Amendment 01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 09B0020.doc | DOC document | |
| Roofing Reference Drawings.zip | ZIP file | |
| Northern Area Roofs Specs.pdf | ||
| W911WN-09-B-0020 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Re: MJ Kirw an, Shenango, Berlin, and Kinzua Re Roofing projects
This amendment is issued to incorporate the modified Wage Determinations OH080003, OH080001, PA080018, and PA 080002.
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 54
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Sep-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0020
X 9B. DATED (SEE ITEM 11)
14-Aug-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Sep-2009
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-09-B-0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
MODIFIED WAGE RATES
General Decision Number: OH080003 09/04/2009 OH3
Superseded General Decision Number: OH20070003
State: Ohio
Construction Type: Building
Counties: Columbiana, Mahoning and Trumbull Counties in Ohio.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 08/15/2008 8 09/05/2008 9 10/03/2008 10 11/07/2008 11 12/05/2008 12 01/02/2009 13 03/06/2009 14 03/20/2009 15 04/03/2009 16 05/01/2009 17 06/05/2009 18 07/03/2009 19 08/07/2009 20 09/04/2009
ASBE0084-003 07/01/2008
Rates Fringes
ASBESTOS WORKER/INSULATOR
(Includes application of all insulating materials, protective coverings coatings & finishings to all types of mechanical systems)..............$ 26.72 12.80
ASBE0207-011 07/01/2008
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 22.60 9.40
* BOIL0154-006 06/01/2009
COLUMBIANA
Rates Fringes
BOILERMAKER......................$ 36.70 20.82
BOIL0744-004 07/01/2009
MAHONING & TRUMBULL
Rates Fringes
BOILERMAKER......................$ 36.84 17.48
BROH0006-011 05/01/2009
COLUMBIANA (Knox, Butler, West & Hanover Townships)
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.65 10.48
BROH0008-002 06/01/2008
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton & Unity Townships and the city of New Waterford), MAHONING &
TRUMBULL
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 24.55 13.23
BROH0008-003 06/01/2008
COLUMBIANA (Center, Elk Run, Fairfield, Middleton, New Waterford, Perry, Salem & Unity Townships) & MAHONING
Marble Setter, Terrazzo Worker & Tile Setter.............$ 24.83 10.23
BROH0008-005 06/01/2008
COLUMBIANA, MAHONING (Excluding Smith Township) & TRUMBULL
Rates Fringes
Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher.............$ 22.17 10.23
BROH0010-005 07/01/2009
COLUMBIANA COUNTY (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships)
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; CEMENT
BLOCKLAYERS; MARBLE
SETTERS; POINTERS;
STONEMASONS & TERRAZZO
WORKERS.....................$ 24.70 12.91
TILE FINISHER....................$ 20.00 12.91
TILE SETTER......................$ 23.00 12.91
CARP0003-001 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.15
CARP0171-004 05/01/2009
COLUMBIANA
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.39
CARP1871-016 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
PILEDRIVERMAN....................$ 24.87 12.38
CARP1871-018 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
MILLWRIGHT.......................$ 24.87 12.38
CARP1871-021 05/01/2009
COLUMBIANA
Rates Fringes
MILLWRIGHT.......................$ 26.96 12.14
CARP2235-008 01/01/2009
COLUMBIANA
Rates Fringes
PILEDRIVERMAN....................$ 28.85 12.10
Welder &/or Creosote........$ 29.15 12.10
ELEC0064-002 12/01/2008
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships) & TRUMBULL (Hubbard & Liberty Townships)
ELECTRICIAN......................$ 29.10 12.12
ELEC0071-007 05/29/2006
Rates Fringes
Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34
ELEC0246-002 10/29/2007
COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity Townships)
ELECTRICIAN......................$ 31.00 18.29+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday
ELEC0540-004 06/01/2009
COLUMBIANA (Knox Township) & MAHONING (Smith Township)
Rates Fringes
ELECTRICIAN......................$ 27.44 16.20
ELEC0573-004 07/06/2009
MAHONING (Milton Township) & TRUMBULL (Except Liberty & Hubbard
ELECTRICIAN......................$ 29.15 13.16
ELEV0045-003 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 38.29 18.285+a&b
FOOTNOTES: a. Eight Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day;
Thanksgiving Day; Day after Thanksgiving; & Christmas Day
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years.
