Copy of W911SG20R0039 Questions and Responses 6.26.20_dpw.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Ft. Bliss Sewer Repair
- Solicitation number
- W911SG20R0039
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SG20R0039 AMENDMENT 0003.pdf | ||
| W911SG20R0039 AMENDMENT 0002.pdf | ||
| W911SG20R0039 AMENDMENT.pdf | ||
| Elevation.pdf | ||
| Isometric.pdf | ||
| New-Work-Plan.pdf | ||
| W911SG20R0039 Released.pdf | ||
| Demo-Plan.pdf | ||
| SOW_01043_repair_sewer - QA review.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PAGE | Section | Para | QUESTIONS | RESPONSE | |
| The | Tile inside the bathroom is 1" which is special order but because COVAD 19 delivery might take longer than usual, would you consider the 4" instead/close match in color since it is a straight cut and will look like a design? | The 4" restroom tile will be acceptable. |
#2 The current manhole is old as well as the setup which could possibly disturb the set up since the pipe is already corroded and it could damage the manhole. Can a recommendation be made to tie the new pipe outside the manhole so that the existing penetration can be used? Tie in to sewer line before manhole is acceptable. Will need details on proposed tie-in and capping of the line prior to start of work.
#3 Are you going to require densities on the driveway (north end of building) if yes how many and percentage? 95% compaction. In a 100ft run, provide four (4) density readings. Or one (1) every 25ft.
#4 Are you going to require dowels on the concrete areas if so how far apart? Use the following as basis (for 10" thick concrete, 4000psi), adjust/propose for actual site conditions: 3/4" dia, 20" long dowels, with half in new/existing concrete (center), 15" on center
#5 SOW,
| page 23 | 1.3.3.3 | ||
| 5.12.1.13.2. | It states in the SOW to "Restore floor in front of men’s latrine with tile that is best-match existing hallway floor tile”; the hallway currently has carpet. Can you please clarify? | Correct, carpet is at men's restroom entrance. If a portion of the carpet needs to be removed and replaced, to match existing. |
| #6 | SOW, | |||
| page 8 | paragraph 1.12.10 | Can the Construction Project Manager also perform the duties of the Safety Manager and/or Quality Control manager or do we need to have on site the four key personnel (Construction Superintendent, Construction Project Manager, Construction Safety Manager, and Quality Control Manager?) | Superintendent is 100%. For purposes of this proposal, you may propose Safety/QC to be the same person, and PM a percentage at your discretion. NOTE: The base safety office representative at pre-construction meeting will decide if one person can be performing two positions such as safety and QC. |
#7 Can you please provide storage area dimensions? Not at this stage. You will need to propose the area you feel is needed for your laydown/storage in order to be approved by user/dpw once contract is awarded. Adjacent to project area and bldg is recommended, avoid staging area across streets.
| #8 | SOW 15; | ||
| SOW page 24 | 5.2.1 | ||
| 5.12.1.17.4 | SOW, page 15, paragraph 5.2.1 requires five (5) Portable Latrines and one Hand Wash Station; SOW page 24, paragraph 5.12.1.17.4 requires eight (8) portable Latrines. Please Clarify? | Use the highest requirement. |
#9 SOW page 15 and 17 5.3, 5.3.1, and 5.8.1,1 Does the Traffic Control Plan needs to be sealed/stamped by a Professional Engineer? The traffic control plan is ONLY required if you plan to restrict traffic to one lane or close the street completely, no stamp required. Is best if this can be avoided as this is a lengthy process and coordination between contractor, dpw, directorate of emergency services and garrisson commander is required.
#10 SOW page 17 5.8.1.1 Does a Storm Water Pollution Plan need to be prepared and stamp/Seal by a Professional Engineer? If not specifically requested to be stamped then not required.
| 11 | SOW, | |||
| page 16 | 5.5.1.1. | Does this contract require at least 60% of Solid Waste Diversion? | Yes, all contracts require to comply. Once contract is awarded, if unable to fulfill this requirement, you will need to contact DPW-Environmental and the COR with your valid reasons in writing and they will issue guidance. |
| 12 | SOW | |||
| page 17 | 5.8.1.1 | Is an Abatement Plan required in this project? Is there any asbestos or based lead paint removal/disposal? | No hazardous materials were identified in the SOW. |
| 13 | SOW, | |||
| page 23 | 5.12.1.8 | Does the new restored concrete slabs include reinforcing, and will the concrete be dowelled into the existing slabs? Reinforcing size and spacing? | Reinforcement to match existing in concrete slab. Dowels , same as #3 above. Propose at your discretion, or can assume no re-inforcements. If differering site conditions are encountered you may approach the contracting/dpw reps once construction has started. |
14 SOW, page 2 1.7 “Attachments: Please provide the following attachments:
A. Staging and Laydown Area attachment C. Contract Specifications F. Building Surveys (if Asbestos or Based Lead Paint abatement is involved in this project). A & C. None exist.
A. Yours to propose, coordination required before is approved and prior to start of work.
F. None provided, assume no abatement. Once construction starts if there is reasonable doubt and survey/abatement is required, coordination with contracting/dpw/environmental will be required prior to start of work.
| 15 | SOW, | |||
| page 20 | 5.8.1.1.1.12.1 | Procedure for submittals in accordance with SECTION 01 33 00 Submittal Procedures. Can you please provide specifications, section 01 33 00 Submittals Procedures? | No specifications provided. During the pre-construction meeting you will receive instructions by the DPW-Construction Branch for the submittal requirements and forms to be used . |
Installation Operations, Maintenance and Sustainment Questions and Reponses