SOLICITATION AMENDMENT W911SG21B0012 0001.pdf
PDF 366 KB Posted
- Attached to
- Roof Repairs Group 1 Bldg. 124, 126, and 143
- Solicitation number
- W911SG21B0012
About this file
This document provides details for a construction solicitation to re-roof three buildings at White Sands Missile Range in New Mexico. The solicitation will result in a firm-fixed price contract awarded to a service-disabled veteran-owned small business for a period of 200 calendar days. The Mission and Installation Contracting Command at Fort Bliss, Texas, on behalf of the United States Army Directorate of Public Works at White Sands Missile Range, is seeking offers to furnish all labor, materials, equipment, tools, transportation, performance and payment bonds, and supplies necessary to complete roof repairs and replacement at Buildings 124, 126, and 143. The work includes re-roofing and ensuring positive drainage slopes at the three buildings. The estimated value of the procurement is between $500,000 and $1 million under North American Industry Classification System code 238160 for roofing contractors.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011640911
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is:
1. Incorporate the RFI questions and answ ers.
All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG21B0012
X 9B. DATED (SEE ITEM 11)
13-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Sep-2021
CODE
MICC - FORT BLISS
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SG21B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
RFI QUESTIONS AND ANSWERS
RFI QUESTIONS AND ANSWERS
W911SG21B0012
Roof Group 1 Buildings 124, 126 and 143
1. The solicitation states the work is to be done simultaneously. Does this mean each building require a separate superintendent or are they close enough that one will suffice?
Answer: Building 124 & Building 126 are next to each other and therefore the Government will allow a minimum of 2 superintendents for this requirement.
2. There is no Lightning Protection system in place now, do we have to install one?
Answer: The Contractor is not required to install LPS on buildings that currently have no LPS. No LPS are required for buildings 124, 126 and 143.
3. Wage determination doesn't have roofers, do you have any historical data for wages and are you guys walking the bid winner through the process of getting the pay scale for that trade?
Answer: The solicitation includes AAM 213 which explains the process on how to determine a wage rate for a roofer based on the current wage determination provided.
Once the contract is awarded the winning bidder will submit a conformance request (SF1444) to the Contracting Officer. While the Government has no previous historical data on a conformance request. The Department of Labor has previously provided the following wage rate for a roofer under an SF308:
Classification Hourly Rate Fringe Benefit Roofer $24.08 $10.79
4. Tapered insulation is listed on the general notes but only under building 124, are we installing tapered insulation on all buildings?
Answer: Notes for all three buildings state the following, “Contractor shall ensure the roof has positive drainage slope of at least ¼” per foot and correct all areas that have the potential for ponding water. ”
5. Do we need aluminum fascia removed as the aluminum drip edge where is present?
Answer: Only in areas where it is required to install the new roof system under flashing.
(End of Summary of Changes)