ENGI0066-023 06/01/2009
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 34.67 14.36
ASBESTOS; HAZARDOUS/TOXIC
GROUP 2 - A & B.............$ 34.34 14.36
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 3 - A & B.............$ 31.22 14.36
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 4 - A & B.............$ 27.61 14.36
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 - A & B.............$ 24.30 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 31.78 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 - C & D.............$ 31.48 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 - C & D.............$ 28.62 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 - C & D.............$ 25.31 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 - C & D.............$ 22.28 14.36
ALL OTHER WORK
GROUP 1.....................$ 28.89 14.36
ALL OTHER WORK
GROUP 2.....................$ 28.62 14.36
ALL OTHER WORK
GROUP 3.....................$ 26.02 14.36
ALL OTHER WORK
GROUP 4.....................$ 23.01 14.36
ALL OTHER WORK
GROUP 5.....................$ 20.25 14.36
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine;
Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Fork lift & Lulls; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
IRON0207-005 06/01/2009
COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224) & TRUMBULL
IRONWORKER
Layout; Sheeter.............$ 27.66 16.83 Ornamental; Reinforcing;
Structural..................$ 26.66 16.83
IRON0550-002 05/01/2009
COLUMBIANA (W. of a line from Damascus to Highlandtown) & MAHONING (S. of Old Rte #224)
Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.63 16.32
LABO0125-001 06/01/2009
MAHONING & TRUMBULL
Rates Fringes
LABORER
HAZARDOUS WASTE
Level A....................$ 23.76 7.45 Level B....................$ 23.63 7.45 Level C....................$ 23.50 7.45 Level D....................$ 23.37 7.45
ALL OTHER WORK
GROUP 1....................$ 23.07 7.45
GROUP 2....................$ 23.19 7.45
GROUP 3....................$ 23.31 7.45
GROUP 4....................$ 23.38 7.45
GROUP 5....................$ 23.57 7.45
LABORER CLASSIFICATIONS
GROUP 1: Building & Construction Laborer; Asphalt Paving;
Railroad Labor Construction; Carpenter Tender; Asbestos Removal
GROUP 2: Mortar Mixer (Hand or Machine); Mason Tender;
Jackhammer Operator; All Machine Driven Tools (Electric, gas or air) & operation of all Pumps Under 4"; Spiker; All Laborers Working in Concrete Such as Pouring, Puddling, Raking & Conveying; All Scaffold Help; Scrap Iron Burning
GROUP 3: Hod Carrier; Rough Terrain Forklift Driver when tending Masons; Work Done by Laborers 7' or more in Depth
GROUP 4: Laborer (Except Jackhammer) Working on Repair of Blast Furnace or Coke Plant & Auxiliary Facilities;
Jackhammer Operator in Trench or Shaft 7' or more in depth;
Concrete Buster; Pipelayer; Powder & Dynamite; Jackhammer on Blast Furnace or Coke Plant & Auxiliary Facilities
GROUP 5: Wrench Laborer; Miner - Air Tool; Guniting & Sandblasting; Pumpcrete Operations; Build Up Rates - Blast Furnace; Ram Tight; Bellman & Hook-up Man; Lancing Blast Furnace
LABO0809-003 07/01/2009
COLUMBIANA
Rates Fringes
LABORER..........................$ 21.82 8.45
Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour
Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay
PAIN0476-002 06/01/2008
Rates Fringes
PAINTER
GROUP 1.....................$ 22.95 9.40
GROUP 2.....................$ 23.15 9.40
GROUP 3.....................$ 23.16 9.40
GROUP 4.....................$ 23.20 9.40
GROUP 5.....................$ 23.45 9.40
GROUP 6.....................$ 23.60 9.40
GROUP 7.....................$ 23.85 9.40
PAINTER CLASSIFICATIONS
GROUP 1: Brush; Roller
GROUP 2: Drywall - Hand Finisher
GROUP 3: Structural Steel
GROUP 4: Wallpaper Hanger - Furnishing Own Tools
GROUP 5: Spray, Except Bar Joist/Deck
GROUP 6: Drywall - Mechanical Tools; Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 feet; Swingstages
GROUP 7: Sandblasting
PAIN0639-001 05/01/2003
Rates Fringes
Sign Painter & Erector...........$ 17.57 4.55+a+b+c
FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day;
