Overhead Crane Repair-Aberden Proving Ground, MD
Solicitation number
W911W518T9636
Issued by

View the file

Other files

File Type Posted
Attachment_3_Questions.pdf PDF
Solicitation.docx DOCX document
Solicitation.docx DOCX document
Attachment_2_Map.PNG PNG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) APG Overhead Crane Repair Service July 26, 2018

1.0 – Scope The contractor shall provide all labor and materials to perform all identified repairs on 2 each DEMAG 20 cranes located at buildings 4727 and 4728 on Aberdeen Proving Ground, MD. All costs must be included in any bid. Travel will not be reimbursed separately. All work shall be inspected by the Government prior to acceptance and payment.

2.0 - Requirements

2.1 In building 4727 install 130 feet of ground bar, connect to crane, and perform and pass operational tests of all crane functions. All work shall be in accordance with Occupational Safety and Health Administration (OSHA) 1910.179 and Code of Federal Regulation (CFR) standards and regulations applicable to overhead and gantry cranes.

2.2 In building 4727 remove current crane control pendant and replace with 3 motion, 2 speed pendant, with on/off button. Shall perform and pass operational test of all crane controls.

2.3 In building 4728 install 175 feet of ground bar, connect to crane, and perform and pass operational tests of all crane functions. All work shall be in accordance with Occupational Safety and Health Administration (OSHA) 1910.179 and Code of Federal Regulation (CFR) standards and regulations applicable to overhead and gantry cranes.

2.4 In building 4728 replace trolley gear box seals and perform and pass operational test of all crane functions.

2.5 In building 4728 remove current crane control pendant and replace with 3 motion, 2 speed pendant, with on/off button. Shall perform and pass operational test of all crane controls.

2.6 Contractor shall furnish and install all parts in accordance with the crane manufacturer’s specifications. The Contractor shall provide replacement parts from the original manufacturers or substitute parts approved by the original manufacturer(s).

3.0 – Documents

3.1 Certification that all work has been accomplished in accordance with OSHA 1910.179and CFR standards and all items are operational.

4.0 – Place of Performance/Period of Performance

4.1 All of these tasks shall be performed at buildings 4727 and 4728 located on Aberdeen Proving Ground, Maryland.

4.2 Period of performance for repair will commence on a date to be agreed upon after source selection, and shall not exceed 20 consecutive business days (Monday thru Friday, 0800-1700 hours).