This document contains Questions and Answers related to a Request for Information (RFI) for the roof repair of Building 11147 under Solicitation W911SG24B0017. The RFI covers various aspects of the project, including requests for as-built drawings, details on the roof deck type and slope requirements, HVAC unit requirements, and information on fall protection and safety guardrails. The contract opportunity is for a Firm-Fixed Price contract to remove the existing built-up gravel roof and replace it with a new 80 mil TPO roofing system with R-38 insulation and glass-mat roof board. The project is expected to have a period of performance of 90 calendar days after the notice to proceed and is being procured under the HUBZone set-aside with a NAICS code of 238160 (Roofing Contractors) and a size standard of $19M. The contract value is estimated between $250,000 to $500,000. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI QUESTIONS AND ANSWERS

W911SG24B0017

Roof Repair Bldg. 11147

1.) Requesting as-built drawings for this project.

ANSWER: no updated as-builts drawings available.

2.) The anchor points amount, and location are not clear. Can you please advise?

ANSWER: Anchor points and spec should meet the OSHA standards

3.) What is the deck type?

ANSWER: Concrete deck

4.) Is the slope on the deck or do we need to create the slope with tapered insulation? If so, what is the minimum slope?

ANSWER: Tapered insulation, and the minimum slope is ½”. 12 to achieve positive drainage

5.) The existing air conditioning units are sitting on a metal frame. Do we change the frame to an actual roof curb?

ANSWER: The A/C is sitting on the curbs.

6.) Do we need to add tax rate to the price?

ANSWER: No

7.) Are there elevations available for this project?

ANSWER: No. the contractor must verify dimension and high on field.

8.) Are there photos available for this project?

ANSWER: No, it needs Public Affairs (PA) permit to disclose pictures of this building.

9.) Is building 1 story, 2 story, etc.?

ANSWER: 1-story building.

10.) Photos and size of soffit?

ANSWER: No, it needs Public Affairs (PA) permit to disclose pictures of this building.

11.) Required remediation company for the base?

ANSWER: unknown. The asbestos survey is required.

12.) Are there any roof drains?

ANSWER: No, the building does not have roof drains

13.) Temp HVAC – Available to connect to building or per room?

ANSWER: Building is vacant

14.) Will crane be required to remove HVAC units?

ANSWER: the contactor’s decision. It is means and methods of the contractor

15.) Safety Guardrail is there a model number, what was supplied is a document number?

ANSWER: this is only for fall protection system during construction.

16.) Safety Guardrail location? Entire perimeter?

ANSWER: this is only for fall protection system during construction.

17.) Fall protection post, model number?

ANSWER: Anchor points and spec should meet the OSHA standards

18.) Fall protection post locations?

ANSWER: Anchor points and spec should meet the OSHA standards