July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day
b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation
c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral
PAIN0847-002 06/01/2009
Rates Fringes
GLAZIER..........................$ 25.16 11.54
PLAS0179-001 06/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.11 12.15
PLAS0179-002 06/01/2009
Rates Fringes
PLASTERER........................$ 26.45 11.46
PLUM0396-002 06/01/2009
COLUMBIANA (Excluding Washington & Yellow Creek Townships & Liverpool Township, Secs. 35 & 36, West of County Road #427), PLUMBER/PIPEFITTER...............$ 27.16 14.81
PLUM0495-003 06/01/2009
COLUMBIANA COUNTY (Washington & Yellow Creek Townships and Liverpool Township - Sections #35 & #36 - west of County Road #427)
Plumber, Pipefitter, Steamfitter......................$ 30.73 15.98
ROOF0071-004 06/01/2007
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 21.36 11.82
SFOH0669-003 04/01/2009
Rates Fringes
SPRINKLER FITTER.................$ 32.70 15.80
SHEE0033-007 06/01/2009
Rates Fringes
Sheet metal worker...............$ 27.66 14.85
TEAM0092-004 07/01/2008
COLUMBIANA COUNTY
Rates Fringes
Truck drivers:
GROUP 1.....................$ 21.39 9.87
GROUP 2.....................$ 21.43 9.87
GROUP 3.....................$ 21.47 9.87
GROUP 4.....................$ 22.17 9.87
GROUP 5.....................$ 22.29 9.87
CLASSIFICATIONS
GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;
Athry Wagon; Greaser; Tiremen; Articulated Dump
GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer
GROUP 3 - Tank Trucks (straight & semi)
GROUP 4 - Mechanic
GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;
Distributor Truck (front & back end) & Truck Crane
TEAM0377-004 06/01/2009
MAHONING & TRUMBULL COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 22.42 11.51
GROUP 2.....................$ 22.99 11.51
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Dump; Water; Stake Body; Batch; Flat Bottom; Pick Up; Tandem
GROUP 2 - Semi; Semi Water; Mixer; Fuel; Distributor; Carry All; Euclid Wagon; DW 10 Caterpillar (Equivalent); Tractor Trailer (Low Boy); Tri-axel
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: OH080003 09/04/2009 OH3
Superseded General Decision Number: OH20070003
State: Ohio
Counties: Columbiana, Mahoning and Trumbull Counties in Ohio.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 08/15/2008 8 09/05/2008 9 10/03/2008 10 11/07/2008 11 12/05/2008 12 01/02/2009 13 03/06/2009 14 03/20/2009 15 04/03/2009 16 05/01/2009 17 06/05/2009 18 07/03/2009 19 08/07/2009 20 09/04/2009
ASBE0084-003 07/01/2008
Rates Fringes
ASBESTOS WORKER/INSULATOR
(Includes application of all insulating materials, protective coverings coatings & finishings to all types of mechanical systems)..............$ 26.72 12.80
ASBE0207-011 07/01/2008
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 22.60 9.40
* BOIL0154-006 06/01/2009
COLUMBIANA
Rates Fringes
BOILERMAKER......................$ 36.70 20.82
BOIL0744-004 07/01/2009
MAHONING & TRUMBULL
Rates Fringes
BOILERMAKER......................$ 36.84 17.48
BROH0006-011 05/01/2009
COLUMBIANA (Knox, Butler, West & Hanover Townships)
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.65 10.48
BROH0008-002 06/01/2008
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton & Unity Townships and the city of New Waterford), MAHONING &
TRUMBULL
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 24.55 13.23
BROH0008-003 06/01/2008
COLUMBIANA (Center, Elk Run, Fairfield, Middleton, New Waterford, Perry, Salem & Unity Townships) & MAHONING
Marble Setter, Terrazzo Worker & Tile Setter.............$ 24.83 10.23
BROH0008-005 06/01/2008
COLUMBIANA, MAHONING (Excluding Smith Township) & TRUMBULL
Rates Fringes
Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher.............$ 22.17 10.23
BROH0010-005 07/01/2009
COLUMBIANA COUNTY (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships)
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; CEMENT
BLOCKLAYERS; MARBLE
SETTERS; POINTERS;
STONEMASONS & TERRAZZO
WORKERS.....................$ 24.70 12.91
TILE FINISHER....................$ 20.00 12.91
TILE SETTER......................$ 23.00 12.91
CARP0003-001 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.15
CARP0171-004 05/01/2009
COLUMBIANA
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.39
CARP1871-016 05/01/2009
PILEDRIVERMAN....................$ 24.87 12.38
CARP1871-018 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
MILLWRIGHT.......................$ 24.87 12.38
CARP1871-021 05/01/2009
COLUMBIANA
Rates Fringes
MILLWRIGHT.......................$ 26.96 12.14
CARP2235-008 01/01/2009
COLUMBIANA
Rates Fringes
PILEDRIVERMAN....................$ 28.85 12.10
Welder &/or Creosote........$ 29.15 12.10
ELEC0064-002 12/01/2008
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships) & TRUMBULL (Hubbard & Liberty Townships)
ELECTRICIAN......................$ 29.10 12.12
ELEC0071-007 05/29/2006
Rates Fringes
Line Construction Equipment Operator..........$ 25.47 9.78 Groundman...................$ 18.40 8.38 Lineman.....................$ 28.30 10.34
ELEC0246-002 10/29/2007
COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity
ELECTRICIAN......................$ 31.00 18.29+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday
ELEC0540-004 06/01/2009
COLUMBIANA (Knox Township) & MAHONING (Smith Township)
Rates Fringes
ELECTRICIAN......................$ 27.44 16.20
ELEC0573-004 07/06/2009
MAHONING (Milton Township) & TRUMBULL (Except Liberty & Hubbard
ELECTRICIAN......................$ 29.15 13.16
ELEV0045-003 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 38.29 18.285+a&b
FOOTNOTES: a. Eight Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day;
Thanksgiving Day; Day after Thanksgiving; & Christmas Day
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years.
ENGI0066-023 06/01/2009
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 34.67 14.36
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 2 - A & B.............$ 34.34 14.36
GROUP 3 - A & B.............$ 31.22 14.36
WASTE PROJECTS
GROUP 4 - A & B.............$ 27.61 14.36
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 - A & B.............$ 24.30 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 31.78 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 - C & D.............$ 31.48 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 - C & D.............$ 28.62 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 - C & D.............$ 25.31 14.36
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 - C & D.............$ 22.28 14.36
ALL OTHER WORK
GROUP 1.....................$ 28.89 14.36
ALL OTHER WORK
GROUP 2.....................$ 28.62 14.36
ALL OTHER WORK
GROUP 3.....................$ 26.02 14.36
ALL OTHER WORK
GROUP 4.....................$ 23.01 14.36
ALL OTHER WORK
GROUP 5.....................$ 20.25 14.36
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine;
Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Fork lift & Lulls; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine
Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
IRON0207-005 06/01/2009
COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224) & TRUMBULL
IRONWORKER
Layout; Sheeter.............$ 27.66 16.83 Ornamental; Reinforcing;
Structural..................$ 26.66 16.83
IRON0550-002 05/01/2009
COLUMBIANA (W. of a line from Damascus to Highlandtown) & MAHONING (S. of Old Rte #224)
Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.63 16.32
LABO0125-001 06/01/2009
MAHONING & TRUMBULL
Rates Fringes
LABORER
HAZARDOUS WASTE
Level A....................$ 23.76 7.45 Level B....................$ 23.63 7.45 Level C....................$ 23.50 7.45 Level D....................$ 23.37 7.45
ALL OTHER WORK
GROUP 1....................$ 23.07 7.45
GROUP 2....................$ 23.19 7.45
GROUP 3....................$ 23.31 7.45
GROUP 4....................$ 23.38 7.45
GROUP 5....................$ 23.57 7.45
LABORER CLASSIFICATIONS
GROUP 1: Building & Construction Laborer; Asphalt Paving;
Railroad Labor Construction; Carpenter Tender; Asbestos Removal
GROUP 2: Mortar Mixer (Hand or Machine); Mason Tender;
