This document appears to be a set of construction drawings and related documentation for the roof replacement project at Building 20187 at Fort Bliss, Texas.

The key details are:

  • The existing TPO roofing system is to be completely removed and replaced with a new 80 mil adhered TPO roofing system with R-38 insulation over a 5/8-inch glass-mat roof board.
  • The project requires 500 SF of roof deck replacement due to corrosion, and removal/replacement of damaged nailers, soffits, and fascia.
  • New roof penetration flashing, curbs, drains, and accessories are to be installed per manufacturer requirements to obtain a 30-year roof warranty.
  • The project has a Construction & Demolition Diversion requirement of 60% of materials and debris to be recycled.
  • The solicitation number is W911SG24B0014, issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D P

W

FO

R T

B

LI

SS

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text

FORT BLISS, TEXAS

AutoCAD SHX Text

INDEX OF DRAWINGS

AutoCAD SHX Text

NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

CONCURRENCES

AutoCAD SHX Text

USING AGENCY

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

ENVIRONMENTAL DIVISION

AutoCAD SHX Text

PHYSICAL SECURITY OFFICER

AutoCAD SHX Text

ANTI-TERRORISM/FORCE PROTECTION

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

SIGNATURES INDICATE THAT THOSE SIGNING HAVE REVIEWED PROJECT

AutoCAD SHX Text

PLANS AND SPECIFICATIONS AND ARE IN CONCURRENCE WITH THEM.

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SAFETY OFFICER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NEC

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MASTER PLANNING DIVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OPERATIONS & MAINTENANCE DIVISION

AutoCAD SHX Text

INDUSTRIAL HYGIENE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHIEF, ENGINEERING SERVICES DIVISION, DPW

AutoCAD SHX Text

CHIEF, DESIGN BRANCH, ESD, DPW

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

PROJECT LOCATION MAP

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text 1 = COVER SHEET 2 = SITE PLAN 3 = OVERALL ROOF KEY PLAN 4 = DEMOLITION PLAN - SECTION #1 5 = DEMOLITION PLAN - SECTION #2 6 = DEMOLITION PLAN - SECTION #3 7 = NEW WORK PLAN - SECTION #1 8 = NEW WORK PLAN - SECTION #2 9 = NEW WORK PLAN - SECTION #3 10= OVERALL ELEVATIONS 11= DETAILS 12= DETAILS (CONTINUED) 13= DETAILS (CONTINUED) 14= PROJECT INFORMATION SIGNAGE DETAIL

AutoCAD SHX Text

CVRSHT

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

LOOP 375

AutoCAD SHX Text

SPUR 601

AutoCAD SHX Text

MINUE DR.

AutoCAD SHX Text

BLACKHAWK TANK TRAIL

AutoCAD SHX Text

BLDG. 20187

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

GENERAL NOTES (EXISTING CONDITIONS)

AutoCAD SHX Text

LAY-DOWN AREA NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-100

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

SCALE: 1"=100'

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

BLDG. 20187

AutoCAD SHX Text

LAY-DOWN AREA

AutoCAD SHX Text

CONSTRUCTION LIMITS

AutoCAD SHX Text

MINUE DR.

AutoCAD SHX Text

1. LAY-DOWN AREA SHALL BE DESIGNATED PRIOR TO THE LAY-DOWN AREA SHALL BE DESIGNATED PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH DPW MASTER PLANNING. 2. THE CONTRACTOR SHALL RESTORE ANY ACCESS ROADS AND THE CONTRACTOR SHALL RESTORE ANY ACCESS ROADS AND LAY-DOWN AREAS USED BACK TO THEIR ORIGINAL STABILIZED CONDITION OR BETTER. 3. CONTRACTOR SHALL PROVIDE AND INSTALL ALL EQUIPMENT CONTRACTOR SHALL PROVIDE AND INSTALL ALL EQUIPMENT AND SUPPLIES REQUIRED TO SECURE THE TEMPORARY STORAGE AREA.

