W911SG24B0012 Bldg 11332 Questions and answers.docx
DOCX document 16 KB Posted
- Attached to
- Replace Roof Building 11332 at Fort Bliss Texas.
- Solicitation number
- W911SG24B0012
About this file
This document contains questions and answers related to a federal contract opportunity for the roof replacement of Building 11332 at Fort Bliss, Texas. The key details are:
The contract opportunity is for a roof replacement project on Building 11332 at Fort Bliss, Texas. This is a competitive set-aside for HUBZone small businesses under NAICS code 238160, with an estimated project value between $500,000 and $1,000,000. A site visit is scheduled for July 24, 2024 and bids are due by August 9, 2024. The resulting contract will be a Firm-Fixed-Price (FFP) contract. The contracting agency is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. The questions and answers cover details such as roof construction, insulation requirements, drawing availability, and bid submittal requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SG-24-B-0012
Roof Replacement Bdlg. 11332 Fort Bliss, TX.
1. Can we perform a core test to know the thickness of the roof?
No, it is not possible.
2. Is the tapered insulation for the roof field to be sloped at ½” or ¼”?
Yes, tapered insulation is required. The minimum slope is ½:12 to achieve positive drainage
3. Will the new tapered insulation be required to be an Average of R-38 or Minimum R-38?
Minimum tapered insulation shall be R-30
4. Can any As-builts or information be provided to show existing roof system?
There is not updated as-builts.
5. What is the existing structural deck for this building?
lightweight concrete over metal deck
6. Is the slope on the deck or do we need to create the slope with tapered insulation? If so, what is the minimum slope Question replied in question 2
7. Can you please provide the as-built drawings Questions replied in question 4
8. Do we add the tax rate to the proposal package?
MICC will check with legal.
9. Do we need to provide a price for asbestos and lead testing?
Yes, the line item should be only for survey testings.
10. Can we perform a core test to know the thickness of the roof?
Question replied in question 1.
File details come from the government source that posted it. Updated .