This is a Request for Information (RFI) document issued by the Department of the Army, Mission and Installation Contracting Command (MICC) at Fort Bliss, Texas, for electrical modifications to Building 1002. The RFI solicitation number is W911SG26RA024.

The project involves installing twelve (12) new electrical receptacles distributed across walls and center posts within a basement: two duplex receptacles on the north wall, three on the east wall, three on the west wall, one quad receptacle and one duplex receptacle on the south wall, and one receptacle per center post on two center posts. The quad receptacle is counted as one outlet within the twelve-outlet total and requires 20 amps on a single circuit. All twelve physical receptacle locations must be wired with new 20-amp branch circuits that may share circuits. The Government has confirmed that new dedicated branch circuits are required, metallic conduit meeting code requirements must route to a centrally located junction box on the east wall, and four existing receptacle covers must be replaced with matching code-compliant covers. The center posts are located 10 feet and 33 feet from the panel, with receptacles mounted 12 to 18 inches from the finished floor.

The project also requires installation of an external generator transfer switch with the following specifications: 60-amp manual transfer switch rated at 120V, three-phase, service-rated, NEMA 1 enclosure, contractor-furnished with an inlet box/power inlet as part of the installation. The Government will furnish the generator, which requires a 50-amp, three-phase connection. The transfer switch will serve the entire existing panel as an emergency standby that will be manually switched during power outages. The existing electrical panel is a 150-amp main KA panel with 208/120V, three-phase, four-wire service. Government representatives must be present during transfer switch functional testing. Authorized construction work hours are 0730 to 1630. The Government has authorized mounting and drilling in walls using existing passthroughs and will provide diagrams and drawings upon request.

View the file

Other files

File Type Posted
Solicitation - W911SG26RA024.pdf PDF
MOC ELECTRICAL UPGRADE SOW V3 20260508.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[Type here]

SOLICITATION #W911SG26RA024

Request for Information

DEPARTMENT OF THE ARMY

MISSION AND INSTALLATION CONTRACTING COMMAND

MICC-Fort Bliss Bldg. 111 Pershing Road Fort Bliss, TX 79916

SOLICITATION# W911SG26RA024

Request for Information

Question

1. Total Receptacle Quantity / Center Posts The solicitation identifies a total of twelve (12) new outlets. The SOW specifically identifies:

Please confirm:

o Two (2) duplex receptacles on the north wall

Yes two on north wall o Three (3) duplex receptacles on the east wall

Yes, three on the east wall o Three (3) duplex receptacles on the west wall

Yes three on the west wall o One (1) quad receptacle and one (1) duplex receptacle on the south wall

Yes, One (1) quad receptacle and one (1) duplex receptacle on the south wall o Receptacles at the center posts

One per post, 2 total o The total number of center posts requiring receptacles.

2 Center post o The total number of physical receptacle locations to be installed.

Request for Information

12 locations o Whether the quad receptacle is counted as one outlet within the stated total of twelve (12).

Yes counted as one, not separate circuit. 20 amps

ANSWER:

Question:

2. Generator Transfer Switch Please provide or confirm the required specifications for the external generator transfer switch, including:

o Manual or automatic transfer switch

Manual transfer switch o Ampere rating

Electrical: Generator (60amp with Manual Transfer Switch) o Voltage and phase

120V o Number of poles

Two total o Service-rated or non-service-rated

Service rated o Required NEMA enclosure rating

NEMA 1

o Manufacturer or approved equal, if applicable

Approved Equal

Request for Information o Whether the transfer switch is Government-furnished or Contractor-furnished

Contractor furnished in bid o Whether the generator is Government-furnished or Contractor-furnished

Government furnished o Required generator connection or inlet configuration

50 Amp, 3 phase

3. Loads Served by Generator Transfer Switch Please identify which electrical loads are intended to be supplied through the transfer switch. Please confirm whether the transfer switch will serve:

o The entire existing panel, o A dedicated emergency/standby panel, or o Selected branch circuits only.

Request for Information

Yes the entire existing panel as an emergency standby that will be manually switched and generator added when needed during power outages

4. Existing Electrical System Information Please provide available information for the existing electrical equipment serving the basement, including:

o Panel manufacturer and model o Panel voltage and phase o Main breaker/service rating o Available breaker spaces o Available electrical capacity o Existing grounding/bonding arrangement

ANSWER:

PNL KA 150A MAIN

208/120V 3PH 4W

5. Branch Circuit Requirements Please confirm:

o Whether new dedicated branch circuits are required for the twelve (12) new receptacles.

o Required circuit amperage, if predetermined.

o Whether multiple receptacles may share circuits.

o Whether GFCI or AFCI protection is required at any of the new locations.

New Branch circuits, 20 amps, and receptacles may share circuits

Request for Information

6. Raceway and Conductor Requirements The SOW requires metallic conduit routed to a centrally located junction box on the east wall. Please confirm:

o Whether EMT is acceptable for the interior raceway.

o Minimum conduit size, if specified.

o Required conductor type and minimum conductor size.

o Whether all new circuits are required to originate from the central east-wall junction box before routing to the existing panel.

Needs conduit that meets requirement to have cables.

Question:

7. Existing Outlet Covers The SOW requires replacement of all existing outlet covers within the basement with matching, code-compliant covers. Please provide the approximate quantity of existing receptacle/device covers requiring replacement, if known.

ANSWER:

Four existing receptacles.

Question:

8. Drawings / Existing Conditions Please confirm whether additional electrical drawings, panel schedules, one-line diagrams, photographs, or as-built information are available for Building 1002 that may assist offerors in determining existing conditions and quantities.

ANSWER:

Diagrams and drawings are available upon request

Question:

9. Historic Building Requirements Because Building 1002 is identified as being within the viewshed of the Early Cold War Guided Missile Instruction Historic District, please confirm whether there are any specific restrictions concerning:

Request for Information o Wall penetrations o Exterior penetrations o Raceway routing o Fasteners or anchors o Transfer-switch mounting location

ANSWER:

Authorized to mount and drill in wall. Use existing passthroughs.

Question:

10. Transfer Switch Testing and Commissioning Please confirm the required testing and commissioning procedures for the generator transfer switch and whether a Government representative must witness functional testing.

Government rep must be present.

11. Work Hours / Outages Please confirm the normal authorized construction work hours for this project and whether installation of the transfer switch will require a scheduled electrical shutdown. If a shutdown is anticipated, please provide any required advance-notice or coordination requirements.

0730 to 1630

Question:

Center Posts

Hight and distance from the panel on each installation.

Request for Information

ANSWER:

12 to 18 inches from the finished floor, Column #1: 10 feet , Column #2: 33 feet

Question:

12.External Generator Transfer Switch - Please provide the required specifications for the external generator transfer switch, including:

o Amperage rating o Voltage / phase (single-phase or three-phase) o Manual or automatic o Preferred manufacturer or approved equal (if any) o Whether a generator inlet box / power inlet is required as part of the installation

60 Amps, 120 V, 3 PH, Manual, Inlet box/ power inlet is required as part of the installation.

QUESTION:

13. Existing Outlet Covers - The SOW requires replacement of all existing outlet covers within the basement for uniformity. Approximately how many existing outlets/covers are present in the basement that will require replacement?

ANSWER:

Four outlets.

Question:

14. Power Source / Panel From which existing panel(s) will the new circuits be fed?

Brand and Model of circuit breakers. Are new circuit breakers required in an existing panel, or is a new subpanel anticipated?

Request for Information

Refer to question drawing on question 15

15. Drawings If these drawings are available, please provide them (or confirm they will be issued via amendment) so that conduit routing, exact outlet locations, and existing conditions can be accurately estimated.

Request for Information