BidResults for 10B0002.doc

DOC document 23 KB Posted

Attached to
RECOVERY--Z--REHABILITATE ELEVATED WATER TANK, MILL CREEK RECREATION AREA, BERLIN LAKE, OH
Solicitation number
W911WN10B0002
Issued by

About this file

Results of bid opening held on December 8 2009 at 11 00 am

View the file

Other files

File Type Posted
W911WN-10-B-0002-0002.pdf PDF
Berlin Water Tower Rehab Site Visit Attendence Register.doc DOC document
OH080002.pdf PDF
33 01 16 Am1.pdf PDF
W911WN-10-B-0002-0001.pdf PDF
OH080002.pdf PDF
W911WN-10-B-0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESULTS

W911WN-10-B-0002

ARRA – Rehabilitation of Elevated Water Tank, Mill Creek Recreation Area, Berlin Lake, OH Bid Opening: 08 Dec 2009 Contractor's Name & Address

Total Bid Amount

Maccabee Industrial, Inc.

$758,760.00 113 Water Street Belle Vernon, PA 15012

Fuel Tank Maintenance Co., LLC

$510,745.00 240 Mill Drive

Cookeville, TN 38501

TMI Coatings, Inc.

$406,500.00 3291 Terminal Drive

St. Paul, MN 55121

Preferred Tank & Tower Inc.

$337,750.00

5444 East Indiana Street – PMB 374

Evansville, IN 47715

Superior Industrial Maintenance

$391,383.00

Company, Inc.

4801 Stough Road

Concord, NC 28027

Central Painting & Sandblasting, Inc.

$412,500.00

8543 Riverland Ave., SW Navarre, OH 44662

Government Estimate w/o Profit

$266,200.00

File details come from the government source that posted it. Updated .