MICC_WSMR_Bridge_Repairs_Route_7_Site_Visit_Pre-Bid_Conference_PowerPoint.pdf

PDF 1 MB Posted

Attached to
BRIDGE REPAIR ROUTE 7
Solicitation number
W911SG19B0009
Issued by

About this file

Pre Bid Conference PowerPoint

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agile – Proficient – Trusted

UNCLASSIFIED

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

Contracting for Soldiers

Ms. Natalia Lerma Contracting Officer

19 Aug 2019

919th Contracting Battalion Mission and Installation Contracting Command

Fort Bliss, Texas

White Sands Missile Range (WSMR) Bridge Repair Route 7

W911SG-19-B-0009

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Pre-Bid Conference Overview

• Welcome & Introductions

• Housekeeping Items

• Purpose

• General Information

• Acquisition Milestones

• Common Pitfalls

• Technical Overview

• Site Visit

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Welcome & Introductions

• Natalia Lerma

– Contracting Officer, Mission & Installation Contracting Command (MICC), Fort Bliss natalia.lerma.civ@mail.mil 915-568-3906

• Christopher Herrera

– Contract Specialist, MICC-Fort Bliss christopher.herrera1.civ@mail.mil 915-569-7659

• Vanessa Cuevas

– Project Manager, WSMR Directorate of Public Works (DPW)

• Gilbert Bustillos

– Design Engineer, WSMR DPW

• Christopher Hahn

– Contracting Officer Representative (COR), WSMR DPW

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Housekeeping Items

• NO pictures are allowed.

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Purpose

• To familiarize contractors with the Government’s requirement and the bidding instructions

– Tour a representation of the scope of work

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

General Information

• Natalia Lerma and Christopher Herrera are the ONLY points of contact for this requirement

• Any remarks, explanations, or answers to questions at this conference shall not qualify as terms of the solicitation

• Provisions, terms, and conditions of the solicitation shall remain unchanged unless they are formally amended in writing and issued by the Contracting Officer

• Questions during this conference/site visit must be submitted in writing to Christopher Herrera, christopher.herrera1.civ@mail.mil to be formally addressed

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

General Information

• All questions shall be submitted in writing no later than 26 August 2019 @ 1:00 PM MST to Mr. Herrera. Questions received after the due date will not receive a response.

• This requirement is advertised on FedBizOpps and has been set aside for Women Owned Small Businesses (WOSB).

System for Award Management (SAM) – must be active

– NAICS 237310 must be listed in the Bidders Reps & Certs

Firm Fixed Price

– Period of Performance: 120 days after notice to proceed

Magnitude of Construction

– Between $500,000.00 and $1,000,000.00

Contract shall be awarded to the responsive/responsible bidder considering only price.

• The information from today’s site visit will be made available as an attachment on FedBizOpps

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Tentative Acquisition Milestones

Description Date

Solicitation Posted 1 August 2019

Site Visit 19 August 2019

RFI’s Due 26 August 2019 @ 1:00 PM MST

Amendment 1 30 August 2019

Bid Opening 11 September @ 9:00 AMMST

Estimated Award 18 September 2019

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Common Pitfalls

• Don’t read the solicitation, Instructions to Bidders

• Don’t provide an OVERALL contract price

• The “Bid Date” on the bid bond guarantee is missing or incorrect

• The “Invitation Number” on the bid bond guarantee is missing or incorrect

• Don’t sign the SF1442 and acknowledge amendments on SF1442

• Don’t self-certify in WOSB Repository or don’t include third party certification

• Don’t include all Reps & Certs required

• Don’t include adequate past performance required

• Don’t include CD’s with bid

• Timeliness for bid delivery

– Hand Delivery: Day of bid opening between 8:00 AM MST and 9:00 AM MST

– Mail Delivery: Allow enough time

• Lack of responsiveness

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

DPW

• Technical Presentation – Fort Bliss Directorate of Public Works

Contracting for Soldiers UNCLASSIFIED

UNCLASSIFIED

UNCLASSIFIED

WSMR Bridge Repair Route 7 Pre-Bid Conference Site Visit

Questions

File details come from the government source that posted it.