping ring. Secure clamps so that strip flashing and metal flashing are free from wrinkles and folds. Trim membrane, flashing, and stripping flush with inside of clamping ring.

3.12 INSTALLATION OF ROOF DRAINS

Each roof shall have a new roof drain installed as specified by the manufacturer.

3.13 COPING COVER AND COUNTERFLASHING

Coping cover shall be fabricated of continuous sheet of aluminum generally formed as shown on the attached "Typical Parapet Flashing Detail" and attached to wood nailers. Edge of coping cover on the inside face of the parapet shall be formed to engage with counterflashing. Counter flashing shall be formed generally as shown and shall be attached to wood nailers at no more than 8-inches on center. Counterflashing shall engage with coping cover and shall overlap roofing felt over the cant strip by at least 2-inches. Edge of coping cover on the outside of the building wall shall be bent outward to form a drip edge and shall be fully engaged with the edge strip as shown, taking care to avoid the existing conduit. Edge strip shall be a continuous strip of the aluminum bent outward at an angle not more than 45 degrees to form a drip and shall overlap coping cover at least 3/4-inch. Nail hook strip to a wood nailer at 6 inches maximum on centers.

Where fastening is made to concrete, use screws spaced 12 inches on centers driven in expansion shields set in the concrete.

3.14 REGLETS

Reglets shall be a factory fabricated product of proven design, complete with fittings and special shapes as required. Open-type reglets shall be filled with fiberboard or other suitable separator to prevent crushing of the slot during installation. Reglet plugs shall be spaced not over 12 inches on centers and reglet grooves shall be filled with sealant. Friction or slot-type reglets shall have metal flashings inserted the full depth of slot and shall be lightly punched every 12 inches to crimp the reglet and counter flashing together. Polyvinyl chloride reglets shall be sealed with the manufacturer's recommended sealant.

3.15 PRIMING

Concrete, masonry and metal surfaces to receive bitumen shall be uniformly coated with primer at a rate of not less than1 gallon per square and allowed to dry. Primer shall be as recommended by the manufacturer and be compatible with all other roofing materials proposed.

3.16 APPLICATIONS OF BASE SHEET

Base sheet shall be applied, shingle fashion, in a continuous operation, with side laps in accordance with manufacturer's printed instructions. End laps shall be not less than 6 inches and staggered a minimum of 24 inches. Base sheets shall be applied at right angles to the slope and laps shall face down the slope. Venting base sheet shall be mechanically fastened in conformance with requirements of the manufacturer's printed instructions.

3.17 MODIFIED BITUMEN MEMBRANE APPLICATION

Ensure proper sheet alignment prior to installation. Bucking or backwater laps are prohibited.

Fully adhere membrane sheets to underlying substrate materials. Provide minimum 3 inch side laps and minimum 6 inch end laps and as otherwise required by membrane manufacturer.

Stagger end laps minimum 36 inches. Offset side laps between membrane layers a minimum of 12 inches. Offset end laps between membrane layers a minimum of 36 inches. All membrane layers shall be installed the same workday, unless supported otherwise by roof membrane manufacturer application instructions and approved by the Contracting Officer. Provide tight smooth laminations of each membrane layer without wrinkles, ridges, buckles, kinks, fishmouths, or voids. Ensure full membrane adhesion and full lap seals. Rework to seal any open laps prior to application of subsequent membrane layers. The completed membrane application shall be free of surface abrasions, air pockets, blisters, ridges, wrinkles, buckles, kinks, fishmouths, voids, or open seams.

3.18 HEATING OF ASPHALT

Break up solid asphalt on a surface free of dirt and debris. Heat asphalt in kettle designed to prevent contact of flame with surfaces in contact with the asphalt. Kettles shall have visible working thermometer and thermostatic controls set to the temperature limits specified herein.

Keep controls in working order and calibrated. Use immersion thermometer, accurate within a tolerance of plus or minus 2 degrees F, to check temperatures of the asphalt frequently. When temperatures exceed maximums specified, remove asphalt from the site. Do not permit cutting back, adulterating, or fluxing of asphalt.

3.18.1 Temperature Limitations for Asphalt

Heat and apply asphalt at the temperatures specified below unless specified otherwise by manufacturer's printed application instructions. Use thermometer to check temperature during heating and application. Have kettle attended constantly during heating process to ensure specified temperatures are maintained. Do not heat asphalt above its finished blowing temperature (FBT). Do not heat asphalt between 500 and 525 degrees F for longer than four consecutive hours. Do not heat asphalt to the flash point (FP). Apply asphalt and embed membrane sheets when temperature of asphalt is within plus or minus25 degrees F of the equiviscous temperature (EVT) but not less than 400 degrees F. Before heating and application of asphalt refer to the asphalt manufacturer's label or bill of lading for FP, FBT, and EVT of the asphalt used.

3.19 TERMINATIONS AT PERIMETERS

The modified bitumen membrane shall extend up abutting surface at least 4 inches or2 inches above the top of the cant.

3.20 MECHANICAL FASTENING OF MEMBRANE

Nails and fasteners for securing base or membrane sheet to wood nailers or deck shall be flush driven through flat metal disks of not less than 1 inch diameter. Metal disks may be omitted where heads of fasteners are equivalent in size to the 1 inch diameter disks. Screw fasteners with disks as specified by the membrane manufacturer shall be used on concrete deck. Nails and fasteners shall be spaced to meet the wind uplift requirement and within the tolerances specified by the manufacturer. Penetration of nails and fasteners will not be permitted through the exposed surface of membrane.

3.21 APPLICATION OF ROOFING MEMBRANE

Complete application of roofing in a continuous operation. Begin and apply only as much roofing in one day as can be completed that same day.

3.21.1 Hot Asphalt Application of Modified Bitumen Membrane

Apply membrane immediately following application of hot asphalt. Apply hot asphalt within 6 feet of roll. Do not work ahead with asphalt. Asphalt shall be completely fluid, with mop temperatures within the asphalt's EVT range, but not less than400 degrees F, at the instant membrane comes into contact with asphalt. Application of bitumen between layers shall be such as to provide full, continuous, uniform coverage and complete contact of hot asphalt with the sheet above and below. Embed sheets in asphalt. As sheets are being rolled into hot asphalt, immediately and thoroughly apply uniform positive pressure by squeegee, roll, or broom to ensure full adhesion and lap seal, eliminate trapped air and to provide tight, smooth laminations.

Avoid excessive extrusion of asphalt at lap areas. Control asphalt bleed out to approximately1 inch maximum.

3.21.2 Cold Adhesive Applied Modified Bitumen Membrane

Apply cold adhesive with airless sprayer or 1/4-inch saw-toothed rubber squeegee to prepared surfaces in accordance with membrane manufacturer's application instructions. Fully cover substrate with adhesive. Roll or lay membrane in adhesive in accordance with manufacturer's recommendations and within the time limitations of adhesive application. Broom the membrane to ensure full contact with adhesive. Seal laps with adhesive or by heat fusing with torch or hot air welder as required by membrane manufacturer. Minimize traffic on installed membrane during the adhesive cure and set time.

3.21.3 Cap Sheet Installation

Underlying applied membrane shall be inspected and repaired free of damage, holes, puncture, gouges, abrasions, and any other defects, and free of moisture, loose materials, debris, sediments, dust, and any other conditions required by the membrane manufacturer prior to cap sheet installation. Do not apply cap sheet if rain or frozen precipitation has occurred within the previous 24 hours. Align cap membrane and apply by the specified method with the proper side and end lap widths. Cap sheet may be set in hot asphalt or torch applied as recommended by the modified bitumen membrane manufacturer. Cut at a 45 degree angle across selvage edge of cap membrane to be overlapped in end lap areas prior to applying overlapping cap membrane.

Minimize traffic on newly installed cap sheet membrane.

3.21.4 Membrane Flashing

Apply two-ply modified bitumen strip flashing and sheet flashing in the angles formed where the roof deck abuts walls, curbs, ventilators, pipes, and other vertical surfaces, and where necessary to make the work watertight. Apply membrane flashing in accordance with the roof membrane manufacturers printed instructions and as specified. Cut at a 45 degree angle across terminating end lap area of cap membrane prior to applying adjacent overlapping cap membrane. Press flashing into place to ensure full adhesion and avoid bridging. Ensure full lap seal in all lap areas. Mechanically fasten top edge of modified bituminous base flashing 6 inches on center through minimum 1 inch diameter tin caps with fasteners of sufficient length to embed minimum one inch into attachment substrate. Apply matching granules in any areas of asphalt or adhesive bleed out while the asphalt is still hot or the adhesive is still tacky. Apply membrane liner over top of exposed nailers and blocking and to overlap top edge of base flashing installation at curbs, parapet walls, expansion joints and as otherwise indicated to serve as waterproof lining under sheet metal flashing components.

3.21.4.1 Membrane Strip Flashing

Set primed flanges of metal flashing's in full bed of modified bituminous cement material and securely fasten through to attachment substrate. Strip-in with membrane flashing so that strip extends not less than4 inches beyond outer edge of flange. Where multiple membrane stripping plies are installed, extend each additional stripping ply minimum 4 inches beyond edge of previous ply.

3.21.4.2 Membrane Flashing at Roof Drain

Extend membrane sheets to edge of drain bowl opening at the roof drain deck flange in accordance with membrane manufacturer's printed application instructions. Securely clamp membrane sheets and metal roof drain flashing and strip flashing in the flashing clamping ring.

Secure clamps so that sheets and metal flashing are free from wrinkles and folds. Trim stripping flush with inside of clamping ring.

3.22 PROTECTION OF APPLIED ROOFING

At end of day's work or whenever precipitation is imminent, the terminated edge of the roofing shall be sealed with two full width strips of roofing felt set in and coated with bituminous cement or hot mopped asphalt. One half-width of strips shall be extended up and over the finished roofing and the other half-width extended out and onto the bare roof deck or existing membrane.

Sealing strips shall be removed before continuing installation of roofing. To facilitate sealing, termination edges may be straightened with pieces of insulation board which shall be removed when work is resumed.

3.23 FLOOD TEST

After the membrane and its flashing's are installed, the drains shall be plugged, the other openings at the level of the roof be dammed, and the roof shall be flooded with water and left to sit for 24 hours. When water level falls, remove water, thoroughly dry, and inspect installation;

repair or replace roofing at drain to provide for a properly installed watertight flashing seal.

Repeat test until there is no water leakage.

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum East Branch Control Tower Roofing

FFP

See Schedule FOB: Destination

MILSTRIP: W81ET422499435

PURCHASE REQUEST NUMBER: W81ET422499435

NET AMT

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Sample Accident

Prevention Plan

Attachment 2 Photos of Roof 8 Attachment 3 Drawings 3 Attachment 4 DBWD PA 120002 14

Sep 2012

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO BIDDERS

BID SUBMITTAL

For evaluation purposes, the bidder shall submit for approval the manufacturer and model of all equipment to be furnished. All appropriate equipment features, controls systems and safety items to be supplied shall be dlearly indicated on the submittal.

SITE VISIT

If the bidder wants to inspect the site, contact Mr. Mike Setlock at (814)965-2065, between 08:00AM to 3:30 PM, Monday through Friday, holidays excluded, to schedule a visit.

CLAUSES INCORPORATED BY REFERENCE

52.236-27 Site Visit (Construction) FEB 1995

CLAUSES INCORPORATED BY FULL TEXT

52.214-4005 POINT OF CONTACT (February 2006)

Inquiries may be made by writing this office, or by calling (collect calls not accepted), the following individuals:

Donna Yon 412-395-7549 for Contracting Questions

Email: donna.yon@usace.army.mil

Requests for hardcopies of the specifications will not be honored by telephone. Vendors must register at https://www.fbo.gov/ and download the plans and specifications. This site is also used for obtaining bid results and award information.

52.236-4006 ESTIMATED COST OF THE WORK (May 2005)

The estimated cost of the proposed work is between between $25,000 and $100,000

52.236-4007 LOCATION AND DESCRIPTION OF WORK (May 2005)

Location. The work is located at East Branch Lake, 631 East Branch Dam Road, Wilcox, PA 15870-9748.

Description of Work. The work consists of the removal of existing membrane and built up roofing and the placement of new built up roofing at two roofs of the Dam control tower.

52.236-4008 ACCESS TO SITE (May 2005)

The site of the work may be reached from state highways and local roads and streets as indicated on the drawings.

Section 00600 - Representations & Certifications

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2012)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is [insert NAICS code].

(2) The small business size standard is [insert size standard].

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xvi)…