AutoCAD SHX Text

UTILITY NOTES

AutoCAD SHX Text

1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, WHETHER INDICATED ON THE DRAWING OR NOT, TO VERIFY THE LOCATION, DEPTH, AND CONDITION OF ALL EXITING UTILITIES AND SUBSTRUCTURES AND PROTECT THEM FROM ANY DAMAGE. 2. THE CONTRACTOR SHALL CONTACT ALL THE UTILITY COMPANIES AND CONDUCT ALL NECESSARY FIELD INVESTIGATIONS PRIOR TO ANY EXCAVATION. ANY DAMAGE TO EXISTING UTILITIES SHALL BE PROMPTLY REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO GOVERNMENT. 3. NOTIFY THE DPW REPRESENTATIVE IN WRITING AT LEAST 14 NOTIFY THE DPW REPRESENTATIVE IN WRITING AT LEAST 14 DAYS BEFORE ANY UTILITY OUTAGE OR ROAD CLOSURE.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text CONSTRUCTION LIMITS - CONSTRUCTION AREA TO USE DEMARCATION POINTS SUCH AS FENCING, CURBS, ETC., WHEREVER FEASIBLE UNLESS OTHERWISE NOTED.

AutoCAD SHX Text

REMOVE EXISTING ROOF SYSTEM

AutoCAD SHX Text LAY DOWN YARD TO BE SUBMITTED BY CONTRACTOR AND APPROVED BY COR & MASTER PLANNING

AutoCAD SHX Text

LOOP 375

AutoCAD SHX Text

BLACKHAWK TANK TRAIL

1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 2. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS (DRAWINGS AND SPECIFICATIONS) ON SITE AT ALL TIMES AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 3. CONTRACTOR SHALL UTILIZE STATEMENT OF WORK, CONTRACTOR SHALL UTILIZE STATEMENT OF WORK, SPECIFICATIONS, DRAWINGS AND CONTRACT TO ENSURE ALL CONSTRUCTION, DELIVERABLES, AND RESOURCES ARE DELIVERED TO THE GOVERNMENT. 4. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD IMMEDIATELY VIA RFI, TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 5. PRIOR TO ANY CHANGE OR MODIFICATION TO THE DRAWINGS PRIOR TO ANY CHANGE OR MODIFICATION TO THE DRAWINGS DUE TO ACTUAL CONDITIONS, DPW REPRESENTATIVE SHALL BE NOTIFIED FOR REVIEW AND APPROVAL. 6. CONTRACTOR SHALL MAINTAIN AND CLEAN CONSTRUCTION AREA CONTRACTOR SHALL MAINTAIN AND CLEAN CONSTRUCTION AREA IN ACCORDANCE WITH THE CONTRACT AND SAFETY RECOMMENDATIONS. 7. PRIOR TO CONSTRUCTION START, CONTRACTOR SHALL PRIOR TO CONSTRUCTION START, CONTRACTOR SHALL CONDUCT A THOROUGH PHOTOGRAPHIC SURVEY OF THE SITE. CRACKED SIDEWALKS, BROKEN WINDOWS, BENT EQUIPMENT, ETC. THIS INCLUDES INVENTORY OF ALL ITEMS ON SITE AND THEIR CONDITION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RESPONSIBILITY TO REPAIR. 8. BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. PROVIDE TEMPORARY COOLING/HEATING UNITS IF NECESSARY, DURING PERIODS AC AND HEATER ARE DOWN. 9. CONTRACTOR SHALL PROVIDE BUILDING ACCESS TO USER. CONTRACTOR SHALL PROVIDE BUILDING ACCESS TO USER. 10. CONTRACTOR SHALL PROVIDE AND FURNISH TRAFFIC CONTROL CONTRACTOR SHALL PROVIDE AND FURNISH TRAFFIC CONTROL FOR AREA ADJACENT TO CONSTRUCTION AREA. CONTRACTOR SHALL PROVIDE ALL REQUIRED TRAFFIC CONTROL PLANS. ALL SIGNS, BARRICADES, CHANNELIZATION DEVICES, SIGN FRAMES AND ERECTION OF SUCH DEVICES SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL TRAFFIC CONTROL AUTHORITY. 11. CONTRACTOR SHALL PROVIDE VEHICULAR ACCESS TO PARKING CONTRACTOR SHALL PROVIDE VEHICULAR ACCESS TO PARKING SPACES. 12. NO OBSTRUCTIONS WILL BE PERMITTED WITHIN THREE FEET OF NO OBSTRUCTIONS WILL BE PERMITTED WITHIN THREE FEET OF FIRE HYDRANTS. 13. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO EXISTING ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 14. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION WASTE AND DEMOLITION MATERIALS AND DEBRIS BE RECYCLED. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION FOR APPROVAL. 15. CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS AND FINISHES THAT ARE TO REMAIN. ANY DAMAGES SHALL BE REPLACED OR RESTORED WITHOUT ADDITIONAL COST TO THE GOVERNMENT. 16. ANY DEMOLITION DEBRIS SUSPECTED TO CONTAIN HAZARDOUS ANY DEMOLITION DEBRIS SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONTINUING ANY ADDITIONAL WORK. 17. ALL REMOVED EQUIPMENT SHALL BE REINSTALLED AND TESTED ALL REMOVED EQUIPMENT SHALL BE REINSTALLED AND TESTED IN THE PRESENCE OF A CONTRACTING OFFICER REPRESENTATIVE. 18. EXISTING SITE IMPROVEMENTS DAMAGED BY THE CONTRACTOR EXISTING SITE IMPROVEMENTS DAMAGED BY THE CONTRACTOR SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 19. ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE ALL SURFACES IN CONTACT WITH NEW WORK THAT ARE DAMAGED DUE TO NEW WORK IN PROGRESS, SHALL BE PATCHED AND REPAIRED AS REQUIRED. 20. ALL WORK SHALL COMPLY WITH ALL MANUFACTURER'S ALL WORK SHALL COMPLY WITH ALL MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL REGULATIONS/CODES.

