W911WN-10-T-0034-0001.pdf
PDF 21 KB Posted
- Solicitation number
- W911WN-10-T-0034
About this file
Amendment 0001 - W911WN-10-T-0034 Americans with Disabilities Act (ADA) compliant floating fishing dock
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN-10-T-0034.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET402006722
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: Americans w ith Disabilities Act (ADA) compliant f loating fishing dock.
This amendment is issued to revise the frame and decking portions of the specifications. See Summary of Changes; additions/changes are underlined.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-10-T-0034
X 9B. DATED (SEE ITEM 11)
28-Jul-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2010
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-10-T-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SPECIFICATIONS
Mosquito Creek Lake in Cortland, Ohio requires an Americans with Disabilities Act compliant floating dock. Installation will not be required, but all material and hardware necessary for erection and installation shall be furnished.
ADA Compliant Floating Fishing Dock: The general arrangement and configuration of the ADA Floating Fishing Dock shall be as shown on the attached sketch. The dock shall be of a T-shape, and shall consist of a floating ramp section designed for a minimum of 1,000 pounds flotation and a larger dock section designed for a minimum of 9,000 pounds flotation. The dock is intended for use by disabled anglers and will not be used by boaters or the mooring of boats.
Frame: The frame shall be constructed of welded steel construction, hot-dip galvanized after fabrication or of welded aluminum construction. All fasteners and hardware shall be galvanized steel.
Float Drums: Float drums shall be of UV-stabilized polyethylene, one-piece rotationally molded construction and filled with expanded polystyrene fill. Floats shall be resistant to oil gas and attack from marine and animal life.
Handrail: Removable ADA compliant steel pipe handrail of 2-inch diameter shall be furnished on perimeter of dock and ramp, and shall include a kick plate at the base of the handrail. Pipe sleeves for attachment and removal of handrail shall be furnished.
Decking: Decking shall be of pressure treated pine with galvanized or stainless steel deck screws or may be of polyethylene construction with ultraviolet inhibitors and non-slip surface.
Anchorage: Dock shall be designed to anchor onto two 2-inch pipe spuds located at the end of the ramp. Dock shall be furnished with suitable pipe sleeves to allow the ramp and dock to adjust to differing water levels. Pipe sleeves shall allow removal of pipe studs. Four pieces of 20-foot long galvanized steel pipe for use as anchorage spuds shall also be furnished.
Wheelchair Access: Ramp-to-dock cover plate and all hinges between dock sections shall be hinged with suitable piano-type hinge to allow smooth transport of wheel chair across joint.
After award, awardee shall contact Delivery POC below for delivery arrangements. Delivery shall be arranged at least 14 days in advance. Delivery shall be made within 60 days after receipt of order.
W911WN-10-T-0034
Operation and Maintenance Instructions: The successful bidder shall provide 2 copies of Installation Instructions, Operation Manual (if any), Service Manual (if any) and Parts List covering the operation and maintenance of all equipment.
Warranty: The manufacturer shall provide their standard industry warranty or not less than a one-year warranty against defective materials, design and workmanship for all equipment and parts.
Bid Submittal: For evaluation purposes, the bidder shall submit for approval the dock manufacturer and model to be supplied along with a complete listing of all components and description and sketches for proposed system.. All appropriate equipment, parts, and features shall be clearly indicated on the submittal.
Price shall include delivery to:
Mosquito Creek Lake 2961 Warren-Meadville Cortland, OH 44410-9321 POC Dianne Ruszkiewicz, Park Manager 330-637-1961
(End of Summary of Changes)
File details come from the government source that posted it. Updated .