Abstract of Offerors OF_1419 W911SG24B0016 2OF3.pdf
PDF 566 KB Posted
- Attached to
- Roof Repair Bldg. 11144
- Solicitation number
- W911SG24B0016
About this file
This document is an Abstract of Offers for a construction solicitation. The solicitation is for roof repair on Building 11144, which includes the removal of the existing built-up gravel roof and replacement with a new fully adhered 80 mil TPO roofing system with R-38 insulation and 5/8 inch glass-mat roof board, as well as related exterior components. The solicitation number is W911SG24B0016 and the project is titled "Roof Repair Bldg. 11144". The procurement will be set aside for Historically Underutilized Business Zone (HUBZone) firms. The anticipated period of performance is 90 calendar days after notice to proceed. The North American Industry Classification System (NAICS) code is 238160, Roofing Contractors, with a size standard of $19M. The project magnitude is between $250,000 to $500,000. The Abstract of Offers shows four offerors and their bid amounts, with the lowest bid being $158,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET
1. SOLICITATION NUMBER
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)
2. PROJECT TITLE
NO.:
NO.:
NO.:
NO.:
A. OFFEROR
A. OFFEROR
A. OFFEROR
A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
C. AMENDMENTS ACKNOWLEDGED
A. ITEM NO.
B. ESTIMATED QUANTITY
C. UNIT
D. UNIT PRICE
E. ESTIMATED AMOUNT
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
E. ESTIMATED AMOUNT
D. UNIT PRICE
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable
OPTIONAL FORM 1419A (11-88)
8.2.1.3144.1.471865.466429
| 1. SOLICITATION NUMBER: W911SG24B0016 |
| 2. PROJECT TITLE: Roof Repair Bldg. 11144 |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): BID BOND/20% |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): BID BOND/20% |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): BID BOND/20% |
| 4B. OFFERS (Continued) BID SECURITY (Type and amount): BID BOND/20% |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 0 |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 0 |
| 4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.: 0 |
| 4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: 0 |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13: |
| 3B. ESTIMATED QUANTITY: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13: |
| 4E. OFFERS (Continued) ESTIMATED.: |
| 4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.: |
| 3C. CONTRACT ITEMS. UNIT: |
| 3B. ESTIMATED QUANTITY: |
| 3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: |
| 3B. ESTIMATED QUANTITY: 1.00000000 |
| 3C. CONTRACT ITEMS. UNIT: JOB |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 586537.39000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 586537.39000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 158000.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 158000.00000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 423811.46000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 423811.46000000 |
| 4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13: 486528.00000000 |
| 4E. OFFERS (Continued) ESTIMATED.: 486528.00000000 |
| PAGE OF: 2.00000000 |
| PAGES: 3.00000000 |
| Offeror number. Column 1 of 4.: 3 |
| Offeror number. Column 2 of 4.: 4 |
| Offeror number. Column 3 of 4.: 5 |
| Offeror number. Column 4 of 4.: 6 |
| A. OFFEROR: West Coast Contractors |
| A. OFFEROR: C Ortiz Corp., DBA The Roof and Metal Co. |
| A. OFFEROR: J. Carrizal General Construction, Inc. |
| A. OFFEROR: Globe Builders |
File details come from the government source that posted it. Updated .