RFI’s For W911SG-18-R-0037

Q1. What are the dimensions (SF tile removal and replacement) of TAC Site 18?

A1. The flooring that needs to be installed is the All American Plank Flooring and the color is Anthem (774).

Q2. There are restrooms on some of the buildings, will the same material for flooring will be use in the restrooms?

A2. The same material being installed in the building will be used in the restrooms also.

Q1. There is cargo on some of the buildings, is the contractor responsible for moving this cargo?

A3. All cargo and furniture will be removed prior to contractors getting started on work.

Q4. There is no cove base on scope of work, is this required?

A4. It is not in the SOW