Conformed Price Schedule 09B0002.pdf
PDF 23 KB Posted
- Solicitation number
- W911WN09B0002
About this file
Revised Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Results for 09B0002 Berlin Crest Gates.doc | DOC document | |
| 13 34 19 Am1.pdf | ||
| QUESTIONS AND ANSWERS.doc | DOC document | |
| 01 22 00.00 10 Am1.pdf | ||
| W911WN09B0002 Amend 02.pdf | ||
| ATTENDANCE REGISTER.doc | DOC document | |
| W911WN09B0002 Amendment 0001.doc | DOC document | |
| W911WN09B0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN-09-B-0002
BERLIN CREST GATE REHAB
REVISED PRICE SCHEDULE
AMENDMENT 02
DATED 5/4/09
PLEASE USE THE ATTACHED SCHEDULE OF LINE ITEMS FOR BIDDING
PURPOSES. ONLY THIS SCHEDULE WILL BE ACCEPTED WITH YOUR BID
PACKAGE. PLEASE REMEMBER TO COMPLETE THE TOTALS AT THE END OF
THIS DOCUMENT.
Any questions or issues, contact Ms. Donna Dooen at 412-395-7468 or donna.y.dooen@usace.army.mil
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NON ARRA FUNDS
This contract line item includes sub-clins 0001AA through 0001AE and is for informational purposes only. Insert pricing information in sub-clins only and total on page 13. These line items are non-arra funded.
0001AA 1 Lump Sum Rembursement for actual performance and payment bond premiums (non-arra funds)
0001AB 1 Lump Sum Mobilization and Preparatory work
(non-arra funds)
0001AC 24 Months Progress Photographs
(non-arra funds)
0001AD 1 Lump Sum Gate #1 Rehabilitation
Painting/Testing (non-arra funds)
0001AE 1 Lump Sum Gate #2 Rehabilitation
Painting/Testing (non-arra funds)
ARRA FUNDS
This contract line item includes sub-clins 0002AAthrough 0002AR and is for informational purposes only. Insert pricing information in sub-clins only and total on page 13. These line items are ARRA funds.
0002AA 1 Lump Sum Gate #3 Rehabilitation
Painting/Testing (ARRA funds)
0002AB 1 Lump Sum Gate #4 Rehabilitation
Painting/Testing (ARRA funds)
0002AC 1 Lump Sum Stoplogs and Spreader Beam
(ARRA funds)
0002AD 12 Each Pocket Wheeels for Hoists
0002AE 10 Each Idler Pulleys for Hoists
0002AF 10 Set Hoist Chains, Type "A" and Type "B" (ARRA funds)
0002AG 1 Lump Sum Traveling Hoist
Enclosure and Foundation (ARRA funds)
0002AH 1 Lump Sum Traveling Hoist
Rail System (ARRA funds)
0002AJ 1 Lump Sum Paint Traveling Hoist
0002AK 1 Lump Sum Paint Bulkhead
0002AL 1 Lump Sum Paint Two Ring Jet Valves
0002AM 1 Lump Sum Epoxy Flooring Overlay
0002AN 1 Lump Sum Refurbish/Paint
Gate #1 Hoist Machinery (ARRA funds)
0002AP 1 Lump Sum
Gate #2 Hoist Machinery (ARRA funds)
0002AQ 1 Lump Sum
Gate #3 Hoist Machinery (ARRA funds)
0002AR 1 Lump Sum
Gate #4 Hoist Machinery (ARRA funds)
0002AS Lump Sum
RESERVED
DELETED NOT USED
0003AA Lump Sum
T
0004AA Lump Sum
0005AA Lump Sum
TOTALS
TOTAL, TEMS 0001AA THROUGH 0001AE (non ARRA) $_________________________
TOTAL, ITEMS 0002AA THROUGH 0002AR (ARRA) $_________________________
TOTAL, ITEMS 0001AA THROUGH 0002AR $_________________________________
Do no round off totals, in case of a variation between the unit price and the extension, the unit price will be considered to be the bid. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a prorata basis to every unit price in the bid schedule. If Item 0001AA is not applicable because the bid is under $25,000, the bidder should state “N/A” in the space provided for the amount.
The following is a list of abbreviations and their meanings as used in the price schedule under U/M (unit of measure):
EA Each LS Lump Sum MO Month SE Sets
File details come from the government source that posted it. Updated .