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

OVERALL ROOF KEY PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

AutoCAD SHX Text

OVERALL ROOF KEY PLAN

AutoCAD SHX Text

SCALE: 1"=20'

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

GUARD HOUSE

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

SECTION #2

AutoCAD SHX Text 1 A-103

AutoCAD SHX Text 1 A-106

AutoCAD SHX Text

SECTION #1

AutoCAD SHX Text 1 A-102

AutoCAD SHX Text 1 A-105

AutoCAD SHX Text

SECTION #3

AutoCAD SHX Text 1 A-104

AutoCAD SHX Text 1 A-107

AutoCAD SHX Text

SECTION #3

AutoCAD SHX Text 1 A-104

1 A-107

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #1

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #1

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING ROOF SYSTEM

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING EXHAUST FAN

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

ROOF DRAIN (TYP.)

AutoCAD SHX Text

OVERFLOW DRAIN (TYP.)

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

GUARD HOUSE

AutoCAD SHX Text

MATCH LINE SEE 1/A-103

AutoCAD SHX Text

MATCH LINE SEE 1/A-104

AutoCAD SHX Text

MATCH LINE SEE 2/A-104

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

ANTENNA FARM STRUCTURE

AutoCAD SHX Text

METAL LADDER (TYP.)

AutoCAD SHX Text

ROOF SCUPPER (TYP.)

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text 1 EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF BOARD OVER ROOF INSULATION OVER METAL DECK AND STEEL ROOF JOISTS. DEMOLISH ROOF SYSTEM COMPLETELY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOFING SYSTEM. CONTRACTOR TO INCLUDE 500 SF ROOF DECK REPLACEMENT IN BID, REFERENCE DEMOLITION GENERAL NOTE #15. CONTRACTOR TO INCLUDE THE COST OF ROOF CORES TO DETERMINE THE EXISTING SYSTEM COMPOSITION AND THICKNESS. 2 EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO ALLOW FOR THE REMOVAL OF ALL ROOF CURBS/STANDS TO ALLOW FOR NEW TPO ROOFING SYSTEM. PREPARE FOR NEW ROOF CURBS AND FLASHING. CONTRACTOR TO PROVIDE TEMPORARY HEATING AND COOLING DURING CONSTRUCTION. 3 REMOVE ALL FLASHING AT ALL ROOF PIPE REMOVE ALL FLASHING AT ALL ROOF PIPE PENETRATIONS INCLUDING CONDENSATE DRAIN LINES AT HVAC UNITS AND PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL PIPE PENETRATIONS INCLUDING PIPING TO ALLOW FOR NEW TPO ROOFING SYSTEM. 4 EXISTING MEZZANINE, REMOVE ALL FLASHING AT EXISTING MEZZANINE, REMOVE ALL FLASHING AT STRUCTURAL POSTS, TIGHTEN ALL ANCHORS AND PREPARE FOR NEW ROOF. 5 REMOVE ALL FLASHING AT ALL ROOF VENTS, REMOVE ALL FLASHING AT ALL ROOF VENTS, PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL VENT PENETRATIONS TO ALLOW FOR NEW TPO ROOFING SYSTEM. 6 REMOVE ALL FLASHING AT ALL EXISTING EXHAUST REMOVE ALL FLASHING AT ALL EXISTING EXHAUST FANS. 7 REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW DRAINS AND PREPARE FOR NEW DRAINS. 8 REMOVE EXISTING METAL COPING AT PERIMETER OF REMOVE EXISTING METAL COPING AT PERIMETER OF BUILDING INCLUDING HIGH ROOFS, FLASHING AND ASSOCIATED WOOD NAILERS. 9 REMOVE EXISTING METAL SCUPPERS AND PREPARE REMOVE EXISTING METAL SCUPPERS AND PREPARE FOR NEW METAL SCUPPERS AT HIGH ROOFS. 10 EXISTING BUILDING EXPANSION JOINT. CONTRACTOR EXISTING BUILDING EXPANSION JOINT. CONTRACTOR TO NOTIFY COR OF ANY ISSUES AT THE EXPANSION JOINT ONCE EXISTING ROOFING SYSTEM IS REMOVED. 11 REMOVE EXISTING GUTTER AND ASSOCIATED WOOD REMOVE EXISTING GUTTER AND ASSOCIATED WOOD NAILER. 12 REMOVE EXISTING TRANSLUCENT PANELS AND ALL REMOVE EXISTING TRANSLUCENT PANELS AND ALL ASSOCIATED COMPONENTS. PREPARE FOR NEW TRANSLUCENT PANELS. SEE SHEET A-108 FOR LOCATIONS. 13 ALL EXISTING ANTENNA ARE TO BE PROTECTED ALL EXISTING ANTENNA ARE TO BE PROTECTED DURING CONSTRUCTION. REMOVE IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 14 EXISTING LIGHTING PROTECTION AND ASSOCIATED EXISTING LIGHTING PROTECTION AND ASSOCIATED WIRE AND STRAPS SHOULD BE REMOVED IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALLED ONCE CONSTRUCTION IS COMPLETE. 15 CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR AND PAINT. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND VALIDATE SF REPAIR WITH COR.

TYP.

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #2

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-103

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #2

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING ROOF SYSTEM

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING EXHAUST FAN

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

GUARD HOUSE

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

ROOF DRAIN (TYP.)

AutoCAD SHX Text

OVERFLOW DRAIN (TYP.)

AutoCAD SHX Text

MATCH LINE SEE 1/A-102

AutoCAD SHX Text

MATCH LINE SEE 1/A-104

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

ROOF SCUPPER (TYP.)

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text 1 EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF BOARD OVER ROOF INSULATION OVER METAL DECK AND STEEL ROOF JOISTS. DEMOLISH ROOF SYSTEM COMPLETELY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOFING SYSTEM. CONTRACTOR TO INCLUDE 500 SF ROOF DECK REPLACEMENT IN BID, REFERENCE DEMOLITION GENERAL NOTE #15. CONTRACTOR TO INCLUDE THE COST OF ROOF CORES TO DETERMINE THE EXISTING SYSTEM COMPOSITION AND THICKNESS. 2 EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO ALLOW FOR THE REMOVAL OF ALL ROOF CURBS/STANDS TO ALLOW FOR NEW TPO ROOFING SYSTEM. PREPARE FOR NEW ROOF CURBS AND FLASHING. CONTRACTOR TO PROVIDE TEMPORARY HEATING AND COOLING DURING CONSTRUCTION. 3 REMOVE ALL FLASHING AT ALL ROOF PIPE REMOVE ALL FLASHING AT ALL ROOF PIPE PENETRATIONS INCLUDING CONDENSATE DRAIN LINES AT HVAC UNITS AND PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL PIPE PENETRATIONS INCLUDING PIPING TO ALLOW FOR NEW TPO ROOFING SYSTEM. 4 EXISTING MEZZANINE, REMOVE ALL FLASHING AT EXISTING MEZZANINE, REMOVE ALL FLASHING AT STRUCTURAL POSTS, TIGHTEN ALL ANCHORS AND PREPARE FOR NEW ROOF. 5 REMOVE ALL FLASHING AT ALL ROOF VENTS, REMOVE ALL FLASHING AT ALL ROOF VENTS, PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL VENT PENETRATIONS TO ALLOW FOR NEW TPO ROOFING SYSTEM. 6 REMOVE ALL FLASHING AT ALL EXISTING EXHAUST REMOVE ALL FLASHING AT ALL EXISTING EXHAUST FANS. 7 REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW DRAINS AND PREPARE FOR NEW DRAINS. 8 REMOVE EXISTING METAL COPING AT PERIMETER OF REMOVE EXISTING METAL COPING AT PERIMETER OF BUILDING INCLUDING HIGH ROOFS, FLASHING AND ASSOCIATED WOOD NAILERS. 9 REMOVE EXISTING METAL SCUPPERS AND PREPARE REMOVE EXISTING METAL SCUPPERS AND PREPARE FOR NEW METAL SCUPPERS AT HIGH ROOFS. 10 EXISTING BUILDING EXPANSION JOINT. CONTRACTOR EXISTING BUILDING EXPANSION JOINT. CONTRACTOR TO NOTIFY COR OF ANY ISSUES AT THE EXPANSION JOINT ONCE EXISTING ROOFING SYSTEM IS REMOVED. 11 REMOVE EXISTING GUTTER AND ASSOCIATED WOOD REMOVE EXISTING GUTTER AND ASSOCIATED WOOD NAILER. 12 REMOVE EXISTING TRANSLUCENT PANELS AND ALL REMOVE EXISTING TRANSLUCENT PANELS AND ALL ASSOCIATED COMPONENTS. PREPARE FOR NEW TRANSLUCENT PANELS. SEE SHEET A-108 FOR LOCATIONS. 13 ALL EXISTING ANTENNA ARE TO BE PROTECTED ALL EXISTING ANTENNA ARE TO BE PROTECTED DURING CONSTRUCTION. REMOVE IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 14 EXISTING LIGHTING PROTECTION AND ASSOCIATED EXISTING LIGHTING PROTECTION AND ASSOCIATED WIRE AND STRAPS SHOULD BE REMOVED IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALLED ONCE CONSTRUCTION IS COMPLETE. 15 CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR AND PAINT. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND VALIDATE SF REPAIR WITH COR.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

W

FO

R T

B

LI

SS

N N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #3

AutoCAD SHX Text

DEMOLITION GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-104

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #3

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITIES BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS THE DEMOLITION PLAN INDICATES THE GENERAL SCOPE OF ITEMS AND EXISTING CONSTRUCTION ELEMENTS TO BE REMOVED. ANY ADDITIONAL ITEMS ENCOUNTERED IN THESE GENERAL DEMOLITION AREAS, WHICH WILL INTERFERE WITH THE NEW CONSTRUCTION SHALL ALSO BE REMOVED AT NOT ADDITIONAL COST. 5. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 6. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 7. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 8. CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO CONTRACTOR SHALL PROTECT ALL GOVERNMENT PROPERTY TO INCLUDE CARS, EQUIPMENT AND BUILDING SYSTEMS. 9. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING EQUIPMENT, MATERIALS, AND FINISHES THAT ARE TO REMAIN AND WITHOUT UNNECESSARY DAMAGE. ITEMS AND MATERIAL TO BE REMOVED SHALL BE DONE IN SUCH A MANNER AS TO PREVENT DAMAGES TO ITEMS AND MATERIALS THAT REMAIN. SUCH DAMAGES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE DPW REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT. ITEMS INCLUDE BUT ARE NOT LIMITED TO BROKEN CURBS, CRACKED SIDEWALKS, ETC. 10. THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE CONTRACTOR SHALL OVERSEE CLEANING AND ENSURE THAT THE PREMISES ARE MAINTAINED RUBBISH FREE DURING DEMOLITION WORK. FINAL CLEANUP IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 12. THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR THE GOVERNMENT RESERVES THE FIRST RIGHT OF REFUSAL FOR ALL DEMOLITION ITEMS. THOSE DEMOLITION ITEMS THE GOVERNMENT DOES NOT WISH TO KEEP SHALL BECOME PROPERTY OF THE CONTRACTOR FOR PROPER DISPOSAL. 13. ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN ANY ITEMS SCHEDULED FOR DEMOLITION SUSPECTED TO CONTAIN HAZARDOUS MATERIALS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE COR PRIOR TO DEMOLITION. 14. CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO CONTRACTOR TO VALIDATE/VERIFY LEAD OR ASBESTOS MATERIAL TO BE REMOVED/ABATED. CONTRACTOR SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS APPLICABLE TO LEAD AND ASBESTOS ABATEMENT AS INDICATED IN SURVEYS AND TESTED. 15. CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK CONTRACTOR SHALL IDENTIFY AREAS OF ROOF WHERE ROOF DECK OR STRUCTURAL REPAIRS ARE NEEDED FOR GOVERNMENT CONSIDERATION. UNLESS NOTED OTHERWISE, CONTRACTOR WILL BID ON AN ESTIMATED 500 SF OF ROOF DECK AREA TO BE REPLACED DUE TO CORROSION AND PROVIDE FULL REPLACEMENT TO INCLUDE STEEL ANGLE REINFORCEMENT SUPPORT AS NEEDED. 16. REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA REMOVE AND REPLACE ALL DAMAGED NAILERS, SOFFIT, AND FASCIA BOARDING TO MATCH EXISTING MATERIALS. 17. CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO CONTRACTOR TO LIFT ALL MECHANICAL EQUIPMENT IN PLACE TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 18. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO ELECTRICAL CONDUIT, GAS LINES, WIRES, ETC., AS REQUIRED TO ALLOW FOR CONSTRUCTION. 19. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF. PRIME WITH ONE COAT AND PROVIDE TWO COATS OF SAFETY YELLOW PAINT. 20. ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE ANY ABANDONED PENETRATIONS SHALL BE REMOVED AND THE DECK REPAIRED PRIOR TO INSTALLATION OF THE NEW ROOF SYSTEM. SECURE ALL SLEEVES AND PIPES BEFORE ROOF MATERIAL IS REMOVED. 21. CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED CONTRACTOR WILL FIELD VERIFY BEFORE MOVING ANY ABANDONED PENETRATIONS. 22. ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE ALL EQUIPMENT TO BE REMOVED SHALL BE DONE SO IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE AND INSTALLED AND TESTED IN THE PRESENCE OF A GOVERNMENT REPRESENTATIVE. 23. CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A CONSTRUCTION & DEMOLITION DIVERSION: FORT BLISS REQUIRES A MINIMUM OF 60% OF CONSTRUCTION AND DEMOLITION MATERIALS AND DEBRIS FROM LANDFILLS. IF THE CONTRACTOR HAS A VALID REASON FOR NOT BEING ABLE TO MEET THIS DIVERSION GOAL, THE CONTRACTOR NEEDS TO PRESENT THEIR REASONING IN WRITING TO DPW-ENVIRONMENTAL DIVISION. 24. THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO THE CONTRACTOR SHALL NOT EMPLOY FORT BLISS TRASH BINS TO DISPOSE OF CONSTRUCTION MATERIALS. 25. BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.BURNING ON FORT BLISS PROPERTY IS NOT PERMITTED.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING ROOF SYSTEM

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING EXHAUST FAN

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

GUARD HOUSE

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

ROOF DRAIN (TYP.)

AutoCAD SHX Text

OVERFLOW DRAIN (TYP.)

AutoCAD SHX Text

ROOF SCUPPER (TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLAN - SECTION #3

AutoCAD SHX Text

SCALE: 1/16"=1'-0"

AutoCAD SHX Text

MATCH LINE SEE 1/A-102

AutoCAD SHX Text

MATCH LINE SEE 1/A-103

AutoCAD SHX Text

MATCH LINE SEE 1/A-102

AutoCAD SHX Text

ROOF DRAIN (TYP.)

AutoCAD SHX Text

OVERFLOW DRAIN (TYP.)

AutoCAD SHX Text

ROOF SCUPPER (TYP.)

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text 1 EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF EXISTING TPO ROOFING SYSTEM OVER GYPSUM ROOF BOARD OVER ROOF INSULATION OVER METAL DECK AND STEEL ROOF JOISTS. DEMOLISH ROOF SYSTEM COMPLETELY DOWN TO STRUCTURAL DECK. CLEAN AND PREPARE SURFACE FOR NEW ROOFING SYSTEM. CONTRACTOR TO INCLUDE 500 SF ROOF DECK REPLACEMENT IN BID, REFERENCE DEMOLITION GENERAL NOTE #15. CONTRACTOR TO INCLUDE THE COST OF ROOF CORES TO DETERMINE THE EXISTING SYSTEM COMPOSITION AND THICKNESS. 2 EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO EXISTING HVAC UNIT, REMOVE AND PROTECT UNIT TO ALLOW FOR THE REMOVAL OF ALL ROOF CURBS/STANDS TO ALLOW FOR NEW TPO ROOFING SYSTEM. PREPARE FOR NEW ROOF CURBS AND FLASHING. CONTRACTOR TO PROVIDE TEMPORARY HEATING AND COOLING DURING CONSTRUCTION. 3 REMOVE ALL FLASHING AT ALL ROOF PIPE REMOVE ALL FLASHING AT ALL ROOF PIPE PENETRATIONS INCLUDING CONDENSATE DRAIN LINES AT HVAC UNITS AND PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL PIPE PENETRATIONS INCLUDING PIPING TO ALLOW FOR NEW TPO ROOFING SYSTEM. 4 EXISTING MEZZANINE, REMOVE ALL FLASHING AT EXISTING MEZZANINE, REMOVE ALL FLASHING AT STRUCTURAL POSTS, TIGHTEN ALL ANCHORS AND PREPARE FOR NEW ROOF. 5 REMOVE ALL FLASHING AT ALL ROOF VENTS, REMOVE ALL FLASHING AT ALL ROOF VENTS, PREPARE FOR NEW FLASHING. CONTRACTOR TO RAISE ALL VENT PENETRATIONS TO ALLOW FOR NEW TPO ROOFING SYSTEM. 6 REMOVE ALL FLASHING AT ALL EXISTING EXHAUST REMOVE ALL FLASHING AT ALL EXISTING EXHAUST FANS. 7 REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW REMOVE ALL EXISTING ROOF DRAIN AND OVERFLOW DRAINS AND PREPARE FOR NEW DRAINS. 8 REMOVE EXISTING METAL COPING AT PERIMETER OF REMOVE EXISTING METAL COPING AT PERIMETER OF BUILDING INCLUDING HIGH ROOFS, FLASHING AND ASSOCIATED WOOD NAILERS. 9 REMOVE EXISTING METAL SCUPPERS AND PREPARE REMOVE EXISTING METAL SCUPPERS AND PREPARE FOR NEW METAL SCUPPERS AT HIGH ROOFS. 10 EXISTING BUILDING EXPANSION JOINT. CONTRACTOR EXISTING BUILDING EXPANSION JOINT. CONTRACTOR TO NOTIFY COR OF ANY ISSUES AT THE EXPANSION JOINT ONCE EXISTING ROOFING SYSTEM IS REMOVED. 11 REMOVE EXISTING GUTTER AND ASSOCIATED WOOD REMOVE EXISTING GUTTER AND ASSOCIATED WOOD NAILER. 12 REMOVE EXISTING TRANSLUCENT PANELS AND ALL REMOVE EXISTING TRANSLUCENT PANELS AND ALL ASSOCIATED COMPONENTS. PREPARE FOR NEW TRANSLUCENT PANELS. SEE SHEET A-108 FOR LOCATIONS. 13 ALL EXISTING ANTENNA ARE TO BE PROTECTED ALL EXISTING ANTENNA ARE TO BE PROTECTED DURING CONSTRUCTION. REMOVE IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALL ONCE CONSTRUCTION IS COMPLETE. 14 EXISTING LIGHTING PROTECTION AND ASSOCIATED EXISTING LIGHTING PROTECTION AND ASSOCIATED WIRE AND STRAPS SHOULD BE REMOVED IF NECESSARY TO ALLOW FOR CONSTRUCTION AND REINSTALLED ONCE CONSTRUCTION IS COMPLETE. 15 CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR CONTRACTOR TO ASSUME 25 SF OF STUCCO REPAIR AND PAINT. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND VALIDATE SF REPAIR WITH COR.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

W

FO

R T

B

LI

SS

N

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

SPEC. #

AutoCAD SHX Text W.O. #

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

MARK

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

DIRECTORATE OF PUBLIC WORKS FORT BLISS, TEXAS

AutoCAD SHX Text

NEW WORK PLAN - SECTION #1

AutoCAD SHX Text

NEW WORK GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text A-105

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text 01/22/2024

AutoCAD SHX Text

FE-10004-2J

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text M.A.A.

AutoCAD SHX Text C.V.R.

AutoCAD SHX Text

BUILDING 20187 ROOF REPLACEMENT PROJECT

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

NEW TPO ROOF SYSTEM

AutoCAD SHX Text

EXISTING PIPE PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING ELECTRICAL PENETRATIONS

AutoCAD SHX Text

EXISTING EXHAUST FAN

AutoCAD SHX Text

1. THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT THESE PLANS ARE FOR REFERENCE ONLY AND MAY NOT REFLECT ALL AVAILABLE INFORMATION, THE EXACT LOCATION AND QUANTITY OF EXISTING DUCTWORK, PENETRATIONS AND EQUIPMENT MAY DEVIATE FROM LOCATIONS AND QUANTITY SHOWN ON DRAWINGS. CONTRACTOR MUST FIELD VERIFY AND EXAMINE EXISTING STRUCTURES, NOTE ALL CONDITIONS AS TO CHARACTER AND EXTENT OF ALL WORK INVOLVED, VALIDATE AND BID ACCORDINGLY. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, ALL CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, ALL DIMENSIONS, EXACT LOCATIONS AND QUANTITY BEFORE COMMENCING WORK. 3. GENERAL CONTRACTOR SHALL ASSURE THAT ALL GENERAL CONTRACTOR SHALL ASSURE THAT ALL SUB-CONTRACTORS HAVE REVIEWED THE ENTIRE SET OF CONSTRUCTION DOCUMENTS, THIS INCLUDES BUT NOT LIMITED TO CONSTRUCTION DRAWINGS, PROJECT MANUAL (SPECIFICATIONS), AMENDMENTS, MODIFICATIONS, AND CHANGE ORDERS. THE CONTRACT IS BASED ON CONSTRUCTION DOCUMENTS AS A WHOLE AND COORDINATION BETWEEN SUBCONTRACTOR IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 4. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS ON SITE AND INDICATE CHANGES AS THE PROJECT PROGRESSES. 5. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER'S FIELD REPRESENTATIVE IMMEDIATELY OF ANY CONFLICTS DISCOVERED IN THE FIELD VIA RFI, ASAP TO ALLOW SUFFICIENT TIME TO REVIEW AND RESOLVE THE ISSUE. 6. CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONTRACTOR SHALL ENSURE SAFE ACCESS TO BUILDING DURING CONSTRUCTION AND SHALL PROVIDE ALL REQUIRED BARRICADES, FENCING, COVERED WALKS, PLANKING, LIGHTING, BRACING, SHORING, WARNING SIGNS, ETC. AS REQUIRED BY OSHA AND FORT BLISS REGULATIONS FOR THE PROTECTION OF WORKMEN, STAFF AND USERS. 7. ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S ALL WORK SHALL COMPLY WITH THE MANUFACTURER'S SPECIFICATIONS/RECOMMENDATIONS, FEDERAL, STATE, AND LOCAL CODES. 8. NO NEW MATERIALS SHALL CONTAIN ASBESTOS, LEAD, OR ANY NO NEW MATERIALS SHALL CONTAIN ASBESTOS, LEAD, OR ANY REGULATED MATERIALS. 9. PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TP0) ROOF SYSTEM OR PROVIDE NEW THERMOPLASTIC POLYOLEFIN (TP0) ROOF SYSTEM OR APPROVED EQUAL. 80 MIL, ADHERED, WITH R-38 INSULATION. THE INSTALLATION OF TAPERED INSULATION, AS SHED RAINWATER, THE FALL SHOULD BE PREFERABLE 1:40 WITH THE MINIMUM 270 MM THICK. USE THE FOUR-WAY INSULATION METHOD TO DRAIN THE ROOF. PROVIDE FULLY LINED AND INSULATED CURBS ON THE ROOF HATCHES, THE HEIGHT OF THE CURB SHALL BE SELECTED TO PROVIDE 12 INCH MINIMUM CURBING ABOVE THE SURFACE OF THE ROOF. 10. ALL ROOF PENETRATION AND FLASHING WORK SHALL BE THE ALL ROOF PENETRATION AND FLASHING WORK SHALL BE THE RESPONSIBILITY OF ROOFING CONTRACTOR USING MANUFACTURER'S STANDARD DETAILS AND SHALL BE COVERED AS PART OF THE MANUFACTURER'S WARRANTY. CONTRACTOR WILL PROVIDE ALL NEW ACCESSORIES, PIPE SUPPORTS, PIPE BOOTS, CANT STRIPS, ETC. SUPPORTS SHALL NOT PENETRATE THE NEW ROOF SYSTEM. 11. ALL SHEET METAL INCLUDING COPING, GUTTERS, FLASHING, TRIM, ALL SHEET METAL INCLUDING COPING, GUTTERS, FLASHING, TRIM, LEADER BOXES AND LEADERS ARE TO BE SUPPLIED BY METAL ROOFING MANUFACTURER AND INSTALLED ACCORDING TO MANUFACTURERS INSTRUCTIONS. ALL GAUGES OF SHEET METAL SHALL BE ACCORDING TO MANUFACTURERS RECOMMENDATIONS. 12. ALL ROOF AND WALL PANEL TERMINATIONS, COPING, EDGE METAL, ALL ROOF AND WALL PANEL TERMINATIONS, COPING, EDGE METAL, SHALL MEET ES-1 STANDARDS. 13. SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES SECURE AND SAFEGUARD EXISTING AND\OR NEW GAS LINES EXPOSED ON THE ROOF.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .