This is a Performance Work Statement (PWS) for Fort Bliss "Best of the Best" Signage Vinyl Graphics Replacement and Stand-Alone Banner Stand Production Services.
The Contractor shall provide turnkey annual refurbishment of twenty-four (24) single-sided 5'x9' outdoor roadside recognition signs and production/delivery of sixty (60) complete 80"x33" free-standing, stand-alone vinyl banner stands across a 12-month Base Year (04 January 2027 – 03 January 2028) and three (3) 12-month Option Years, with an optional six-month extension period. The contract is a Commercial Firm-Fixed-Price (FFP) award under RFO FAR Part 12 and RFO FAR Part 13. Key deliverables include: (1) pre-installation site verification and digital graphic proof package submission within 10 business days of Government-Furnished Information (GFI) receipt; (2) 100% thermal/chemical vinyl stripping and 70%–99% Isopropyl Alcohol (IPA) surface preparation of all 24 metal sign faces; (3) printing and installation of 24 outdoor 5'x9' cast vinyl graphics with 2.0-mil matte clear UV overlaminate on existing Fort Bliss roadside structures within 20 business days of Contracting Officer's Representative (COR) proof approval; (4) production and FOB Destination delivery of 60 complete 80"x33" vinyl banner stands (including support frame, base, hardware, and carrying cases) within 20 business days of proof approval to 1st Armored Division Headquarters (11685 Sergeant Major Blvd, Fort Bliss, TX 79918); and (5) comprehensive 1-year desert workmanship and material warranty guaranteeing zero peeling, edge-lifting, bubbling, cracking, or UV fading. The contract includes six technical exhibits detailing the Master 24-Sign GPS Coordinate schedule, physical dimensions, graphic layout breakdown, and indoor banner stand specifications. Contractor personnel must be U.S. citizens, complete AT Level I, iWATCH, and OPSEC training within 10 calendar days of award, and the Lead Outdoor Vinyl Graphics Installer must hold current commercial large-format vinyl installation certification (3M Preferred, Avery Dennison, or PDAA Certified Installer equivalent with minimum two years verifiable experience). The small business prime Contractor shall not subcontract more than 50 percent of the Government-paid amount to entities not similarly situated under FAR 52.219-14. Work is performed both off-site at the Contractor's commercial production facility and on-site at Fort Bliss along four primary installation traffic corridors (Blue, Orange, Black, and Purple) during 0800–1600 Mountain Time, Monday–Friday, excluding Federal holidays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FORT BLISS "BEST OF THE BEST" SIGNAGE VINYL GRAPHICS REPLACEMENT
AND STAND-ALONE BANNER STAND PRODUCTION SERVICES
1ST ARMORED DIVISION (1AD), FORT BLISS, TEXAS
FBTX 'Best of the Best' Signage PWS | Rev 1.3
1. GENERAL INFORMATION
1.1. Description of Services/Introduction
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Fort Bliss “Best of the Best” Signage Vinyl Graphics Replacement and Stand-Alone Banner Stand Production Services as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2. Background
The 1st Armored Division (1AD) at Fort Bliss, El Paso, Texas maintains twenty-four (24) permanent, concrete-reinforced roadside steel sign structures (each featuring a 5-foot high by 9-foot wide single-sided painted/powder-coated metal sign face panel mounted with 48 inches [4 feet] of ground clearance, 8 feet 0 inches overall post height, and 9 feet 6 inches overall width between posts) positioned along four primary installation traffic corridors (Blue Corridor [Sergeant Major Blvd South], Orange Corridor [Liberty Expressway / Spur 601], Black Corridor [Old Ironsides Ave Central], and Purple Corridor [3ABCT / Biggs East]), as well as sixty (60) indoor command display banner stands (80 inches long by 33 inches wide) displayed inside headquarters and command facilities.
Because 1AD conducts recurring “Best of the Best” Soldier, crew, and unit competitions and because the El Paso Chihuahuan Desert climate (Solar Zone 3 irradiance, 105°F– 115°F summer ambient temperatures, high UV index, and windborne desert sand) rapidly degrades standard monomeric calendared vinyl 1AD requires recurring professional stripping of old vinyl and adhesives, chemical substrate preparation, wide-format printing on exterior-grade cast or high-tack polymeric blockout vinyl with a matched 2.0-mil matte clear UV overlaminate, on-site roadside installation, and production/delivery of 60 complete free-standing, stand-alone vinyl banner stands (with support frame and base, complete frame hardware, and carrying cases) across a 12-month Base Year and three (3) 12-month Option Years.
1.3. Objectives
The primary objectives of this requirement are to:
• Execute complete pre-installation site verification and pre-press digital proofing ({A.007}) for sixteen (16) unique outdoor 5‘x9’ sign graphic layouts (printed across 24 signs: 8 designs at Quantity 2 each and 8 designs at Quantity 1 each) and six (6) unique vertical 80“x33” banner stand layouts (each featuring three [3] stacked horizontal Soldier/crew photographs, printed at 10 copies per design = 60 total banner stands) within ten (10) business days of receiving Government-Furnished Information (GFI) print-ready JPEG files from 1AD Public Affairs (PAO);
• Perform 100% thermal and low-VOC chemical stripping of existing sun-baked vinyl graphics and residual adhesive across all twenty-four (24) 5‘x9’ metal sign faces (1,080 sq. ft. total per period), followed by multi-stage 70%–99% Isopropyl Alcohol (IPA) surface preparation and bare-metal “Before” photo verification ({A.009});
• Print, laminate (with a 2.0-mil matte clear UV-inhibiting overlaminate to prevent solar and headlight glare), transport, and install twenty-four (24) 5‘x9’ outdoor vinyl graphics onto the existing Fort Bliss roadside structures within twenty (20) business days of COR proof approval;
• Print (at 720 DPI minimum, 1200 DPI preferred), finish, assemble, and deliver sixty
(60) complete 80“x33” free-standing, stand-alone vinyl banner stands (to include support frame and base, complete frame hardware, and individual carrying cases) ({A.008}) to 1st Armored Division Headquarters (11685 Sergeant Major Blvd, Fort Bliss, TX 79918) within twenty (20) business days of COR proof approval; and
• Provide a comprehensive 1-year desert workmanship and material warranty ({A.010}) guaranteeing zero peeling, edge-lifting, bubbling, cracking, or UV fading across each 12-month period.
1.4. Scope
The Contractor shall perform turnkey annual batch refurbishment of twenty-four (24) single-sided 5‘x9’ outdoor roadside recognition signs and turnkey production and FOB Destination delivery of sixty (60) complete 80“x33” free-standing, stand-alone vinyl banner stands (with support frame and base, complete frame hardware, and carrying cases), along with associated contract data deliverables Not Separately Priced [NSP]).
Each 12-month contract period (Base Year and Option Years 1 through 3) includes exactly one (1) complete refresh cycle of all 24 outdoor signs (consisting of 16 unique PAO-supplied graphic designs: 8 designs printed twice and 8 designs printed once) and all 60 stand-alone banner stands (consisting of 6 unique 3-photo vertical composite designs printed 10 times each). No civil construction, structural steel welding, concrete foundation work, or electrical/LED wiring is included in this scope.
1.5. Period of Performance
The period of performance shall be for one (1) Base Year of twelve (12) months and three (3) 12-month Option Years, plus an optional six (6)-month extension period under FAR 52.217-8 (Option to Extend Services), if exercised by the Contracting Officer (total evaluated lifecycle of 54 months). The Period of Performance reads as follows:
• Base Year: 04 January 2027 – 03 January 2028 (12 Months)
• Option Year 1: 04 January 2028 – 03 January 2029 (12 Months)
• Option Year 2: 04 January 2029 – 03 January 2030 (12 Months)
• Option Year 3: 04 January 2030 – 03 January 2031 (12 Months)
• FAR 52.217-8 Extension (If Exercised): Up to six (6) months (04 January 2031 – 03 July 2031)
1.6. General Information
1.6.1. Quality Control
The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor‘s Quality Control Plan (QCP) is the means by which they assure themselves that their work complies with the requirement of the contract.
The Contractor shall submit a comprehensive Quality Control Plan (QCP) ({A.001}) to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within ten
(10) business days after contract award, and within five (5) business days of any subsequent revision.
1.6.2. Quality Assurance
The Government will evaluate the Contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3. Recognized Holidays
The Contractor is not required to perform on-site installation or delivery services at Fort Bliss on the following recognized Federal holidays:
• New Year's Day
• Martin Luther King Jr.'s Birthday
• President's Day
• Memorial Day
• Juneteenth National Independence Day
• Independence Day
• Labor Day
• Columbus Day
• Veterans Day
• Thanksgiving Day
• Christmas Day
1.6.4. Hours of Operation
The Contractor is responsible for conducting on-site Fort Bliss roadside survey, vinyl stripping, surface preparation, installation, and banner stand delivery between the hours of 0800 and 1600 Mountain Time (MT), Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. To prevent traffic congestion at Fort Bliss Access Control Points (ACPs) and along primary division corridors, the Contractor shall not stage work vehicles on roadside shoulders during peak installation commuter windows (0600–0800 MT and 1600–1730 MT). The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5. Place of Performance
The work to be performed under this contract will be performed across two environments:
• Off-Site Contractor Facility: Pre-press graphic layout compositing, digital proofing, wide-format printing, 24-hour ink outgassing, UV lamination, and banner stand assembly shall be performed at the Contractor's commercial production facility.
• On-Site at Fort Bliss, Texas (79916 / 79918): Pre-installation site verification, thermal/chemical vinyl stripping, IPA surface preparation, and 5‘x9’ vinyl installation shall be performed on-site across the twenty-four (24) roadside sign locations along the Blue, Orange, Black, and Purple corridors at Fort Bliss, El Paso, Texas as listed in Technical Exhibit C (Master 24-Sign GPS Coordinate, Dimension, and Graphic Schedule). The sixty (60) completed 80“x33” stand-alone banner stands shall be delivered FOB Destination in a single batch shipment to 1st Armored Division Headquarters Building, 11685 Sergeant Major Blvd, Fort Bliss, El Paso, TX 79918.
1.6.6. Type of Contract
The Government will award a Commercial Firm-Fixed-Price (FFP) contract under RFO FAR Part 12 and RFO FAR Part 13.
1.6.7. Security Requirements
Contractor personnel performing on-site work at Fort Bliss shall be United States citizens capable of passing standard Fort Bliss Directorate of Emergency Services (DES) background vetting (National Crime Information Center Interstate Identification Index [NCIC-III] and Terrorist Screening Database [TSDB]) to obtain an unescorted Fort Bliss Installation Access Pass. No security clearance (Confidential, Secret, or Top Secret) or DD Form 254 is required under this contract.
1.6.7.1. Physical Security
The Contractor shall be responsible for safeguarding all Government equipment, information, and property provided for Contractor use (specifically the 24 existing roadside sign structures and GFI digital files).
1.6.7.2. Key Control
RESERVED (No Government facility keys are issued to the Contractor).
1.6.7.3. Lock Combinations
RESERVED.
1.6.7.4. Antiterrorism (AT) Level I Training
All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within ten (10) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and prior to on-site mobilization at Fort Bliss. The Contractor shall submit certificates of completion ({A.002}) for each affected Contractor employee and subcontractor employee to the COR or to the Contracting Officer within ten (10) calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://jko.jten.mil.
1.6.7.5. Access and General Protection/Security Policy and Procedures Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Installation Provost Marshal Office, Director of Emergency Services (DES), or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes. The Contractor shall submit a complete Fort Bliss Installation Access Pass Roster & Vehicle Registration List ({A.005}) to the COR at least five (5) business days prior to on-site mobilization.
1.6.7.6. Contractors Who Do Not Require CAC, But Require Access to a DoD Facility or Installation Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
1.6.7.7. iWATCH Training The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within ten (10) calendar days of contract award and within ten (10) calendar days of new employees commencing performance, with the results ({A.003}) reported to the COR NLT ten (10) calendar days after contract award.
1.6.7.8. Army Training Certification Tracking System (ATCTS)
RESERVED (Contractor personnel do not require CACs or access to DoD/Army IT networks).
1.6.7.9. Operations Security (OPSEC) Standing Operating Procedure/Plan
RESERVED.
1.6.7.10. Operations Security (OPSEC) Training
Per AR 530-1, Operations Security, new Contractor employees must complete Level I OPSEC training within ten (10) calendar days of their reporting for duty and prior to on-site work at Fort Bliss. All Contractor employees must complete annual OPSEC awareness training. The Contractor shall submit OPSEC training completion certificates ({A.004}) to the COR within ten (10) calendar days of contract award.
1.6.7.11. Information Assurance (IA)/Information Technology (IT) Training
RESERVED.
1.6.7.12. Information Assurance (IA)/Information Technology (IT) Certification
RESERVED.
1.6.7.13. Contractor Authorized to Accompany the Force
RESERVED (CONUS performance only).
1.6.7.14. Performance or Delivery in a Foreign Country
RESERVED.
1.6.7.15. Handling or Access to Classified Information
RESERVED (No access to classified information; DD Form 254 is not applicable).
1.6.7.16. Threat Awareness Reporting Program (TARP)
RESERVED.
1.6.7.17. Public Release Artwork & Unclassified Government-Furnished Information (GFI) Handling All “Best of the Best” Soldier, crew, and unit recognition photographs, unit insignias, and graphic templates furnished by the Government are captured, edited, and formally cleared by the 1st Armored Division Public Affairs Office (1AD PAO) for Unclassified Public Release prior to distribution to the Contractor. No Controlled Unclassified Information (CUI) or classified information will be provided to, generated by, or processed on Contractor information systems under this contract. Accordingly, commercial print production servers do not require NIST SP 800-171 CUI security enclaves for processing PAO-cleared public display graphics. However, the Contractor shall safeguard all GFI digital files against unauthorized commercial reuse or alteration in accordance with Paragraph 1.6.15 (Data Rights) and shall not photograph active Fort Bliss Access Control Points (ACPs), restricted flight lines, or tactical areas not part of the 24 designated roadside sign structures.
1.6.8. Special Qualifications & Subcontracting Compliance (FAR 52.219-14)
• Lead Installer Qualification: The Contractor's on-site Lead Outdoor Vinyl Graphics
Installer must hold a current commercial large-format vinyl installation certification (3M Preferred/Certified Graphics Installer, Avery Dennison Certified Wrap/Graphics Installer, Professional Decal Application Alliance [PDAA] Certified Installer, or documented commercial equivalent with a minimum of two (2) years of verifiable commercial exterior cast vinyl installation experience).
• Limitations on Subcontracting (FAR 52.219-14 & 13 CFR 125.6): In accordance with FAR 52.219-14, the small business prime Contractor shall not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities (first-tier subcontractors that also qualify as small business concerns under NAICS 541890). All on-site subcontractor personnel must comply with all Fort Bliss access vetting, training, and safety requirements in this PWS.
1.6.9. Post Award Conference/Periodic Progress Meetings
The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Post Award Kickoff Meeting shall be held virtually or at Fort Bliss within five (5) business days of contract award (or option period exercise), at which time the COR will transfer the PAO-cleared print-ready JPEG graphic files (GFI). The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor‘s performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor’s performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10. Contracting Officer Representative (COR)
The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:
maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
Designated Requiring Activity Technical POC / COR: Mr. Erik Vasquez, G4 Logistics, GS-11, HQ 1st Armored Division, Fort Bliss, TX, (915) 744-7917, erik.e.vasquez.civ@army.mil.
1.6.11. Key Personnel
The following personnel are considered key personnel by the government:
• Contract / Project Manager (LAB-01): Serves as the primary point of contact with the KO and COR for scheduling, GFI receipt, digital proof submissions ({A.007}), Fort Bliss access coordination, and warranty administration.
• Lead Outdoor Vinyl Graphics Installer (LAB-04): Supervises on-site thermal/chemical stripping, IPA substrate preparation, roadside safety, and cast vinyl/UV laminate installation across all 24 Fort Bliss sign locations.
The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0800 and 1600 MT, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.12. Identification of Contractor Employees
All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to wear a company identification badge and high-visibility ANSI/ISEA 107 Class 2 safety vest during roadside work, and to identify themselves as Contractors at all times. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.6.13. Contractor Travel
No separate travel reimbursement (TDY, airfare, lodging, per diem, or mileage) is authorized under this contract. All local commuting, vehicle mobilization across the 24 Fort Bliss roadside sign locations, and FOB Destination freight/delivery costs for the 60 banner stands shall be included in the Contractor's Firm-Fixed-Price (FFP) line items.
1.6.14. Other Direct Costs (ODCs)
No separately reimbursable ODCs exist under this contract. All vinyl films, UV overlaminates, banner stand frames, carrying bags, chemical adhesive removers, Isopropyl Alcohol (IPA), edge sealers, and off-post waste disposal costs are included within the Firm-Fixed-Price (FFP) contract price.
1.6.15. Data Rights
The Government has unlimited rights to all documents/material produced under this contract. All high-resolution Soldier/crew photographs, 1st Armored Division insignias, digital proofs ({A.007}), and before/after installation photographs ({A.009}) furnished or generated under this contract are and shall remain the exclusive property of the U.S.
Government (DFARS 252.227-7013). These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.16. Organizational Conflict of Interest
Contractor and subcontractor personnel performing work under this contract do not have access to source selection sensitive or proprietary third-party data; however, the Contractor agrees to immediately notify the KO if any potential Organizational Conflict of Interest (OCI) under FAR Subpart 9.5 arises.
1.6.17. Phase In / Phase Out Period
RESERVED (Work is executed in scheduled annual batch refreshes within 30 business days of GFI issuance).
1.6.18. Roadside Work-Zone Safety & Environmental Protection
Because the 24 existing 5‘x9’ signs are situated along active Fort Bliss roadways (Sergeant Major Blvd, Liberty Expy/Spur 601, Old Ironsides Ave, and 3ABCT corridors), the Contractor shall submit a Roadside Work-Zone Safety & Environmental Compliance Plan ({A.006}) to the COR at least five (5) business days prior to on-site mobilization.
Field crews shall wear ANSI/ISEA 107 Class 2 high-visibility vests, deploy Manual on Uniform Traffic Control Devices (MUTCD)-compliant traffic cones around parked service vehicles on roadside shoulders, and comply with OSHA 29 CFR 1910/1926 and USACE EM 385-1-1 safety standards. All stripped vinyl waste, backing liners, and chemical solvent rags shall be collected in sealed containers and removed off-post daily for lawful commercial disposal in accordance with AR 200-1 and 30 TAC (TCEQ). Dumping chemical strippers or solvents onto Fort Bliss soil or storm drains is strictly prohibited.
2. DEFINITIONS & ACRONYMS
2.1. Definitions
Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer's Representative (COR): An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
Work Week: Monday through Friday, unless specified otherwise.
Telegraphing: A surface defect in which unremoved old vinyl edges, residual adhesive bumps, or surface contaminants show through newly applied pressure-sensitive vinyl film.
2.2. Acronyms
• 1AD: 1st Armored Division
• ACP: Access Control Point
• AQL: Acceptable Quality Level
• AR: Army Regulation
• ASTM: American Society for Testing and Materials
• AT: Antiterrorism
• CFR: Code of Federal Regulations
• CLIN: Contract Line Item Number
• CMYK: Cyan, Magenta, Yellow, and Key (Black) Color Model
• CONUS: Continental United States (excludes Alaska and Hawaii)
• COR: Contracting Officer Representative
• CUI: Controlled Unclassified Information
• DA: Department of the Army
• DES: Directorate of Emergency Services
• DFARS: Defense Federal Acquisition Regulation Supplement
• DOD: Department of Defense / Department of War
• DPI: Dots Per Inch
• FAR: Federal Acquisition Regulation
• FFP: Firm-Fixed-Price
• GFE: Government-Furnished Equipment
• GFI: Government-Furnished Information
• GFP: Government-Furnished Property
• HQ: Headquarters
• IPA: Isopropyl Alcohol
• KO: Contracting Officer
• MICC: Mission and Installation Contracting Command
• MUTCD: Manual on Uniform Traffic Control Devices
• NCIC-III: National Crime Information Center Interstate Identification Index
• NSP: Not Separately Priced
• OCI: Organizational Conflict of Interest
• ODC: Other Direct Costs
• OPSEC: Operations Security
• OSHA: Occupational Safety and Health Administration
• PAO: Public Affairs Office
• PDAA: Professional Decal Application Alliance
• PIEE: Procurement Integrated Enterprise Environment
• POC: Point of Contact
• PRS: Performance Requirements Summary
• PWS: Performance Work Statement
• QA: Quality Assurance
• QASP: Quality Assurance Surveillance Plan
• QC: Quality Control
• QCP: Quality Control Plan
• SCLS: Service Contract Labor Standards
• STD: Performance Standard
• TCEQ: Texas Commission on Environmental Quality
• TSDB: Terrorist Screening Database
• USACE: U.S. Army Corps of Engineers
• UV: Ultraviolet
• VOC: Volatile Organic Compound
• WAWF: Wide Area Workflow
3. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.1. Services
The Government will provide COR coordination for Fort Bliss DES installation access pass sponsorship and will inspect/approve digital proofs ({A.007}) within three (3) business days of submission.
3.2. Facilities
The Government will grant on-site access to the twenty-four (24) existing roadside 5‘x9’ sign structures along the Blue, Orange, Black, and Purple corridors at Fort Bliss, TX (detailed in Technical Exhibit C). No indoor Government workshop or storage space is provided.
3.3. Utilities
None. The 24 roadside sign locations do not have electrical outlets or running water hookups. The Contractor's field installation vehicles must be 100% self-contained (equipped with portable generators/inverters for heat guns and self-contained water/cleaning supplies).
3.4. Equipment
None. Zero Government-Furnished Property (GFP) or Government-Furnished Equipment (GFE) is provided under this contract.
3.5. Materials / Government-Furnished Information (GFI)
Within five (5) business days of contract award (and within five (5) business days of each Option Year exercise), the COR and 1st Armored Division Public Affairs Office (1AD PAO) will provide the Contractor with the following Unclassified / Public Release Government-Furnished Information (GFI):
• Sixteen (16) Unique Print-Ready High-Resolution JPEG Graphic Files cleared by 1AD PAO for the 24 outdoor 5‘x9’ signs (8 files designated for printing at Quantity 2 each = 16 signs; 8 files designated for printing at Quantity 1 each = 8 signs; Total = 24 signs);
• Print-Ready High-Resolution JPEG Soldier/Crew Photographs and 1AD Branding Header/Footer Assets for the six (6) unique vertical 80“x33” indoor banner stand designs (each vertical banner layout stacks three [3] horizontal event photographs as shown in Technical Exhibit C; printed at 10 copies per design = 60 total banner stands); and
• The Master 24-Sign GPS Coordinate and Corridor Assignment Schedule (Technical Exhibit C).
4. CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1. General
The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Secret Facility Clearance
RESERVED (Not Applicable — Unclassified commercial services).
4.3. Materials
The Contractor shall furnish all commercial printing media, overlaminates, banner stand frames, carrying bags, and surface preparation chemicals meeting the following minimum salience specifications:
4.3.1. Outdoor Sign Vinyl & Matte UV Overlaminate (24 Signs - 5'x9')
• Base Vinyl Film: Exterior-grade 3.2-mil to 4.0-mil thickness minimum cast PVC vinyl or high-tack polymeric outdoor blockout vinyl with gray/opaque adhesive backing to prevent substrate show-through (such as 3M Controltac/Scotchcal, Avery Dennison MPI series, Arlon DPF 8000, or equal). Monomeric promotional calendared vinyl is strictly prohibited.
• Matte Clear UV Overlaminate: Matched 2.0-mil thickness minimum cast fluoropolymer or polyurethane UV-inhibiting matte clear overlaminate (such as 3M Scotchcal 8520 Matte Overlaminate, Avery Dennison DOL 1380Z Matte, or Arlon Series 3220 Matte or equal) engineered to withstand Zone 3 desert solar exposure, extreme heat up to 115°F and eliminate road/headlight glare.
• Print Resolution & Outgassing: Printed in full CMYK color at 720 DPI to 1200 DPI (1200 DPI preferred) using UV-curable, latex, or eco-solvent outdoor inks, with a mandatory 24-hour solvent outgassing cure period prior to lamination (when solvent/eco-solvent inks are used) and edge-sealing fluid applied to exposed perimeter edges.
• Stripping & Surface Prep Consumables: The Contractor shall furnish commercial-grade, non-corrosive citrus/low-VOC adhesive strippers and 70%–99% Isopropyl Alcohol (IPA) degreasers compatible with existing painted metal/aluminum/composite sign substrates without damaging the underlying structural frame or concrete supports.
4.3.2. Stand-Alone Vinyl Banner Stands (60 Units - 80"x33")
• Banner Media & Print Resolution: Heavy-duty 13 oz minimum curl-resistant smooth blockout anti-glare matte vinyl/polymeric banner media (80 inches long by 33 inches wide), printed single-sided in full-color CMYK at 720 DPI minimum (1200 DPI preferred) with zero edge curling.
• Stand Hardware: Free-standing, stand-alone support frame and base to include complete frame hardware sized specifically for an 80“x33” vertical banner graphic panel. Each stand-alone banner stand shall include a sturdy, non-tipping free-standing base, vertical/horizontal tension support poles/frame, top and bottom mounting bars/hooks.
• Carrying Case: Each of the 60 complete banner stand units shall be furnished with an individual padded or heavy-duty zippered nylon carrying case/bag.
4.4. Equipment
The Contractor shall furnish self-contained commercial service vehicles, portable generators/inverters, industrial heat guns/steamers, step-ladders/work platforms (suitable for signs mounted 48 inches off the ground with a 9-foot top edge), MUTCD roadside traffic cones, ANSI Class 2 safety vests, and wide-format digital printing/lamination equipment.
5. SPECIFIC TASKS
5.1. Basic Services
The Contractor shall provide turnkey outdoor sign vinyl graphics replacement , stand-alone vinyl banner stand production and delivery, and contract data deliverables across a 12-month Base Year and three (3) 12-month Option Years in accordance with the specific tasks below.
5.2. Tasks
5.2.1. Task 1 — Pre-Installation Site Verification & Pre-Press Digital Proofing
5.2.1.1. Roadside Sign Verification
Within ten (10) business days of receiving GFI for each contract period, the Contractor shall verify the physical dimensions (5‘ High x 9’ Wide), substrate condition (painted/powder-coated metal sign panels mounted 48 inches off the ground on 8-foot steel posts), and GPS corridor assignments of all twenty-four (24) existing roadside signs at Fort Bliss per Technical Exhibit C.
5.2.1.2. Pre-Press Compositing & Digital Proof Package Submission ({A.007}) Within ten (10) business days of receiving the PAO-cleared print-ready JPEG files from the COR, the Contractor shall prepare and submit a complete Digital Graphic Proof Package ({A.007}) in PDF/JPEG format to the COR for written approval prior to initiating any production printing. Each period's proof package shall consist of:
• Sixteen (16) Unique Outdoor 5‘x9’ Sign Proofs: Scaled 5‘x9’ CMYK proofs for the 16 competition categories, clearly annotated with the print run quantity (8 designs x Qty 2 = 16 signs and 8 designs x Qty 1 = 8 signs; Total = 24 signs) and the assigned GPS corridor location (Blue-1 through Purple-6) per Technical Exhibit C; and
• Six (6) Unique Vertical 80“x33” Banner Stand Proofs: Scaled 33“ wide by 80” long CMYK composite proofs (Banner Designs #1 through #6, each stacking three (3) horizontal PAO-supplied Soldier/crew photographs vertically with 1AD branding headers/footers per Technical Exhibit C), annotated for a production run of 10 copies per design (60 total banner stands).
Performance Standard (STD): 100% of the 16 unique outdoor sign proofs (covering all 24 signs) and 6 unique banner stand proofs (covering all 60 stands) submitted within 10 business days of GFI receipt and approved in writing by the COR prior to printing.
Acceptable Quality Level (AQL): Zero (0) unauthorized print runs prior to written COR approval; maximum of one (1) proof revision cycle corrected within two (2) business days.
5.2.2. Task 2 — Thermal/Chemical Stripping of Existing Vinyl & Metal Substrate Preparation
5.2.2.1. Complete Vinyl & Adhesive Removal
Prior to applying new vinyl graphics, the Contractor shall perform 100% removal of existing sun-baked vinyl graphics, overlays, and residual adhesive across all twenty-four
(24) 5‘x9’ single-sided metal sign faces using commercial heat guns/steamers, non-scratch plastic scrapers, and biodegradable, low-VOC citrus/terpene adhesive removers without gouging or damaging the underlying metal sign panel. Applying new vinyl over existing vinyl layers (“over-posting”) is strictly prohibited.
5.2.2.2. Multi-Stage IPA Cleaning & Bare-Metal "Before" Photo Verification ({A.009}) Immediately following adhesive removal, the Contractor shall clean each 5‘x9’ metal sign face with 70%–99% Isopropyl Alcohol (IPA) and lint-free wipes until 100% free of oil, wax, citrus solvent residue, and desert dust, and capture a date/time-stamped “Before” (bare-substrate) photograph of each sign (24 photos total) prior to applying new vinyl.
5.2.2.3. Daily Off-Post Waste Disposal
The Contractor shall collect all stripped vinyl scraps, release liners, and solvent wipes in sealed containers and haul all waste off Fort Bliss daily for lawful commercial disposal in accordance with AR 200-1 and 30 TAC (TCEQ).
Performance Standard (STD): 100% of old vinyl and residual adhesive stripped to bare painted/powder-coated metal and cleaned with 70%–99% IPA across all 24 signs prior to new vinyl application, documented by 24 date-stamped “Before” photographs ({A.009}).
Acceptable Quality Level (AQL): Zero percent (0%) over-posting, residual adhesive bumps, or surface telegraphing; 100% daily off-post waste removal.
5.2.3. Task 3 — Outdoor 5'x9' Cast Vinyl Printing, Matte UV Lamination, & Roadside Installation
5.2.3.1. Wide-Format Printing, Outgassing, & Matte Lamination Upon written COR approval of the digital proofs ({A.007}), the Contractor shall print all twenty-four (24) 5‘x9’ sign faces at 720–1200 DPI on 3.2–4.0 mil exterior cast or high-tack polymeric blockout vinyl, observe a minimum 24-hour solvent outgassing cure period (if solvent/eco-solvent inks are used), and cold-laminate each graphic with a matched 2.0-mil matte clear UV-inhibiting overlaminate per Paragraph 4.3.1.
5.2.3.2. On-Site Roadside Installation & Edge Sealing
Within twenty (20) business days of COR proof approval, the Contractor‘s certified installation crew shall install all 24 laminated 5’x9' vinyl graphics at their assigned GPS locations (Blue-1 through Purple-6 per Technical Exhibit C) when substrate surface temperatures are within manufacturer limits (typically 50°F–95°F), trim all edges flush to the metal panel perimeter, apply commercial edge-sealer fluid to prevent wind-lift, and capture a date/time-stamped “After” photograph of each completed sign (24 photos total) for the Before & After Photo Verification Report ({A.009}).
Performance Standard (STD): All 24 outdoor 5‘x9’ signs printed on compliant cast/high-tack vinyl with 2.0-mil matte UV overlaminate and installed bubble-free, wrinkle-free, and square within +/- 1/8 inch of panel edges within 20 business days of COR proof approval.
Acceptable Quality Level (AQL): No more than one (<= 1) sign out of 24 exhibiting minor edge/bubble touch-up items at final inspection, which shall be corrected by the Contractor within three (3) business days at $0.00 cost to the Government.
5.2.4. Task 4 — Stand-Alone 80"x33" Vinyl Banner Stand Production & Delivery
5.2.4.1. Banner Printing, Frame Fitting, & Packaging
Upon written COR approval of the 6 vertical banner proofs ({A.007}), the Contractor shall print sixty (60) single-sided 80“x33” banners (6 unique designs x 10 copies each = 60 banners) at 720 DPI minimum (1200 DPI preferred) on 13 oz (or 10–13 mil) curl-resistant smooth blockout matte vinyl media, finish each banner, pair and assemble each banner with a free-standing, stand-alone support frame and base to include complete frame hardware (Paragraph 4.3.2), and pack each unit in its individual zippered carrying case/bag.
5.2.4.2. FOB Destination Batch Delivery to 1AD Headquarters ({A.008}) Within twenty (20) business days of COR proof approval, the Contractor shall deliver all sixty (60) complete banner stand units in a single batch shipment (FOB Destination) to 1st Armored Division Headquarters Building, 11685 Sergeant Major Blvd, Fort Bliss, TX
79918, and obtain a signed Banner Stand Delivery Receipt & Packing List ({A.008}) from the COR.
Performance Standard (STD): All 60 complete 80“x33” free-standing, stand-alone banner stands (6 designs x 10 copies, including support frame and base, complete frame hardware, and carrying cases) delivered within 20 business days of COR proof approval.
Acceptable Quality Level (AQL): 100% quantity delivered (60 units); 98% defect-free upon delivery (no more than 1 banner stand out of 60 exhibiting frame/hardware defects or print flaws); 100% replacement of any defective unit within five (5) business days at $0.00 cost to the Government.
5.2.5. Task 5 — Daily Site Cleanup, Environmental Compliance, & Roadside Work- Zone Safety
5.2.5.1. Roadside Work-Zone Safety Execution
During all on-site work along Fort Bliss roadways, the Contractor shall operate strictly in accordance with the approved Roadside Work-Zone Safety & Environmental Compliance Plan ({A.006}), deploying MUTCD traffic cones, wearing ANSI/ISEA 107 Class 2 high-visibility safety vests, and avoiding roadside shoulder staging during peak commuter hours (0600–0800 MT and 1600–1730 MT).
5.2.5.2. Daily Site Cleanup & Off-Post Waste Removal
At the conclusion of each work day, the Contractor shall leave all roadside sign areas clean and free of debris, and remove all stripped vinyl waste, backing liners, and solvent rags off Fort Bliss in sealed containers in accordance with AR 200-1 and 30 TAC
(TCEQ).
Performance Standard (STD): 100% compliance with MUTCD roadside safety controls, off-peak work hours, and daily off-post waste removal.
Acceptable Quality Level (AQL): Zero (0) safety violations, unauthorized commuter-window lane obstructions, or unremoved roadside waste.
5.2.6. Task 6 — 1-Year Desert Workmanship & Material Warranty
5.2.6.1. Warranty Coverage & 10-Day Remediation ({A.010})
Upon final COR acceptance of each period‘s refresh, the Contractor shall provide a signed 1-Year Workmanship & Material Warranty Certificate ({A.010}) warranting all 24 outdoor 5’x9' sign graphics and 60 indoor banner stands for twelve (12) months against peeling, edge-lifting (> 1/4 inch), bubbling, cracking, delamination, or excessive UV color fading (> 15% Delta-E shift) under Fort Bliss Zone 3 desert exposure (excluding verified third-party vehicle collision or vandalism). If any covered defect occurs during the 12-month warranty period, the Contractor shall repair or re-print and re-install the affected sign(s) or banner stand(s) within ten (10) business days of written COR notification at $0.00 cost to the Government.
Performance Standard (STD): Zero un-remediated peeling, edge-lifting > 1/4 inch, bubbling, delamination, or UV fading (> 15% Delta-E) for 12 months post-acceptance.
Acceptable Quality Level (AQL): 100% of valid warranty claims repaired or replaced within 10 business days of COR notification at $0.00 cost to the Government.
5.3. Service Contract Reporting (SCR)
RESERVED (Not Applicable — Total contract value is below the DoD Service Contract Reporting threshold under DFARS 252.204-7023).
6. APPLICABLE PUBLICATIONS
6.1. Applicable Publications (Current Editions)
The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures:
Publication Number
Title Date / Edition
Mandatory
(M) or Advisory (A)
Applicable
PWS
Paragraph(s
AR 190-13 The Army Physical Security Program
27 JUN 2019
(Current)
M 1.6.7, 1.6.7.5, 1.6.7.6
HQ 1AD & FB
Reg 385-10
Fort Bliss Installation Safety Regulation
September 2017 (or current)
M 1.4
AR 385-10 The Army Safety and Occupational Health Program
24 July 2023 (or current)
M 1.4
AR 420-1 Army Facilities Management 12 February
2008 / RAR
(or current)
M 1.4
Army Directive 2014-05
Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
07 MAR
M 1.6.7.6
AR 530-1 Operations Security (OPSEC) 26 SEP 2014 (Current)
M 1.6.7.10, 1.6.7.17
Publication Number
Title Date / Edition
Mandatory
(M) or Advisory (A)
Applicable
PWS
Paragraph(s
AR 200-1 Environmental Protection and Enhancement
13 DEC
(Current)
M 1.6.18, 5.2.2.3, 5.2.5.2
USACE EM
385-1-1
Safety and Occupational Health Requirements
15 MAR
M 1.6.18, 5.2.2, 5.2.3, 5.2.5.1
OSHA 29 CFR
1910 / 1926
Occupational Safety and Health Standards / Safety and Health Regulations for Construction
Current Edition
M 1.6.18, 4.4, 5.2.5.1
FHWA MUTCD Manual on Uniform Traffic Control Devices for Streets and Highways (Part 6: Temporary Traffic Control)
11th Edition
(DEC 2023)
M 1.6.18, 4.4, 5.2.3.2, 5.2.5.1
30 TAC (TCEQ) Texas Administrative Code, Title 30: Texas Commission on Environmental Quality Solid Waste & VOC Rules
Current Edition
M 1.6.18, 4.3.1, 5.2.2.3, 5.2.5.2
ASTM D4956 /
SAE J2527
Standard Specification for Outdoor Weathering / Accelerated Xenon- Arc UV Exposure of Exterior Films
Current Edition
A 4.3.1, 5.2.6.1
7. ATTACHMENT/TECHNICAL EXHIBIT LISTING
7.1. Attachment/Technical Exhibit List
• Technical Exhibit A – Performance Requirements Summary (PRS)
• Technical Exhibit B – Deliverables Schedule ({A.001} through {A.010})
• Technical Exhibit C – Master 24-Sign GPS Coordinate, Physical Dimension, &
Graphic Layout Schedule (Outdoor Signs & Indoor Banner Stands)
TECHNICAL EXHIBIT A: PERFORMANCE REQUIREMENTS SUMMARY (PRS)
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
(PWS
Paragraph)
Performance Standard (STD)
Acceptable Quality Level
(AQL) /
Performance Threshold
Method of Surveillanc e
Remedy / Payment Impact
PRS-1: Pre- Installation Site Verification & Digital Proof Package
(PWS 5.2.1,
{A.007})
Contractor verifies all 24 roadside sign locations and submits scaled CMYK digital proofs for all 16 unique 5'x9' sign designs (24 signs total) and 6 unique 80"x33" banner stand designs (60 stands total) within 10 business days of GFI receipt.
0 unauthorized print runs prior to written COR approval; <= 1 revision cycle corrected within 2 business days.
100% Inspection of Digital Proof Package ({A.007}) by
COR & 1AD
PAO/G37.
Re-submission of corrected proofs within 2 business days at $0.00 Government cost prior to printing authorization.
PRS-2: 100%
Thermal/Che mical Stripping, Bare-Metal IPA Prep & Daily Waste Removal
(PWS 5.2.2 &
5.2.5, Contractor strips 100% of existing vinyl and adhesive residue across all 24 metal sign faces (1,080 sq. ft.), cleans with 70%–
99% IPA,
removes waste
0% over-posting, residual adhesive bumps, or surface telegraphing;
100% daily off-post waste disposal & MUTCD safety compliance.
100% Review of 24 "Before" Photograph s ({A.009}) + Periodic On- Site COR Spot Checks.
Immediate stop-work on affected sign;
Contractor must strip to bare metal and re-apply new vinyl at $0.00 Government
Performance Objective
(PWS
Paragraph)
Performance Standard (STD)
Acceptable Quality Level
(AQL) /
Performance Threshold
Method of Surveillanc e
Remedy / Payment Impact
{A.009}) off-post daily, and submits 24 date-stamped "Before" bare-metal photos.
cost.
PRS-3:
Outdoor 5'x9' Cast Vinyl Printing, Matte UV Lamination & Roadside Installation
(PWS 5.2.3,
{A.009})
All 24 signs (16 unique designs: 8 x Qty 2, 8 x Qty
1) printed at 720– 1200 DPI on 3.2–
4.0 mil cast/high-tack blockout vinyl with 2.0-mil matte clear UV overlaminate and installed bubble-free, wrinkle-free, and square within +/- 1/8 inch within 20 business days of proof approval.
<= 1 sign out of 24 requiring minor touch-up at final inspection, corrected within 3 business days at $0.00 cost.
100% Inspection of 24 Installed Signs & 24 "After" Photos ({A.009}) by
COR.
Re-print and/or re-installation of non-conforming sign face within 3 business days at $0.00 cost prior to invoice acceptance.
PRS-4: 60
Stand-Alone 80"x33" Vinyl Banner Stands (PWS 5.2.4, {A.008})
All 60 complete free-standing, stand-alone banner stands (6 unique 3-photo vertical designs x 10 copies each, to include support frame and base, complete frame hardware, and
100% quantity (60 units) delivered; <= 2 units with minor print/frame defects replaced within 5 business days at $0.00 cost.
100% Receipt & Quality Inspection by COR upon delivery at
1AD HQ
({A.008}).
Replacement of defective banner or frame hardware within 5 business days at $0.00 cost prior to invoice
Performance Objective
(PWS
Paragraph)
Performance Standard (STD)
Acceptable Quality Level
(AQL) /
Performance Threshold
Method of Surveillanc e
Remedy / Payment Impact carrying cases) printed at 720 DPI min (1200 DPI preferred) on 13 oz curl-resistant blockout media and delivered to 1AD
HQ (11685
Sergeant Major Blvd) within 20 business days of proof approval.
acceptance.
PRS-5: 1-
Year Desert Workmanship & Material Warranty
(PWS 5.2.6,
{A.010})
Zero peeling, edge-lifting (> 1/4 inch), bubbling, cracking, delamination, or UV fading (> 15% Delta-E) across all 24 outdoor signs and 60 banner stands for 12 months post-acceptance.
100% of valid warranty claims repaired or replaced within 10 business days of COR notification at $0.00 cost.
Periodic
COR
Corridor Inspections & Customer Complaint Monitoring during 12-month warranty.
Mandatory warranty repair/replace ment within 10 business days at $0.00 cost;
documented in CPARS if unfulfilled.
TECHNICAL EXHIBIT B: DELIVERABLES SCHEDULE
All deliverables listed below are Not Separately Priced [NSP] in accordance with DoDM 5010.12-M.
Deliverab le ID
Deliverable Title & PWS Reference
Frequency # of Copies
Medium / Format
Submit To
{A.001} Quality Control Plan
(QCP) (PWS 1.6.1)
Within 10 business days after contract award; within 5 business days of any revision.
Electronic Copy
PDF or MS Word (.docx) via Email
KO & COR
(erik.e.vasquez.
civ@army.mil)
{A.002} AT Level I Training Completion Certificates (PWS 1.6.7.4)
Within 10 calendar days of award / prior to on-site mobilization (and annually per Option Year).
Electronic Set
PDF Certificates via Email
COR
{A.003} iWATCH Training Completion Roster
(PWS 1.6.7.7)
Within 10 calendar days of award / prior to on-site mobilization (and annually per Option Year).
Electronic Copy
PDF / Signed Memo via Email
COR
{A.004} Level I OPSEC Training…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .