This document summarizes a solicitation for proposals related to the Adaptive Resilient Engineered Structures (ARES) program. The solicitation seeks trade study proposals to identify structures technologies that enhance performance, efficiency, versatility, extreme environment reliability, and availability for Future Vertical Lift aircraft. Proposals should define a trade study approach, candidate technologies, and plans to integrate technologies and demonstrate to TRL 6. The period of performance for the trade study is 13 months with anticipated funding of $3 million in FY21 and $1.1 million in FY22 to be divided among three awards. Upon study completion, one offeror will be selected for a technology demonstration with anticipated funding of $0.7 million in FY23, $0.75 million in FY24, $2.1 million in FY25, and $3.1 million in FY26. Proposals are due by June 4, 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 - W911W6-21-R-0007 Adaptive Resilient Engineered Structures (ARES).pdf | ||
| NDA Call W911W6-21-R-0007.pdf | ||
| W911W6-21-R-0007 TIA Template.docx | DOCX document | |
| NDA Call W911W6-20-R-0007.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 - W911W6-21-R-0007: Questions and Answers: 2 June 2021
Questions and Answers
Broad Agency Announcement: W911W6-20-R-0009
Call Number: W911W6-21-R-0007
Adaptive Resilient Engineered Structures (ARES)
Issued By:
ARMY CONTRACTING COMMAND - REDSTONE
BUILDING 401 LEE BOULEVARD
FORT EUSTIS, VIRGINIA 23604-5577
Date: 2 June 2021
QUESTIONS & ANSWERS
Reference/Location Question Response
1 Call paragraph 5.4
Funding
Can you confirm if funding is available, and if yes to what extent? It was our understand that a call would not be issued against a Master
BAA unless funding was available, but we recognize that Par 5.4
Funding states is not available.
Funding is anticipated for this effort
2 Call paragraph 5.1
Proposal Instructions;
Volume 2 – Price/Cost
Proposal
Is the cost estimate Volume 2 in the 35 page count limitation or not? No
Call paragraph 2.0
Background & Purpose
Per the language for the Trade Study Report from Attachment 1 of the draft TIA, the Government will provide recommended changes/revisions. The solicitation includes the statement below.
“Based upon the ARES trade study reports and a detailed cost proposal, the Government will fund one Offeror to continue development and demonstration of the technology solutions during
The Final Trade Study Report will be subject to
Government assessment for continued funding.
- 2 - W911W6-21-R-0007: Questions and Answers: 2 June 2021
GFY 23-26, using a modification to the selected Offeror’s trade study funding instrument.” Will the Government's assessment of the trade study report to fund one Offeror be based on the initial or final trade study report submittal?
Call Section 5.3
Period and Place of
Performance
5.3 in the solicitation states that the period of performance is anticipated to be 13 months total. The draft TIA includes a period of performance from 09/30/2021 to 11/29/2022, which is 14 months.
Please advise.
Anticipated period of performance is 13 months
I was trying to locate the Master Broad Agency Announcement
(BAA) W911W6-20-R-0009 in Sam.gov as we’re finalizing our proposal, but it does not come up in my search. I have only been able to pull up the current solicitation that we have been working from: W911W6-21-R-0007. Do you know how I can access
W911W6-20-R-0009?
The Master BAA this Call was issued against is in the
“inactive” status when searching.
6 TIA Template Section G Do we need to include content from Section G of the provided TIA
(discusses DCMA’s monitoring and audit functions of the recipient’s programs) in our proposal?
Only Section G items in yellow required