W911SG24R00030002.pdf
PDF 1 MB Posted
- Attached to
- 1/1 AD New BLDG Signage Federal contract opportunity
- Solicitation number
- W911SG24R0003
About this file
This document is an amendment to a solicitation for a contract to provide and install signage at buildings 20100 and 21200 on Fort Bliss, TX. The key details are:
The contractor shall create and install various signage elements, including aluminum composite letters, logos, and unit crests, on the exteriors of the two buildings. The total period of performance is 10 days, including weekends and holidays. The solicitation has been amended to extend the period of performance from the original 5 days. Pricing shall be on a fixed-price basis. The contracting office is MICC - Fort Bliss (919th CBN). The amendment also provides answers to contractor questions regarding the size and placement of the signage elements. The Government will be providing access to facilities and utilities, but the contractor must furnish all other required materials and equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building 20100 and 21200 pictures 4.4.24.pdf | ||
| Building 20100 and 21200 pictures.pdf | ||
| W911SG24R00030001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SG24R0003
0012049895
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to
1. Answ er questions from contractors
2. Update Statement of Work
3. Update attachment
4. Extend Period of Performance.
All other terms and conditions remain the same.
1. CO NTRACT ID CODE P AGE OF P AGES
J 1 37
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 04-Apr-2024
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer )(Signature of person authorized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W911SG24R0003
X 9B. DAT ED (SEE IT EM 11)
12-Mar-2024
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN
REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr -2024
CODE
MICC - FORT BLISS (919TH CBN)
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. AD MINISTERED BY (If other t han item 6)
4. REQUISITION/PU RCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTION AND ANSWER
Question 1 :
Front of Building 20100 Eagle Way:
Height and Length for the area selected below. As per pg.1, front of the building should include all 7 (2’ X 2’) Crest and 1ST ARMORED BRIGADE COMBAT TEAM (18” 6mm), we want to make sure the signage and lettering will fit within the designated space.
Answer 1: Changes have been made please refer to updated SOW and Attachment.
Question 2 :
Building 21200
Picture of Front B calls for 1ST ARMORED DIVISION, DIVISION SUSTAINMENT BRIGADE MULESKINNERS (12 ½” Black Komacel Letters) but
1.4.1 Scope of work calls for MULESKINNER STRONG (18.5”). Please clarify.
Answer 2: Changes have been made please refer to updated SOW and Attachment.
Question 3:
Please confirm size for Crest and Mule Logo for all Building 21200 and Height and Length of designated space at Front B where 4 crests and Text is requested to be installed.
Answer 3: Changes have been made please refer to updated SOW and Attachment.
Question 4 : Paragraph 1.5 Period of Performance
As per paragraph 1.5 Period of Performance shall be for 5 days. The stipulated period of performance may not be sufficient to ensure the completion of the signage due to the considerable quantity of signage that needs to be installed and the time required for the fabrication of these signs.
Answer 4: Solicitation has been amended to reflect POP to ten days.
Question 5 : Will you install the letters or do we need to quote installation as well?
Answer 5: Instillation should be quoted as it is part of SOW At the moment when I was doing a rendition with the information provided in the pictures, I realized that the letters could stretch more than you might want so please see the pictures attached for you to have a better graphic idea of what I am trying to explain.
Question 6 : 4. Are we going to use only black aluminum composite material for all letters or are we also going to use black komacel material for Muleskinners?
Answer 6: All letter will be 6mm black black aluminum composite material except one set on BLDG 20100, please refer to SOW.
SECTION SF 1449 - CONTINUATION SHEET
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 15-APR-2024 TO
19-APR-2024
N/A 0001 AR HHC 01 HEADQUARTERS AN
0001 AR HHC 01 HEADQUARTERS AN
1 1 AD AWCF SSF
BLDG 23020 REDBALL EXPRESS
FORT BLISS TX 79918-0000
910-570-7402 FOB: Destination
W90QZQ
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 22-APR-2024 TO
01-MAY-2024
N/A 0001 AR HHC 01 HEADQUARTERS AN
0001 AR HHC 01 HEADQUARTERS AN
1 1 AD AWCF SSF
BLDG 23020 REDBALL EXPRESS
FORT BLISS TX 79918-0000
910-570-7402 FOB: Destination
W90QZQ
The following have been modified:
PERFORMANCE WORK STATEMENT
Sign Removal and Install for 1st Armored Brigade Combat Team and 1st Armored Division
Sustainment Brigade
04 / APRIL / 2024
PART 1 GENERAL INFORMATION
1. GENERAL: This is a non-personal service contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to install signage as defined in this PWS except for those items specified as government furnished property (GFP) and government furnished services (GFS). The Contractor shall perform to the standards in this contract.
1.2 Background:
1st Armored division is conducting Iron Posture, which involves units moving to new areas on the Fort Bliss, TX installation. 1st Armored Brigade Combat Team and 1st Armored Division Sustainment Brigade have swapped footprints in support of Iron Posture. The exchange of unit footprints requires the removal of old signage and the installation of new signage.
1.3 Objectives: The Contractor shall create new signage and install signage to buildings 20100 and 21200. And remove one sign on BLDG 21200.
1.4 Scope:
1.4.1 For the front of Building 21200 Bayonet Ave, the Contractor shall create A. For the front A (north) of the BLDG fifty-three (53) 6mm black aluminum composite material cut letters size 12” (1ST ARMORED DIVISION, DIVISION SUSTAINMENT BRIGADE MULESKINNERS) it will be broken down in 3 rows see attachment for reference. Two MULESKINNERS Logo (2) 6mm black aluminum composite material with printed vinyl design Size: 3ft X 3ft will be on each end of the writing.
B. For the Front D (north below front A) contractor will remove old muleskinner logo and replace it with seventeen (17) black aluminum composite material cut letters size 12” (MULESKINNER STRONG!) fit into one row.
C. For the Front C (north left of front A) contractor will make seventeen (17) 6mm black aluminum composite material cut letters size 18” (MULESKINNER STRONG!) fit into one row. Two MULESKINNERS Logo (2) 6mm black aluminum composite material with printed vinyl design Size: 4ft X 4ft will be on each end of the writing.
D. For the Front B (north right of front A) the contractor shall create of fifty-three (53) 6mm black aluminum composite material cut letters size 12” (1ST ARMORED DIVISION, DIVISION SUSTAINMENT BRIGADE MULESKINNERS) it will be broken down in 3 rows see attachment for reference. Above the wording four unit crest 6mm black aluminum composite material with printed vinyl design size:
2ft X 2ft, Order of Crest from left to right 1. Atlas logo, 2. 22nd Chem, 3. Legion, and 4. 407th ASFBN. See picture for reference. On the ends of the writing will be Two MULESKINNERS Logo (2) 6mm black aluminum composite material with printed vinyl design Size: 4ft X 4ft.
E. For the rear (south), the Contractor shall create of seventeen (17) 6mm black aluminum composite material cut letters size 12” (MULESKINNERS STRONG!)
on one row. On the ends of the writing will be Two MULESKINNERS Logo (2) 6mm black aluminum composite material with printed vinyl design Size: 4ft X 4ft.
F. For the west side, the Contractor shall create of seventeen (12) 6mm black aluminum composite material cut letters size 18.” (MULESKINNERS!). On the ends of the writing will be Two MULESKINNERS Logo (2) 6mm black aluminum composite material with printed vinyl design Size: 4ft X 4ft. Below the wording four unit crest 6mm black aluminum composite material with printed vinyl design size: 3ft X 3ft, Order of Crest from left to right 1. Atlas logo, 2. 22nd Chem, 3.
Legion, and 4. 407th ASFBN. See picture for reference.
A. 1.4.2 For LOCATION: FRONT OF BUILDING 20100 EAGLE WAY (orientation purposes only)Twenty-one (21) letters Letter size 12” with Gemini 1in thick black material as seen in the attachment photos (READY FIRST, ALWAYS WIN!) in one row, (BE ALL YOU CAN BE!) in the second-row underneath it.
B. Twenty-seven (27) Letter size 12” 6mm black aluminum composite material (1st ARMORED BRIGADE COMBAT TEAM) to fit all in one row.
C. Create seven (7) individual Unit Crest Insignias (fit all in one row underneath 1st ARMORED BRIGADE COMBAT TEAM) 6mm black aluminum composite material with printed vinyl design Size: 2ft x 2ft
D. For LOCATION: BACK OF BUILDING 20100 EAGLE WAY (FACES KASSERINE WAY) (orientation purposes only), the Contractor shall create twenty-one (21) letter size 36” 6mm black aluminum composite material (READY
FIRST, ALWAYS WIN!)
E. For LOCATION: LEFT SIDE OF BUILDING 20100 EAGLE WAY & READY FIRST ST (orientation purposes only)the Contractor shall create twenty-one (21) letter size 36” 6mm black aluminum composite material (READY FIRST, ALWAYS WIN!)
F. For LOCATION: RIGHT SIDE OF BUILDING 20100 EAGLE WAY & CSM COOKE ST (orientation purposes only) the Contractor shall create twenty-one
(21) letter size 36” 6mm black aluminum composite material (READY FIRST, ALWAYS WIN!)
1.5 Period of Performance: The period of performance shall be for ten (10) days, including weekends and holidays.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): The Contractor shall develop, implement, and maintain a QCP and program to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers high-quality service. The Contractor’s QCP is how the Contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract.
1.6.1.1 The Contractor shall develop and implement procedures to identify, prevent, and ensure non- recurrence of defective services. The QCP shall be submitted within thirty (30) days of contract award. After acceptance of the QCP, the Contractor shall receive the Contracting Officer’s (KO) acceptance in writing of proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation.
1.6.1.2 The Quality Control Plan shall address as a minimum:
1.6.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the way inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS. This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions.
The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work, including inspection and testing.
1.6.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.6.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.2 Operations Security (OPSEC) SOP/Plan Requirements: The Contractor shall implement and maintain an OPSEC program for preventing the disclosure of critical information or sensitive information which could jeopardize the Government’s ability to execute its mission or to adequately protect its personnel and/or equipment. The Contractor shall develop an OPSEC Standing Operating Procedure (SOP)/plan within 90 calendar days of contract award to the Contracting Officer Representative (COR) or Contracting Officer (KO) to be reviewed and approved by the Government OPSEC Officer on the supporting installation. The SOP must contain a training plan that includes an initial OPSEC brief, continuous awareness, and annual OPSEC training.
Awareness/training includes, but not limited to information disclosure via letters, conversations, photographs, resumes, electronic mail (e-mail), social media/networking sites, dissemination of information and documents disposal.
OPSEC Program shall fully comply with the provisions of AR 530-1, Operations Security.
1.6.2 Quality Assurance (QA): The Government shall evaluate the Contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met.
Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the Contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Ch ristmas Day Juneteenth
1.6.4 Hours of Operation: The Contractor is responsible for conducting business between the hours of 0800 to 1700 Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, always, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Fort Bliss, TX.
Building 21200 Bayonet Ave Fort Bliss, TX 79916 Building 20100 Eagle Way Fort Bliss, TX 79916
1.6.6 Type of Contract: The Government anticipates the award of a fixed price type contract. This is a fix price type contract.
1.6.7 Access and General Protection Policy and Procedures:
1.6.7.1 FPCON: In addition to the changes otherwise authorized by the changes of clause of contract, should the US Government Force Protection Condition (FPCON) at any individual installation change, the Government may require changes in contractor security matters or process in accordance with DoDI
2000.16. During FPCONs Charlie and Delta, only contract services that have been deemed “mission essential” by the Government will continue. Contract services will resume when the FPCON is reduced to Bravo or lower.
1.6.7.1.1 HPCON: The Contractor shall be responsible for adhering to the installation’s Health Protection Condition (HPCON) guidance regarding the COVID-19 precautionary measures.
1.6.7.4 Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the local back-ground check level in the Joint Personnel Adjudication System (JPAS) at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are IAW with the attached DD Form 254, “Department of Defense (DOD) Security Classification Specification”. The Contractor shall ensure that contractor employees and sub-contractor employees performing services under this contract comply with FAR 52.204-2, Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contract will ensure the employee complies with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M), and any revisions to DOD 5220.22-M, notice of which has been furnished to the Contractor.
1.6.7.4.1 The Contractor shall follow DOD Federal Acquisition Regulation Supplement (DFARS) clause 252.223-7004, Drug-free Work Force. The Contractor shall conduct drug tests, ensuring all top secret cleared contractor employees are tested at least once per year, each year of the contract, as well as when there is a reasonable suspicion that an employee uses illegal drugs. The drug testing shall be at the contractor’s expense. Positive drug test results shall be made available to both the KO and COR within 24 hours of known test results. Records of drug testing shall be made available to the COR.
1.6.7.5 Background Checks: The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
Full birth name Married name (if applicable) SSN or local equivalent (ID card number) Date of birth Place of birth (city, country)
1.6.7.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government.
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.7.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a contractor employee or employees from the performance of the contract.
1.6.7.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.7.6 Uncleared Contractor Common Access Card (CAC) Credentialing and
Access Procedures
1.6.7.6.1 Contractor Common Access Card (CAC) Eligible Requirements:
Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05.
The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely; (2) Remote access, via logon, to a DOD network using DOD-approved remote access procedures; or (3) Physical access to multiple DOD facilities or multiple non-DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
Contractor personnel shall return CAC to appropriate U.S. Government authorities within five (5) days of the end of their contractual duties.
1.6.7.6.1.1 Federal Installation/Facility Access: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.7.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.7 Access to Government Information Systems: All Contractor employees and subcontractor employees performing services under this contract who have access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully completed the DoD Information Assurance Awareness training prior to access to the information system and then annually thereafter.
1.6.7.8 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE:
All references to keys include key cards. Contractor shall not duplicate keys provided by the Government. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
1.6.7.8.1 The Contractor shall report any occurrences of lost or duplicate keys/key cards to the KO and the COR (and physical property manager, if applicable) within two (2) hours or the next business day if after hours’ time period may be changed to match local policies and guidance and to request key or lock(s) replacement. This notification and request for key(s) and lock replacement shall be submitted in writing. The total cost of the replacement may be at the Contractor’s expense.
1.6.7.8.2. Only authorized Contractor personnel shall use Government issued key(s) and/or key card(s). Contractor personnel shall follow security access requirements when entering secure areas. Contractor shall receive appropriate security clearance approval to allow visitor(s) access in secure areas.
1.6.7.9 Lock Combinations: Reserved
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the government.
1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following contractor personnel are considered key personnel by the Government: Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
Qualifications for all key personnel are listed below:
a) Contract Manager and Alternate Contract Manager: “Contract
Manager and Alternate Contract Manager: The CV provided by the
Contract Manager and Alternate Contract Manager must demonstrate successful completion of 24 semester hours in mathematical, engineering, and quantitative analysis courses; 15 or more years cost analysis experience; and familiarity with Defense Department Data Sources (e.g. cost and software data reporting, Earned Value Management (EVM), etc.…” or “…must demonstrate a minimum of 5 years’ experience within the past 10, working as a Program Manager...” The Contract Manager and Alternate Contract Manager shall be able read and write at English Language Fluency level [1, 2, 3, 4, 5]. (See attachment 5 for a Clarification.
1.6.11.1 IA/IT Training Certification: All Contractor employees and subcontractor employees supporting IA/IT functions must be certified upon contract award as directed in DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2. Baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.6.12 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious.
Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc. Government badges are not required for the personnel that will perform the job.
1.6.12.1 Badging of Contractor Employees: If required by the
Government, contract personnel and all associated subcontractors’ employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public. Contractor personnel shall return all U.S.
Government issued identification to appropriate U.S. Government authorities within five (5) days of the end of their contractual duties.
1.6.12.2 Uniform: The Contractor shall provide a standard uniform for all Contractor and subcontractor employees performing services under this contract, and ensure they wear the uniform during appointed duty hours. The uniform may consist of the same type and color shirt and slacks for all workers. Company logo is optional.
1.6.13 Contractor Travel: Reserved
1.6.14 Other Direct Costs (ODC): Reserved
1.6.15 Data Rights: Reserved
1.6.16. Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.6.16.1 Non-Disclosure Statements: Reserved
1.6.16.2 Advertisement and social media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html).
The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.6.16.3 INFORMATION ASSURANCE: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.6.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.18 Phase-in/Phase-Out (PIPO) Period: Reserved
1.6.19 General Training Requirements:
1.6.19.1 Anti-Terrorism (AT) Level I Training: The Contractor shall complete AT Level I Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel, all Contractor employees, including subcontractor employees, who are employed under the contract shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR or KO within ten (10) calendar days after completion of training by all employees and subcontractor personnel. For Common Access Card (CAC) holders, AT Level I awareness training is available at https://jkodirect.jten.mil, course number “JS-US007-14”. For non- CAC holders, AT Level I awareness training is available at http://jko.jten.mil/courses/atl1/launch.html (this standalone version is intended for non-CAC users without a JKO account only). Training must have been completed within the last 12 months and maintained yearly thereafter. If training cannot be conducted on the website, the Contractor will coordinate with the local AT Officer at their assigned location for classroom training by a Level 2 trained AT Officer and a copy of either the training certificate or the training attendance roster signed by the AT Officer will be maintained by the Contractor. Verification of the training will be provided to the COR or KO within ten (10) calendar days after completion of the training.
1.6.19.2 OPSEC Awareness: If the Contractor, or a subcontractor, or employees of either disclose any information that disrupts or harms the
Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.6.19.3 Information Assurance (IA) Training: Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DOD IA Cyber Awareness Training. All employees working information technology (IT)/IA functions must comply with DOD and Army training requirements per DOD Directive (DODD) 8570.01, Information Assurance Training Certification and Workforce Management, DOD 8570.01- M, Information Assurance Workforce Improvement Program, and AR 25-2, Information Assurance, within 30 days of employment. Training is available at https://ia.signal.army.mil/DODIAA/default.asp.
1.6.19.4 Information Assurance (IA)/Information Technology (IT) Training:
All Contractor employees and subcontractor employees requiring access to Government information systems must complete the DoD IA awareness training before issuance of network access and annually thereafter. All employees working IA/IT functions must comply with DoD and Army training requirements in Per DoD 8570.01, DOD 8570.01-M, and AR 25-2, within 30 days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp.
1.6.19.5 Threat Awareness Reporting Program (TARP Training): Within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel, all Contractor employees, including subcontractor employees, who are employed under the contract and require a security clearance, shall complete TARP training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within ten (10) calendar days after completion of training by all employees and subcontractor personnel. TARP training is available at the Army Learning Management System (ALMS) https://www.lms.army.mil/.
Training must have been completed within the last 12 months and maintained yearly thereafter. If training cannot be conducted on the website, the Contractor will coordinate with the local Counterintelligence (CI) Officer at their assigned location for classroom training and a copy of either the training certificate or the training attendance roster signed by the CI Officer will be maintained by the Contractor. Verification of the training will be provided to the Contracting Officer (KO) or Contracting Officer Representative (COR) within ten
(10) calendar days after completion of the training.
1.6.19.6 iWATCH Training: The Contractor will ensure that all Contractor employees and sub-contractor employees performing services under this contract have been briefed on the iWATCH Program, or equivalent for their supporting DoD Agency, within 30 days of employment under the contract.
The Contractor will coordinate with the supporting DoD Agency AT Officer through the COR or KO for the briefing. This training will be updated as required by the supporting installation AT policies. A copy of the training attendance will be maintained by the Contractor and made available to the COR or KO upon request.
1.6.19.7 OPSEC Training: All Contractor employees and sub-Contractor employees performing services under this contract will complete Level I OPSEC training within 30 calendar days of employment under this contract.
OPSEC Level I training is available at https://jkodirect.jten.mil, course number “EUC-ECJ6- 110-N-LB”. Training must have been completed within the last 12 months and maintained yearly thereafter. If training cannot be conducted on the website, the Contractor will coordinate with the local OPSEC Officer at their assigned location for classroom training by a Level 2 trained OPSEC Officer and a copy of either the training certificate or the training attendance roster signed by the OPSEC Officer will be maintained by the Contractor. Verification of the training will be provided to the COR or KO upon request.
PART 2 DEFINITIONS &
ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor. The total contractor organization or a separate entity of it, such as an affiliate, division, or plant that performs its own purchasing.
2.1.2. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.3. Contracting Officer’s Representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Performance Work Statement (PWS). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.8. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.10. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
2.1.11. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.12. Shall. An imperative command: has a duty to or is required to. Denotes that a regulation must be followed unless the contracting officer has obtained a deviation.
2.1.13. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.14. Workday. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.15. Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ALMS Army Learning Management System ANSI American National Standards Institute AOR Area of Responsibility AR Army Regulation ATCTS Army Training Certification Tracking System AT Anti-Terrorism CAC Common Access Card CFR Code of Federal Regulations CI Counterintelligence CLIN Contract Line-Item Number CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative DD Form 254 Department of Defense Contract Security Requirement List DOD Department of Defense DODD Department of Defense Directive DODI Department of Defense Instruction FAR Federal Acquisition Regulation FHP Force Health Protection FCG Foreign Clearance Guide FY Fiscal Year GFE Government Furnished Equipment GFP Government Furnished Property IA Information Assurance IAW In Accordance With IT Information Technology JPAS Joint Personnel Adjudication System JTR Joint Travel Regulation KO Contracting Officer LOA Letter of Authorization NCIC-III National Crime Information Center Interstate Identification Index NIST National Institute of Standards and Technology ODC Other Direct Costs OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OSHA Occupational Safety and Health Administration OPSEC Operation Security
PIPO Phase In/Phase Out PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QCP Quality Control Program RA Requiring Activity SCR Service Contract Reporting SOP Standard Operating Procedures SPOT Synchronized Pre-deployment and Operational Tracker TE Technical Exhibit TSDB Terrorist Screening Data Base U.S.C. United States Code
PART 3
GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 Government Furnished Property
3.1.1 The Contractor shall submit their Property Management System (PMS) procedures at least thirty (30) days after award for the buildings signage. The PMS shall contain the intricate details of the inner workings of the contractor’s Property Management System and how it will meet the ten (10) established outcomes (i.e., Acquisition, Receipt (includes Identification), Records, Physical Inventory, Subcontractor Control, Reports, Relief of Stewardship Responsibility/Liability, Utilization (includes Consumption, Movement, and Storage), Maintenance and Property Close-Out (includes Disposition). This written document is known as the Contractor’s Property Management System procedures. These procedures are used by the contractor’s operational personnel as their daily standard operating procedure (SOP) for the management of Government Property. The Contractor’s Property Management System procedures are working document(s) that may require updates as processes change; however, a contractor cannot change its procedures unilaterally. Proposed changes to the contractor’s processes shall be submitted to the Property Administrator for review/concurrence prior to the implementation of the changes.
3.1.2 A joint inventory of Government-furnished property must be completed within the timeline outlined in the Government approved transition plan. Items of equipment missing or not in working order shall be recorded and the COR shall be notified in writing. The Contractor and the Government representative shall jointly determine the working order and condition of all equipment and document their findings. Rejection of GFP by the Contractor shall not relieve the Contractor of responsibility in performance of this contract but will relieve the Government from the obligation of providing the same or similar GFP at a future date. The Contractor shall not use property provided by the Government for any purpose other than the performance of this contract. The Contractor shall conduct 100% inventories of Government property at a minimum, annually, IAW Contractor’s approved property management procedures and provide results IAW the DFARS PGI 245.103-72 format.
3.1.2.1 Final Inventory. At the completion of the contract, the Contractor and Government representative(s), shall conduct a joint inventory.
3.1.3 The Contractor shall not mark, affix any decals, emblems or signs portraying the contractor's name on Government property. The Contractor shall not remove GFP from the Installation or other supported areas without written approval of the KO.
3.1.4 The Contractor shall track and maintain warranty…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .