Attach_0011_-_CDRL_A009_COP.PDF

PDF 104 KB Posted

Attached to
902nd MI Security Support Services
Solicitation number
W911W4-18-R-0030
Issued by

About this file

ATTACH 0011 - CDRL A009 COP

View the file

Other files

File Type Posted
W911W418R0030,_Amendment_0002_.pdf PDF
Solicitation_Questions_Response_28_Jun_18.xlsx XLSX spreadsheet
Attach_0014_-_NDA_(Amend_0001)_.pdf PDF
Attach_0009_-_CDRL_A007_MSR_(Amend_0001)_.pdf PDF
Attach_0001_-_902_SSR_GFPM_(Amend_0001)_.xlsx XLSX spreadsheet
W911W418R0030_Amendment_0001.pdf PDF
W911W418R0030_Final_(14_Jun_18).pdf PDF
Attach_0001_-_902_SSR_GFPM_Rev_1_.xlsx XLSX spreadsheet
Attach_0007_-_CDRL_A005_Spreadsheet_Tracker.pdf PDF
Attach_0004_-_CDRL_A002_PMP.PDF PDF
Attach_0003_-_CDRL_A001_Post_Award.pdf PDF
Attach_0002_-_DD254_(12_Jun_18).pdf PDF
Attach_0009_-_CDRL_A007_MSR.PDF PDF
Attach_0012_-_CDRL_A010_Incoming_Transition.pdf PDF
Attach_0013_-_CDRL_A011_Outgoing_Transition.pdf PDF
Attach_0010_-_CDRL_A008_QCP.PDF PDF
Attach_0005_-_CDRL_A003_Meeting_Minutes.pdf PDF
Attach_0008_-_CDRL_A006_Daily_Manning.pdf PDF
CDRL_A008_QCP.PDF PDF
CDRL_A003_Meeting_Minutes.pdf PDF
CDRL_A010_Incoming_Transition.pdf PDF
CDRL_A001_Post_Award.pdf PDF
CDRL_A004_Quality_Report_and_Inspections.pdf PDF
CDRL_A011_Outgoing_Transition.pdf PDF
W911W418R0030_Solicitatio1.docx DOCX document
CDRL_A007_MSR.PDF PDF
CDRL_A002_PMP.PDF PDF
CDRL_A009_COP.PDF PDF
CDRL_A005_Spreadsheet_Tracker.pdf PDF
CDRL_A006_Daily_Manning.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A009
title: Contingency Operations Plan (COP)
sub:
auth: DI-TCSP-80227
ref: Para C.4.1.2
req_ofc: U.S. ARMY 902d MI GROUP
dd250: NO
appcode: N/A
dist: N/A
freq: Award Date
asof: Block 16
firstsub: Block 16
subsub: Block 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: KO
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: Block 10, 11, 12, and 13: COP shall be submitted within 30 days after contract award.

Revised COP within five (5 ) working days after changes occur.

Block 4: Tailor COP as follows:

• establish and maintain a complete contingency plan to ensure continuation of services during periods of emergency

• such as a national wartime mobilization IAW DODI 1100.22, Policy and Procedures for Determining Workforce Mix

-Block 14: Review shall be submitted both hard copy and electronically.

- Review shall be prepared in contractor format and submitted to the KO and COR.

group:
total_price:
prep_name: MICHAEL J. HAAS
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat: X
system: SECURITY SUPPORT SERVICES
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
prep_date: 3/1/2018
app_by:
app_date:
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it.