This document contains the questions and answers related to the solicitation W911SG-24-B-0011 to replace the roof on Building 20360 at Fort Bliss, Texas. The solicitation is for a firm-fixed-price construction contract with a performance and payment bond requirement. The contract is a 100% competitive set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 238160, with an estimated magnitude between $1-5 million. A site visit is scheduled for July 24, 2024 and bids are due by August 9, 2024. Key details include: the requirement for a 30-year manufacturer warranty on the replacement roof, the need for tapered insulation to achieve the minimum slope, and the requirement for the lightning protection system to be certified by an electrical contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SG-24-B-0011
Replace Roof Building 20360 Fort Bliss, TX Below are the RFI questions and answers for the solicitation mentioned above. Please not that these questions and answers are presented exactly as received.
1. Are we required to include asbestos remediation in our bid or only the test?
Only include Asbestos survey.
2. Scope of work states R-38 but plans show R-30, which one do we bid?
It should read R-30
3. Do you have any idea of the current roof design, how much insulation, etc. ?
No. it would requires cores and DPW does not have cores.
4. Is there another way to send the bid besides using a CD?
No, the only method to submit the bids are listed under the instruction to bidders.
5. What type of replacement roof curbs will be accepted? - only fully lined and insulated are called for only for roof hatches. Shall all others also be?
The roof requires a 30 years manufacturer warranty. The minimum high for curbs is 8” above the finish roof.
Are the new curbs actually “rail curbs” (2 per unit) under the units? If so, are they to be attached to the deck coming up past the new roof level +12”. A rail curb supporting a unit is shown beside the pipe support on sheet detail # 9 on A104 No new rail curbs, only the already current rails curbs on the roof.
Does the lightning protection cable system need to be certified by the electrical contractor?
Yes, the lighting protection system should be test before to turnover the building back to the government.
The anchor points amount, and location are not clear. Can you please advise?
The anchor point shall be in the center as possible and following OSHA standard for roof anchors. Anchors are spaced every 20' – 30' on center.
Is the slope on the deck or do we need to create the slope with tapered insulation? If so, what is the minimum slope?
Tapered insolation is required, the minimum slope is ½.
Can you please provide the as-built drawings?
There is not updated as-built of the roof.