B15 RFI Answers.pdf
PDF 199 KB Posted
- Attached to
- B15 Roof Replacement Federal contract opportunity
- Solicitation number
- W911SG25BA016
About this file
This document is a Request for Information (RFI) Questions and Answers document for the B15 Roof Replacement project (Solicitation W911SG25BA016). The RFI addresses key clarifications about project staffing requirements, including that the superintendent, Safety and Security Health Officer (SSHO), and Quality Assurance/Quality Control (QA/QC) must be separate personnel, with SSHO and QA/QC requiring full-time commitment. Additional clarifications include confirmation that tax should be included in the proposal, prevailing wages will remain consistent throughout the project, and a CLIN 0002 for lead abatement is included based on survey findings.
The RFI also provides guidance on obtaining roof measurements, indicating that original as-built drawings will be attached to the solicitation for measurement purposes. The project involves replacing the roof system for Building 15 at Fort Bliss, TX, with specific requirements for a new metal shingle roof system, including wood plank deck replacement, self-adhering underlayment, and metal roof shingles. The project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated value between $250,000 and $500,000, and a 120-day performance period after Notice to Proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offerors OF_1419 Page 4.pdf | ||
| Abstract of Offerors OF_1419 Page 3.pdf | ||
| Abstract of Offerors OF_1419 Page 2.pdf | ||
| Abstract of Offerors OF_1419 Page 1.pdf | ||
| Original As-Built Drawings.pdf | ||
| Sign in Sheet.pdf | ||
| Wage Determination.txt | TXT text file | |
| Solicitation - W911SG25BA016.pdf | ||
| LBP Bldg. 15 (soffit fascia) (003).pdf | ||
| Bldg 15 Drawings.pdf | ||
| Asbestos Survey 19655 Cherokee Bldg. 15.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference No. SOLICITATION W911SG25BA016 – B15 Roof Replacement
RFI QUESTIONS AND ANSWERS
W911SG25BA016
B15 Roof Replacement
1) Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
RESPONSE: Superintendent and SSHO must be two different people.
2) If no to the question above, will the SSHO need to be full-time for this project?
RESPONSE: Yes, SSHO must be full time.
3) Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?
RESPONSE: No, Superintendent cannot be the QA/ QC.
4) If no to the question above, will the QA/QC need to be full time for this project?
RESPONSE: Yes, QA/QC will be full-time.
5) Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?
RESPONSE: No, the superintendent must be a different person from SSHO and QA/QC. The SSHO and QA/QC can be the same person.
6) Please confirm if tax should be included in our proposal?
RESPONSE: Yes, tax should be included in the proposal.
7) Please provide the latest wage determination for this project’s county.
RESPONSE: Wage determination was uploaded in SAM.gov
8) Please confirm if the current prevailing wages will be consistent for the life of the project with no escalation?
RESPONSE: Yes, since there are no options on the project, the wages will be consistent.
9) The pricing includes a line item for Asbestos labeled (if needed), requesting consideration making this line item an option CLIN that was there is competitive pricing, but it will only be exercised if needed by executing a bilateral modification. Also recommend option CLIN for the lead as listed in 1.4.2.2. of the SOW.
RESPONSE: CLIN 0002 is labeled Abatement (if needed). Surveys indicate that there is lead, therefore, this CLIN will be used for lead abatement.
10) Can the GOV provide the square footage of the roof on building 15 , it does not appear to be listed in the SOW. OR identify where it is listed on the drawings and/or specifications?
RESPONSE: Please see the file attached with the original roof drawings for additional measurements. Please refer back to the drawings on the solicitation for other specifications such as vent placement, etc. (****Original As-built Drawings are only for the measurements.****)