DPW-As-built_requirements-Memo-3-29-16_(b).pdf

PDF 229 KB Posted

Attached to
New Sidewalk Construction Federal contract opportunity
Solicitation number
W911SG-18-R-0070
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Bliss

View the file

Other files for this federal contract opportunity

Other files attached to New Sidewalk Construction, newest first.
File Type Posted
Solicitation_Released.pdf PDF
DWG_-_New_Sidewalk_along_Chaffee.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 29, 2016

Lorenzo Molina (915)569-5520 Lorenzo.m.molina.civ@mail.mil

The following are the requirements for turning over as-built drawings to the Fort Bliss DPW Master Planning division.

1. 1 set of Autocad DWG files. (2CDs)

2. 1 set of PDF files. (2CDs)

3. 1 set of mylar hard copies.

4. The above must contain all the required disciplines for a complete and viable product, i.e. general, civil, architectural, landscaping, irrigation, plumbing, mechanical, electrical, fire and etc.

5. The drawings shall be stamped 'as-built' in the bottom right hand corner underneath the title block.

6. All modifications and RFI's shall be incorporated into the drawings and no drawings shall be marked up (or in other words "Red lined").

7. All external reference (XRef) files shall be included.

8. All external reference (XRef) files shall bound to make each drawing sheet.

9. Any maps including all civil drawings must be in a viable coordinate system. If the initial maps are received from Master Planning they will be in Texas State Plane Central FIPS 4203 NAD 1983 or GCS 1984 UTM 13N.

10. All drawings will have accurate dimensions.

11. All piping and ducting will have accurate sizes.

12. All underground utilities will have accurate depths listed.

13. All drawings sets shall be coherently organized not divided into fast track/non fast track or any other incomprehensible package.

14. All turning points, brass caps, survey points, etc will have their pertinent information listed on the drawings.

15 Internal engineering projects and PRIDE should follow these requirements also.