Jackhammer Operator; All Machine Driven Tools (Electric, gas or air) & operation of all Pumps Under 4"; Spiker; All Laborers Working in Concrete Such as Pouring, Puddling, Raking & Conveying; All Scaffold Help; Scrap Iron Burning
GROUP 3: Hod Carrier; Rough Terrain Forklift Driver when tending Masons; Work Done by Laborers 7' or more in Depth
GROUP 4: Laborer (Except Jackhammer) Working on Repair of Blast Furnace or Coke Plant & Auxiliary Facilities;
Jackhammer Operator in Trench or Shaft 7' or more in depth;
Concrete Buster; Pipelayer; Powder & Dynamite; Jackhammer on Blast Furnace or Coke Plant & Auxiliary Facilities
GROUP 5: Wrench Laborer; Miner - Air Tool; Guniting & Sandblasting; Pumpcrete Operations; Build Up Rates - Blast Furnace; Ram Tight; Bellman & Hook-up Man; Lancing Blast Furnace
LABO0809-003 07/01/2009
COLUMBIANA
Rates Fringes
LABORER..........................$ 21.82 8.45
Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour
Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay
PAIN0476-002 06/01/2008
Rates Fringes
PAINTER
GROUP 1.....................$ 22.95 9.40
GROUP 2.....................$ 23.15 9.40
GROUP 3.....................$ 23.16 9.40
GROUP 4.....................$ 23.20 9.40
GROUP 5.....................$ 23.45 9.40
GROUP 6.....................$ 23.60 9.40
GROUP 7.....................$ 23.85 9.40
PAINTER CLASSIFICATIONS
GROUP 1: Brush; Roller
GROUP 2: Drywall - Hand Finisher
GROUP 3: Structural Steel
GROUP 4: Wallpaper Hanger - Furnishing Own Tools
GROUP 5: Spray, Except Bar Joist/Deck
GROUP 6: Drywall - Mechanical Tools; Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 feet; Swingstages
GROUP 7: Sandblasting
PAIN0639-001 05/01/2003
Rates Fringes
Sign Painter & Erector...........$ 17.57 4.55+a+b+c
FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day;
July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day
b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation
c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral
PAIN0847-002 06/01/2009
Rates Fringes
GLAZIER..........................$ 25.16 11.54
PLAS0179-001 06/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.11 12.15
PLAS0179-002 06/01/2009
Rates Fringes
PLASTERER........................$ 26.45 11.46
PLUM0396-002 06/01/2009
COLUMBIANA (Excluding Washington & Yellow Creek Townships & Liverpool Township, Secs. 35 & 36, West of County Road #427), PLUMBER/PIPEFITTER...............$ 27.16 14.81
PLUM0495-003 06/01/2009
COLUMBIANA COUNTY (Washington & Yellow Creek Townships and Liverpool Township - Sections #35 & #36 - west of County Road #427)
Plumber, Pipefitter, Steamfitter......................$ 30.73 15.98
ROOF0071-004 06/01/2007
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 21.36 11.82
SFOH0669-003 04/01/2009
Rates Fringes
SPRINKLER FITTER.................$ 32.70 15.80
SHEE0033-007 06/01/2009
Rates Fringes
Sheet metal worker...............$ 27.66 14.85
TEAM0092-004 07/01/2008
COLUMBIANA COUNTY
Rates Fringes
Truck drivers:
GROUP 1.....................$ 21.39 9.87
GROUP 2.....................$ 21.43 9.87
GROUP 3.....................$ 21.47 9.87
GROUP 4.....................$ 22.17 9.87
GROUP 5.....................$ 22.29 9.87
CLASSIFICATIONS
GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;
Athry Wagon; Greaser; Tiremen; Articulated Dump
GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer
GROUP 3 - Tank Trucks (straight & semi)
GROUP 4 - Mechanic
GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;
Distributor Truck (front & back end) & Truck Crane
TEAM0377-004 06/01/2009
MAHONING & TRUMBULL COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 22.42 11.51
GROUP 2.....................$ 22.99 11.51
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Dump; Water; Stake Body; Batch; Flat Bottom; Pick Up; Tandem
GROUP 2 - Semi; Semi Water; Mixer; Fuel; Distributor; Carry All; Euclid Wagon; DW 10 Caterpillar (Equivalent); Tractor Trailer (Low Boy); Tri-axel
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
General Decision Number: PA080018 08/28/2009 PA18
Superseded General Decision Number: PA20070018
State: Pennsylvania
Counties: Lawrence and Mercer Counties in Pennsylvania.
BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include single family homes or apartments up to and including 4 stories), Excluding Sewage and Water Treatment Plant Projects.
1 02/22/2008 2 03/07/2008 3 04/11/2008 4 06/20/2008 5 06/27/2008 6 07/04/2008 7 07/18/2008 8 08/08/2008 9 09/19/2008 10 11/07/2008 11 11/21/2008 12 12/05/2008 13 12/19/2008 14 01/02/2009 15 02/27/2009 16 03/06/2009 17 04/03/2009 18 04/24/2009 19 05/01/2009 20 06/05/2009 21 06/26/2009 22 07/03/2009 23 07/17/2009 24 08/28/2009
ASBE0002-002 08/01/2008
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 29.53 17.76
ASBE0002-004 08/01/2008
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems)....$ 29.53 17.76
* BOIL0154-001 06/01/2009
Rates Fringes
BOILERMAKER......................$ 36.70 20.82
BRPA0009-014 12/01/2008
Rates Fringes
Bricklayer, Stonemason...........$ 25.95 13.48
CARP0268-001 06/01/2008
MERCER COUNTY
Rates Fringes
MILLWRIGHT.......................$ 32.71 14.23
CARP0268-003 06/01/2009
Rates Fringes
CARPENTER........................$ 26.84 11.00
CARP1759-002 06/01/2009
Rates Fringes
FLOOR LAYER: CARPET (SOFT)
FLOOR............................$ 27.82 11.03
CARP2235-002 06/01/2008
LAWRENCE COUNTY
Rates Fringes
MILLWRIGHT.......................$ 32.71 14.29
CARP2235-007 01/01/2009
PILEDRIVERMAN....................$ 28.85 12.10
ELEC0712-002 03/02/2009
Rates Fringes
ELECTRICIAN......................$ 29.20 17.48
ELEC1319-003 08/31/2008
Rates Fringes
Line Construction:
Groundman...................$ 24.53 17.13 Heavy equipment operator....$ 39.17 17.13 Lineman.....................$ 39.57 17.13 Truck operator..............$ 25.72 17.13
ELEV0006-001 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 38.65 18.285+A&B
FOOTNOTE: A. Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
* ENGI0066-013 12/01/2008
Rates Fringes
Power equipment operators:
CLASS 1.....................$ 27.765 14.13
CLASS 2.....................$ 24.83 14.13
CLASS 3.....................$ 23.11 14.13
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
CLASS I
Asphalt Paver, Asphalt Roller, Asphalt Plant Operator, Athey Loader, Auger (Truck or Tractor Mounted), Auto Grader (C.M.I. and similar), Backhoe (180� and 360� swing), Back-Filling Machine, Batch Plant, Bulldozer, Cable Layer, Cableway, Caisson Drill, Central Mix Plant, Compactor with Blade, Concrete Pump (all types), Over-Head Crane, Crane (Crawler or Truck Mounted)*, Tower Crane (Stationary or Climbing Type), Rough Terrain Crane**, Wagon Crane, Crushing and/or Screening Plant, Derrick Traveler, Derrick
(all types)(when assistance is needed it will be an oiler or apprentice), Derrick Boats, Dragline, Drill (Davey or similar), Dredge, Drill (Well and Core)(Truck or Skid Mounted), Elevator, Excavating Equipment (all other), Fork Lift (Lull or similar), Franki Pile Machine (or similar), Guard Post Driver, Gradall (all types), Grader, Elevating Grader, Equipment Greaser, Helicopter, Helicopter Hoist Operators, Front End Loader, Hoist, Hydraulic Boom Truck, Jumbo Operator, Kocal, Koehring Scooper, Locomotive, Metro Chip Harvester (or similar), Mix Mobile, Mixer - Paver, Mucking Machine, Multiple Bowl Machines, Pile Driver (Sonic or similar), Scrapers, Shovels (powered), Slip Form Paver (C.M.I. and similar), Spreader (Concrete, Asphalt, or Stone), Tire Repairman (when assigned to a jobsite), Tower Mobile, Tractors (all types), Trencher, Tug Boat, Vermeer Saw, Welder (repairman), Whirley
* Cranes with Boom or Mast length (including jib) 100 ft or over shall be paid an additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
** Rough Terrain Cranes with Boom or Mast length (including jib) 101 ft or over shall be paid an Additional $.50 per hour for each 50-foot increment of additional boom and/or jib length)
Note: An additional $1.25 per hour (not counting boom pay) shall be paid for any crane (excluding overhead cranes) rated 100 ton or over.
CLASS II
Ballast Regulator, Boat (material or personnel)(powered), Boiler, Boring Machine, Compressor (combined with Air Tugger, Air Pump, Gunite Machine, or Sand Blaster), Concrete Belt Placer, Concrete Saw, Conveyor, Carry Crane, Crushing/Screening Plants, Curb Builder (self-propelled), Forklifts (ridden or self-propelled), Form Line Machine, Generator (over 5KW), Grout Pump, Heaters, Hoist (monorail, roof, one drum-regardless of power used), Huck Machine (or similar), Hydraulic Jack (single or multiple)(power driven), Ladavator, Mortar Mixer, Mulching Machine, Pavement Breaker (self-propelled or ridden), Pin Puller (powered), Pipe Cleaning Machine, Pipe Dream, Power Broom (except push type), Pulverizer, Pumps (regardless of power used), Roller/Compactor (Dirt), Refrigeration Plant, Ross Carrier (or similar), Seeding Machine, Skid Steer Loader (or similar), Slab Lifting Machine (hydraulic), Soil Stabilizer (pump type), Spray Cure Machine (power driven), Side Delivery Shoulder Spreader (attachment), Steam Jenny (or similar), Stone Crusher, Stone Spreader (self-propelled), Siphon (steam or air), Tie Tamper (multiple heads), Tractor (when used for landscaping, snaking, or hauling), Truck (Winch)(when hoisting and placing), Tube Finisher (C.M.I. and similar), Tugger, Water Blaster, Welding Machine, Well Point System
CLASS III
Brakeman, Deck Hand, Helicopter Signalman, Oiler*, Elevator (Alterations & Remodeling Commercial Buildings),
* Oilers on Truck Cranes: less than 50 ton shall receive $.10 over the Class III base rate; 50 ton up to 100 ton rated capacity shall be paid an additional $.25 per hour over the Class III base rate; 100 ton and over shall be paid an additional $1.00 per hour over the Class III base rate.
General Note: Hazardous Material Sites Level C & D receive $1.00 per hour premium for all classifications and Levels A & B receive $2.50 premium for all classifications
IRON0207-001 06/01/2009
Rates Fringes
IRONWORKER (Structural, Ornamental & Reinforcing)........$ 26.66 16.83
* LABO0952-001 06/01/2009
Rates Fringes
Laborers:
GROUP 1.....................$ 20.92 9.09
GROUP 2.....................$ 21.07 9.09
GROUP 3.....................$ 21.20 9.09
GROUP 4.....................$ 21.67 9.09
GROUP 5.....................$ 19.75 9.09
LABORERS CLASSIFICATIONS
GROUP 1: COMMON LABORER: Building laborer, Brick removal for alterations; Carryable pumps; West brick buggy or similar;
Walk behind forklift or similar (non self-propelled);
Stripper and mover of forms as follows: cement masons, footers, forms not to be reused on the job, forms that are a matter of record; Tool room man; all material conveyors (regardless of power used, including starting and stopping); Pouring of mortar or aggregate into blocks of voids
GROUP 2: SKILLED LABORER: West brick buggy or similar (self propelled); Power wheelbarrows and buggies; walk behind forklift or similar (self propelled); Drill runner;
(including Drill Mounted on Truck, Track or similar); All operators of compacting equipment; Pipe layer; Burner;
Jackhammer man - concrete buster; Vibrator operator; Clay spade and/or similar; Gunnite nozzleman; Blaster; Concrete saw operator; Hod carrier; Scaffold builder; Air track operator; Bell and Bottom Man on funace and stacks; Grout machine feeder and pump operators, Gunnite machine operator or similar; Gunnite potman or similar; Mortar Mixer; Mortar
Mixer machine (regardless of power used, including starting and stopping); Wagon drill operator; Laser cleaner; Lancer
GROUP 3: Asbestos Removal or Abatement Laborer
GROUP 4: Toxic or Hazardous Waste Handling Laborer
GROUP 5: Flag Person
LABO0952-004 07/01/2008
Rates Fringes
Landscaping
GROUP 1.....................$ 18.03 8.47
GROUP 2.....................$ 18.45 8.47
GROUP 3.....................$ 18.75 8.47
LANDSCAPING CLASSIFICATIONS
GROUP 1: Landscape laborer to include general landscaping work and the driving of trucks for the distribution of materials on the job site but not to include trucks used to transport supplies to the job
GROUP 2: Skilled Landscape Laborer to plant all types of trees and shrubs without direct supervision.
GROUP 3 - Landscape tractor operator to operate small industrial rubber tire tractor equipped with front end loader and backhoe attachment or a skid loader with landscape attachments used for the sole purpose of landscape work including soil spreading, unloading and loading of materials and such other landscaping work but not for heavy and highway construction work
* PAIN0057-008 08/01/2009
Rates Fringes
Painters:
Brush, Roller and Spray.....$ 24.77 12.63
PAIN0847-001 06/01/2009
Rates Fringes
GLAZIER..........................$ 25.16 11.54
PLAS0031-005 06/01/2009
LAWRENCE COUNTY
PLASTERER........................$ 26.13 11.65
PLAS0031-012 06/01/2009
MERCER COUNTY (Western half)
Rates Fringes
PLASTERER........................$ 26.13 11.65
PLAS0526-001 06/01/2007
MERCER COUNTY: Townships of Greene, Sugar Grove, Salem, Sandy Creek, Deer Creek, French, Mill Creek, New Vernon, Perry, Fairview, Lake, Sandy Lake, Worth, Jackson, Wolf Creek, Pine, Liberty and Findley. Also included are portions of the following townships determined by a line running in a north western direction from the center of the southern border of Springfield Township north by a line running east to north west from southern border of Otter Creek Township to approximately the center of the Western boundary of West Salem township, Springfield, Coolspring, Otter Creek, Hempfield and West Salem
PLASTERER........................$ 23.29 11.42
PLAS0526-004 12/01/2008
LAWRENCE COUNTY AND REMAINDER OF MERCER COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 24.79 11.82
PLUM0047-002 05/01/2009
Rates Fringes
Plumber and Steamfitter..........$ 32.20 16.44
* ROOF0071-001 06/01/2009
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 21.40 13.48
SFPA0669-001 04/01/2009
SPRINKLER FITTER.................$ 33.85 16.55
SHEE0012-001 07/01/2008
LAWRENCE COUNTY
Rates Fringes
Sheet metal worker...............$ 30.20 18.76
SHEE0033-001 06/01/2009
MERCER COUNTY
Rates Fringes
Sheet metal worker...............$ 27.66 10.87
TEAM0040-004 01/01/2009
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 24.23 $11.44+ A+B
GROUP 2.....................$ 24.38 $11.51+ A+B
GROUP 3.....................$ 24.91 $11.75+ A+B
FOOTNOTES:
A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Single Axle (2 axles including steering axle);
Includes partsman and warehoueman
GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)
GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);
Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .