RFI Response Bldgs 2413 and 2416.pdf

PDF 187 KB Posted

Attached to
Building 2413 Roof and Interior Repair
Solicitation number
W911SG25BA041
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Buildings 2413 and 2416, addressing three key inquiries from potential contractors. The Q&A clarifies that core samples will not be permitted, no as-built drawings are available from the Department of Public Works (DPW), and Buildings 2413 and 2416 have identical specifications. Specifically, both buildings require installation of Thermoplastic Polyolefin (TPO) roofing material with a minimum thickness of 72 mil or greater.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers, Bldgs 2413 and 2416

Will Coring Samples be allowed?

o No, it is not possible to take core samples Will as-built drawings be added?

o DPW has not as-builts drawings for the buildings. No, it won’t be add as-builts drawings

Do Buildings 2413 and 2416 have the same or similar specs?

o Yes, it is the same specs. Furthermore, both buildings shall be installed TPO of a minimum of 72 mil or thicker.