MOD_W911SG-18-R-0009-0001_Traffic_Signs_12_APR_2018.pdf

PDF 3 MB Posted

Attached to
Traffic Signs
Solicitation number
W911SG-18-R-0009
Issued by

About this file

W911SG-18-R-0009-0001 MODIFICATION

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SG-18-R-0009

0011100235

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to:

A. Extend due date from 18 April 2018 @ 9:00 AM MST to 26 April 2018 @ 9:00 AM MST;

B. Update Instructions to Offerors;

C. Update Statement of Work;

D. Update Schedule A & B;

E. Incorporate Questions & Answ ers; and F. Incorporate Pictures.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 54

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SG-18-R-0009

X 9B. DATED (SEE ITEM 11)

19-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Apr-2018

CODE

MICC -FT BLISS W911SG

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 18-Apr-2018 09:00 AM to 26-Apr-2018 09:00 AM.

The following have been modified:

INSTRUCTION TO OFFERORS

Instructions to Offerors

1. POINT OF CONTACT (POC):

Natalia Lerma, Contract Specialist Tel: 915-568-3906 Email: natalia.lerma.civ@mail.mil

2. COMPETITION REQUIREMENTS: This procurement is a Service-Disabled Veteran-Owned Small

Business (SDVOB) set-aside acquisition.

3. SITE VISIT: The Government has scheduled a one day site visit at White Sands Missile Range, NM at 09:00 MST on 28 March 2018.

a. We will meet at the parking lot of Bldg 102 located at Headquarters Ave and Springfield Street. There is a flag pole located in front of Building 100. Building 102 is just north of Building 100. Please arrive early enough to facilitate going through either access control point (El Paso or Las Cruces/Alamogordo Gate) to receive a vehicle pass. You will need to provide a driver’s license, vehicle registration and proof of insurance in order to receive a vehicle security pass (http://www.wsmr.army.mil/testcenter/Pages/WhereWeAre.aspx) The purpose of the site visit is to provide the contractor insight into the job requirements.

b. Firms who wish to attend the site visit shall provide the name(s), company name, position title, telephone number, email address and mailing address of all attendees via email to natalia.lerma.civ@mail.mil no later than 16:00 MST on 22 March 2018.

c. The site visit is limited to a maximum of two (2) attendees per company. Contractor representatives should be prepared to furnish identification if requested.

d. Individual or group questions will not be answered during the site visit. Potential offerors may submit written questions in accordance with number 4 (below) of this instructions to offerors section.

Note: Remarks and explanations made by the Government representatives during the course of the site visit, whether orally or in writing, shall not change or qualify any of the terms or conditions of this solicitation. The solicitation can only be changed by a formal, written amendment issued by the Contracting Officer (KO).

4. REQUEST FOR INFORMATION (RFI): All offeror inquiries or questions shall be submitted in writing electronically to Natalia Lerma at natalia.lerma.civ@mail.mil no later than 4 April 2016 at 16:00 MST. An amendment will then be issued with all questions and answers. **After the due date no additional RFI’s will be answered**

5. PROPOSAL DUE DATE: Proposals are due no later than 09:00 MST on 26 April 2018. Proposals shall be emailed to natalia.lerma.civ@mail.mil. Proposals SHALL include the following in order to be considered (failure to include all line items shall be cause for rejection of the offer):

a. Cover sheet on company letterhead with your DUNS number, CAGE code, Tax ID, and primary point of contact information;

b. Signed and completed Standard Form 1442 along with any amendments;

c. Detailed breakdown of proposal (template proposal breakdown to be provided as a separate attachment). Template provided shall be used as a basis for your proposal. Please note no lump sum and/or lots shall be provided. Proposal shall include a clear breakdown of all materials, equipment, labor. It is NOT the Government’s responsibility to request further breakdowns and the proposal will be deemed unresponsive if a clear breakdown is not provided;

d. Letter from bonding company;

e. Contractor approach and project schedule per Evaluation Factors; and

f. Past Performance per Evaluation Factors.

Please note that all correspondence via e-mail shall contain a subject line that reads, “WSMR Traffic Signs W911SG-18-R-0009, Company Name”. If sending attachments via e-mail, ensure only .pdf, .doc or .xls documents are sent. In the body of the email please ensure to list the number of attachments submitted. It is the Contractor’s responsibility to verify all emails along with all attachments are received by the Contract Specialist listed above.

6. BONDNG REQUIREMENTS:

a. Performance and Payment Bonds:

(1) The penal amount of the bonds shall be 100 percent of the awarded price.

(2) The Government may require additional bond protection when a contract price is increased.

The increase in protection shall generally equal 100 percent of the increase in contract price. The Government may secure additional protection by directing the contractor to increase the penal amount of the existing bond or obtain an additional bond.

b. Offer Guarantee:

(1)An Offer Guarantee is not required. Instead of submitting an Offer Guarantee, offerors are to submit a letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.

7. SYSTEM FOR AWARD MANAGEMENT (SAM): Offeror must be registered in the database IAW

FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in FAR 52.219-1(c), Small Business Program Representations (Alternate I), Representations.

SECTION 00700 - CONTRACT CLAUSES

The following have been deleted:

52.219-14 Limitations On Subcontracting JAN 2017

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

QUESTIONS & ANSWERS

Traffic Signs

Questions & Answers

Question Answer

1. I would like to request that we could have pictures of all three locations including the brackets that hold the signs together.

Photos will be provided after they have been vetted through security.

2. I would also like to confirm that there is no concrete or asphalt to replace on any of the locations

Project Engineer will make 100% sure that there is no concrete/asphalt that needs to be replaced. This information will be included as part of the updated

SOW.

3. Can metal poles be disposed of on-site (WSMR metal yard)?

Project Engineer has confirmed with in-house personnel and all metal signs and posts may be disposed of at the WSMR scrap metal yard. SOW to be updated.

4. If this is possible we would also like to know. I'm guessing the street signs themselves are made out of a fiberglass material, and need to be disposed of off of base? I wasn't sure if they were metal as well.

All signs to include posts are metal and may be disposed of at the WSMR scrap metal yard.

5. Street Name Signs – Height?

9”.

6. Street Name Signs – Length? To accommodate the letter size requested, will a longer, proper length sign blank be approved?

Yes.

7. Yield Signs – Size? The finished size after radius is 27.234”x24.1, will this finished size be considered acceptable?

Yes, this is considered a 30" x 30" x 30".

8. Street Names. Does WSMR want the street name abbreviated exactly as it is in the solicitation or should they be spelled out?

Spelled out.

9. Will all work be performed during the normal duty working hours?

10. The SOW at 11.4.1, Note 1, calls out Signs shall be 24" x 8" with upper-case letters at least 6". Fabricators are stating that lettering size with border might require larger blade per the MUTCD. Please confirm

Signs shall be 24" x 9".

Question Answer

11. Will the posts, square 1.75" x 1.75" x 12', 14 gauge, full punched galvanized steel be acceptable.

12. At pages 25-31 of 62, column (1) Intersections are identified with no street signs Column (2) with @, from, &, near, /, and, corner of. This is only for clarification of location?

On the schedule, column 1 indicates the location of the sign. In most cases, this is an intersection and may require street signs as indicated by column 2. However, some signs are not located at intersections (e.g., Picatinny @ Commissary Parking Lot) and column 1 indicates the location of a sign. The work required at these locations is identified in columns 2 thru 6 of the sign schedule.

If column #2 has a strike through, this means that there are no street name signs needed for this intersection.

The only reason I attached road intersection names (column #1) is for location only.

13. I was wondering if all the street name signs were going to be the same as far as color of letter and color of sign.

Please see Section 11.4.1, note 1 in the SOW.

14. Another thing I noticed is that there was no mentioning of the sleeves that the sign posts slip into. I looked on the schedule B and all it shows is the steel posts, I remember you saying that some locations will take a sleeve. If there are can I get a count of how many signs will need sleeves?

All new posts installed will need a breakaway sleeve.

15. In the solicitation for replacing the traffic signs I don’t see any mention off “break-away” signs, but the Submittal list (8.3.16) requests submittal of NCHP 350 Post Breakaways.

Yes, all sign posts will need breakaway sleeves.

16.Are the sign posts supposed to be breakaway?

All posts will need to have a 2" sleeve that the 1.75" posts ties into.

17. Just want to make sure that I am only require to provide a letter from my bonding company NOT a bid bond as part of our proposal.

Correct. A letter is only needed from the bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.

SITE PICTURES

The following have been modified:

SIGN SCHEDULES

SCHEDULE A

SCHEDULE B

STATEMENT OF WORK

SCOPE OF WORK

4/11/2018

Roadway Traffic Signs White Sands Missile Range, NM

Information contained in this document regarding commercial products or firms may not be used for advertising or promotional purposes and is not an endorsement of any product or firm by the Directorate of Public Works, White Sands Missile Range or the U.S. Army.

Table of Contents Part 1 – Project Description and Location

1.1 General Description of Work

1.2 Project Location

1.3 Contract Discrepancies

1.4 Period of Performance (POP)

1.5 Pre‐Construction Meeting

1.6 Progress Meetings

1.7 Temporary Utilities

Part 2 – Installation Access and Security

2.1 Installation access

2.2 Contractor’s Responsibilities

2.3 Removal of Personnel

2.4 Photography

2.5 Working Hours

2.6 Entry Restrictions/Roadblocks

Part 3 – Safety Compliance

3.1 Safety Compliance

3.2 Coordination With Sub‐Contractors

3.3 Site Specific Safety Plan

3.4 Internal Job Site Safety Inspections

3.5 Hazard Analysis

3.6 Accident Reporting Requirements

3.7 Safety Meetings

3.8 Display of Safety Information

3.9 Work in Confined Spaces

3.10 Safety Data Sheets for Hazardous Materials

3.11 Radiation Permits and Authorizations

Part 4 – Environmental Quality Program

4.1 Cleanup and Disposal of Waste Materials

4.2 Waste Hauler Requirements

4.3 Waste Disposal

4.4 Prohibitions

4.5 Air Pollution Prevention

4.6 Dust Control

4.7 Water Pollution Prevention

4.8 Sanitary Facilities

Part 5 – Contractor Quality Control

5.1 Contractor Daily Reports

5.2 Construction Phasing

5.3 Work Area Maintenance

5.4 Utilities Clearances and Outages

5.5 Emergency Suspension of Work

5.6 Government Witness

5.7 Documentation

Part 6 – Product Requirements

6.1 General Information

6.2 Delivery, Storage, and Handling

6.3 Installation

6.4 Product Data

Part 7 – Required Employee Training

7.1 Employee Training

Part 8 – Project Submittals

8.1 Submittals

8.2 Submittal Requirements

8.3 List of Submittals

8.4 Government Review of Submittals

8.5 Equipment Manuals

8.6 Shop Drawing/Product Data Manual

8.7 Operation and Maintenance Manual

8.8 Warranties

Part 9 – Construction Schedules

9.1 Construction Schedule

Part 10 – Hazardous Building Materials Abatement

10.1 GENERAL

Part 11‐Narrative of Specific Work Requirements

11.1 General Requirements

11.2 Hazardous Building Material Abatement

11.3 Architectural

11.4 Civil

11.5 Electrical

11.6 Mechanical

Part 12 – Construction Drawings (Separate Attachments)

12.1 GENERAL

Part 13‐Applicable Codes/Standards

Part 14‐Sections for Codes/Standards above

Part 1 – Project Description and Location

1.1 General Description of Work:

All work shall comply with State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations, and all contract special provisions, terms and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with FAR requirements. The intent of the contract is to provide for the construction and completion of the work described.

The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. The project consists of removing and replacing roadway name signage, traffic signs and incidental work at numerous locations around White Sands Missile Range (WSMR) as shown on the attached sign schedules A and B and this statement of work.

1.2 Project Location:

Work is located on White Sands Missile Range New Mexico. Project is within Dona Ana County as written within SOW and sign schedule(s) attached. There are numerous traffic signs, roadway sign names and posts throughout main cantonment that will be demoed and installed.

1.3 Contract Discrepancies:

Contractor shall become thoroughly familiar with the existing conditions, analyze the components, take the necessary equipment, and make any necessary calculations to achieve the project requested. The contractor shall notify the Contracting Officer Representative immediately of any errors, omissions, and other discrepancies in contract documents for all work covered in this Scope of Work.

1.4 Period of Performance (POP):

All work shall be completed within 120 days after the notice to proceed. The POP includes time required to process any coordination with any Government office or the COR on an as needed basis for example traffic control, dig permit coordination, utility outage requests, etc.

1.5 Pre‐Construction Meeting:

The contractor shall attend a pre‐construction meeting held by the government prior to construction.

Construction shall NOT begin until the Contracting Officer issues the Notice To Proceed (NTP) after or during the pre‐construction meeting. This meeting serves to answer any questions from the contractor and to discuss building issues such as storage, security, access, working hours, etc.

1.6 Progress Meetings:

The project coordinator and the superintendent from the contractor shall attend any progress meetings held by the government on a weekly or biweekly basis, or on dates determined by the government. This meeting is for the contractor to discuss their current progress, to discuss schedule, and to discuss and resolve any other project related issues.

1.7 Temporary Utilities:

If required to complete the requirements of this contract, temporary utilities may be available from the Government.

1.7.1 Water Service. The Contractor may use water from the Government's existing water system.

Metering of water usage shall be required. When connecting to the Government’s water system, including attaching water hoses to spigots, the contractor must install a back flow prevention device and water meter that is approved by WSMR Water Plant manager.

1.7.2 Electric Power Service. The Contractor may use electric power from the Government’s existing electrical system without metering or payment unless told otherwise. If payment is required, coordination with the DPW Energy Office shall be required to create a utilities sales agreement. The COR shall help coordinate meeting.

Part 2 – Installation Access and Security

2.1 Installation access:

Contractor and all associated sub‐contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractors requiring up‐range access shall comply with the requirements of White Sands Missile Range Policy Letter #39.The Government is not responsible for work delays or additional costs associated with and / or contractor’s failure to obtain clearances for their employees.

2.2 Contractor’s Responsibilities:

The contractor shall see that all employees carry their authorization to the site with them during working hours and show them upon request. The COR will periodically verify passes from the contractor employees with their personal identification. The contractor shall also see that all passes are originals and not copies or for terminated employees, and know when the contract expires.

2.3 Removal of Personnel:

The Government has the right to remove any Contractor employee at any time during the duration of the contract if that employee is deemed to not be of the level of competence or ability required under the contract, or if said employee fails to meet the Installation Security Requirements. In such case, the Contractor shall promptly submit the name and qualifications of a replacement.

2.4 Photography:

Under no circumstances shall the Contractor or any of their subcontractors take photographs of any type while on the installation. Failure to comply with this requirement will result in employee being barred from entering the installation. Photographs may be taken by the government COR and provided to the Contractor upon OPSEC review and approval.

2.5 Working Hours:

White Sands operates on a compressed work schedule with an off day every other Friday (RDO) and observes Federal Holidays. Normal working hours for the installation are from 07:00 AM to 4:30 PM. The Contracting Officer may authorize the Contractor to perform work outside of normal working hours and days. If the contractor desires to work during periods other than the days and hours listed above, a written request must be made to the Contracting Officer within 4 calendar days of their intention.

2.6 Entry Restrictions/Roadblocks:

Contractor and all associated sub‐contractors employees may be required to work in areas subject to entry restrictions, evacuations, and roadblocks. Roadblocks on public highways are normally set for a duration of at least one (1) hour. Internal roadblocks are normally set for a duration of at least two (2) Hours. However, on occasion the duration may be all day. Prime Contractor is responsible for scheduling operations to avoid unnecessary delays and missed services, or charges for the inability to perform due to these restrictions may be applied. Range and roadblock status may be obtained by calling 678‐1178 or 678‐2222. Roadblocks are subject to change without prior notification.

Part 3 – Safety Compliance

3.1 Safety Compliance:

Army construction contracts fall within the purview of the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385‐1‐1, and OSHA Title 29 Part 1910 and 1926. The version in effect at time of contract award will be used. OSHA 29 CFR 1910 Safety and Health Regulations as well as 29 CFR 1926 Safety and Health Regulations for Construction are available online at:

3.1.1 http://www.gpoaccess.gov/cfr/index.html or http://www.osha.gov/ .

3.1.2 EM‐385‐1‐1 is available online at:

http://www.hnd.usace.army.mil/safety/Safety_Pol_Reg_Docs.aspx

3.2 Coordination With Sub‐Contractors:

The prime contractor is the "controlling authority" for all work site safety and health of the subcontractors. The prime contractor shall be responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

3.3 Site Specific Safety Plan:

Construction contracts shall include a site and project specific safety plan. EM 385‐1‐1 refers to a safety plan as an Accident Prevention Plan (APP). The safety plan will be tailored to the project, based on the size and complexity of the construction to be accomplished and shall include a fall protection and prevention program. A typical safety plan will address such issues as, but will not be limited to:

3.3.1 The company’s safety and health policy.

3.3.2 Company safety inspections of the job site.

3.3.3 Use of personnel protective equipment (PPE).

3.3.4 Safety rules and penalties associated with not following the rules.

3.3.5 Safety training and frequency (identifying hazards, explaining precautions and proper use of equipment/machinery, and the PPE required for the job including how to use and maintain

PPE).

3.3.6 The steps to be followed to report unsafe working conditions and practices.

3.3.7 Special hazards.

3.3.8 Hazardous materials.

3.3.9 Confined spaces, i.e. entry procedures and ventilation requirements, etc.

3.3.10 Lockout tag procedures.

3.3.11 Instruction concerning safe operations and appropriate emergency action in the event of accidental exposure.

3.3.12 Emergency procedures.

3.3.13 Identifying personnel on site who have had first aid training.

3.3.14 Post where communication devices (phones, two‐way radios, etc.) are located with appropriate phone numbers posted.

3.3.15 Post how to exit the work area in an expeditious and safe manner.

3.3.16 The plan will identify the person with lead responsibility for safety, where protective equipment may be obtained and the procedures for reporting a safety hazard

3.4 Internal Job Site Safety Inspections:

Frequent and regular contractor internal job site inspections should focus on identifying and removing hazards.

The Contractor’s Safety Plan will explain the disciplinary process that will be followed when the contractor job inspections find violations to the safety rules. The disciplinary process should be included in the employee’s training and reviewed during regular safety briefings. The Government will review the Contractor’s Safety Plan for adequacy, completeness and compliance with OSHA and EM 385‐1‐1 requirements. Continuously review and amend the safety plan, as necessary, throughout the life of the contract. Incorporate unusual or high‐hazard activities not identified in the original safety plan as they are discovered.

3.5 Hazard Analysis:

Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform the work, the contractor(s) performing that work activity shall prepare an Activity Hazard Analysis (AHA). An activity hazard analysis is sometimes called a job hazard analysis.

3.6 Accident Reporting Requirements:

Accidents involving personal injury/illness or property damage shall be reported to the authorized representative (Contracting Officer Representative) and/or Project Manager immediately. After the notification, the contractor shall prepare an Engineer Form 3394, Accident Investigation Report, shall be prepared and submitted for all lost work day cases, accidents where 3 or more persons are admitted to a hospital, a fatality, a permanent total disability, a permanent partial disability, property damage $2000 or greater, or as directed by the Contracting Officer. The Engineer Form 3394 shall be submitted to the Contracting Officer within 5 working days following the accident in accordance with AR 385‐40 and USACE Supplement 1 to that regulation.

3.7 Safety Meetings:

The contractor shall conduct and document meetings as required by EM 385‐1‐1. Attach minutes showing contract title, signatures of attendees and a list of topics discussed to the contractor's daily report.

3.8 Display of Safety Information:

The contractor shall erect a safety bulletin board at the job site at least one calendar day prior to commencement of work. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer Representative (COR), that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385‐1‐1, section 01.A.06.

3.9 Work in Confined Spaces:

Comply with the requirements in Section 34 of USACE EM 385‐1‐1, OSHA 29 CFR 1910.146, and OSHA 29 CFR 1926.21(b)(6). Any potential for a hazard in the confined space requires a permit system to be used. WSMR Fire Department issues permits for confined space entry. Please call 575.678.6986/4020 to obtain a permit. Permits shall be requested no later than 48 hours (2 working days) in advance. The contractor shall coordinate with the COR to submit the permit request.

3.10 Safety Data Sheets for Hazardous Materials:

The Contractor shall submit a List of Hazardous Materials (LHM) and Safety Data Sheets (SDS) in accordance with the requirements of paragraph e of the clause at FAR 52.223‐3 Alternate 1, “Hazardous Materials Identification and Safety Data.”

3.11 Radiation Permits and Authorizations:

Civilian contractors bringing radioactive devices e.g. nuclear soil density meters onto the Installation must have approval from the Installation Radiation Safety Officer. Contractor shall prepare and submit an application to bring in radiation devices at least 7 calendar days prior to anticipated use. Contractor shall not bring in any devices without a government approved application.

Part 4 – Environmental Quality Program

4.1 Cleanup and Disposal of Waste Materials:

The contractor shall be responsible for the cleanup and disposal of waste and debris generated during and at the completion of this project. The Contractor shall be responsible for the payment of all disposal costs, fees for obtaining permits and licenses, and transportation costs. In addition, the Contractor shall pay, at no additional cost to the Government, all fines and clean‐up costs due to improper disposal or due to spills, leaks, or releases. In general, the waste and debris shall be disposed of in accordance with all applicable federal, State, and Local laws and regulations. Specifically, the waste and debris shall be disposed of in accordance with the jurisdiction having authority, including, any disposal site outside the State of New Mexico. The Contractor shall ensure that all waste and debris is containerized in accordance with the U.S. Department of Transportation and the jurisdiction having authority laws and regulations. The Contractor shall ensure that all waste is containerized in a manner to prevent uncontrolled and improper spills, leaks, and releases.

4.2 Waste Hauler Requirements:

All waste haulers shall be licensed in accordance with the requirements specified in the appropriate New Mexico Administrative Code (NMAC) for the type of waste to be disposed of. In addition, all waste haulers are responsible for obtaining all required licenses and permits for jurisdictions outside of the State of New Mexico if crossing state lines to dispose of the waste.

4.3 Waste Disposal:

The contractor shall dispose of all waste and debris as follows:

4.3.1 Construction waste and debris: All construction waste, as defined by the New Mexico Environment Department Solid Waste Bureau shall be disposed of at an off‐site location that has been permitted, by the jurisdiction having authority, to accept and dispose of construction waste and debris.

4.3.2 Municipal solid waste: All municipal type waste and debris, as defined by the New Mexico Environment Department (NMED) Solid Waste Bureau (SWB) shall be disposed of at an off‐site location that has been permitted, by the jurisdiction having authority, to accept and dispose of municipal solid waste.

4.3.3 Hazardous Waste, Universal Waste, and PCBs: All hazardous/universal waste and PCBs shall be disposed of through the WSMR Hazardous Waste Management Center. The COR will coordinate with the Hazardous Waste Management Center to determine if the contractor is responsible for disposing of the waste directly or if the waste is to be turned over to the Hazardous Waste management Center for disposal. The contractor is responsible for containerizing and transporting the waste in accordance with the U.S. Department of Transportation (USDOT) and the jurisdiction having authority regulations for the transportation of hazardous materials. In addition, the contractor shall be responsible for completing and managing the waste manifest whenever transporting hazardous waste/universal waste and PCBs.

4.3.4 Ozone Depleting Refrigerants: Ozone depleting refrigerants shall be disposed of through the WSMR Logistics Readiness Center. The contractor is responsible for containerizing and transporting the refrigerants in accordance with USDOT and the jurisdiction having authority regulations for the transportation of refrigerants.

4.3.5 Asbestos Waste and Debris: All asbestos waste and debris shall be disposed of at an off‐site the asbestos waste and debris. The Contractor shall ensure that all asbestos waste and debris is containerized and transported in accordance with the USDOT and the jurisdiction have authority regulations. In addition, containers such as roll‐offs and trailers shall have rigid sides, bottoms, and tops to transport asbestos waste and debris. Containers with soft covers (e.g. tarps) are prohibited. The contractor shall be responsible for completing and managing the asbestos waste shipment record in accordance with EPA regulation 40 CFR Part 61 and the State of New Mexico Environment Department Solid Waste Regulations.

4.3.6 Liquid, semisolid, and sludge waste: All liquid, semisolid, and sludge waste shall be disposed of at an off‐site location that has been permitted, by the jurisdiction having authority, accept and dispose of the waste.

4.3.7 Waste from Portable Latrines (“Port‐a‐Potties”): All waste from portable latrines shall be disposed of at an off‐site location that has been permitted, by the jurisdiction having authority to accept and dispose of the waste.

4.3.8 Scrap Metal: To the extent possible or if required as part of this project, scrap metal, including electrical wiring, shall be disposed of at the WSMR Metal Scrap Yard. All glass shall be removed from metal windows and metal doors before transporting the scrap metal to the Metal Scrap Yard.

4.3.9 All other waste and debris not specifically noted: Dispose of all other waste and debris in accordance with the laws and regulations of the jurisdiction having authority.

4.4 Prohibitions:

4.4.1 On‐site Burning or incineration of waste and debris.

4.4.2 On‐site burial.

4.4.3 Dumping at locations not permitted, by the jurisdiction having authority, to accept and dispose of the waste and debris.

4.4.4 Use of unlicensed waste haulers.

4.4.5 Using containers that are not appropriate for the disposal of waste and debris.

4.5 Air Pollution Prevention:

The contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution. The Contractor shall utilize such methods and devices as are reasonably available to prevent, control, and otherwise minimize atmospheric emissions or discharges of air contaminants.

For examples, equipment and vehicles that show excessive emissions of exhaust gases shall not be operated until corrective repairs or adjustments reduce such emissions to acceptable levels.

4.6 Dust Control:

During the performance of work required, the Contractor shall comply with applicable Federal, State, and local laws and regulations regarding the prevention, control, and abatement of dust pollution. The Contractor shall be responsible for all damages resulting from dust originating from Contractor operations in accordance with the clause at FAR 52.236‐07 entitled “Permits and Responsibilities.” The Contractor shall provide all labor, equipment, and materials, and shall use efficient, methods wherever and whenever required to prevent, dust nuisance or damage to persons, property, or activities, including, but not limited to crops, orchards, cultivated fields, wildlife habitats, traffic, and similar conditions.

4.7 Water Pollution Prevention:

Contractor shall control point source discharges by use of sediment and erosion controls; wastewater and storm water management controls; construction site management practices, and other controls; including Federal, State, and local control requirements. A Storm water Pollution Prevention (SWPP) Plan is not required but the Contractor is responsible to mitigate erosion control and install storm water management controls.

4.8 Sanitary Facilities:

Contractor is responsible to provide a portable latrine for Contractor use. The designated restroom(s) must be properly maintained and all accumulated dirt and/or debris from on‐going construction must be cleaned immediately.

Part 5 – Contractor Quality Control

5.1 Contractor Daily Reports:

Submit a daily report, showing the contractor inspections and tests, on the first workday following the date covered by the report. Work quality shall be the responsibility of the contractor. Inspect and test work often enough to ensure that quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable standards.

5.2 Construction Phasing:

Government will maintain use of the adjacent access areas during construction activities. The contractor will be provided with reasonable access and storage areas during construction in the vicinity of the construction.

Contractor will be responsible for maintaining the construction area and storage facilities and repairing damage caused during construction activities prior to substantial completion and final payment. The Contractor shall remove all stored materials and equipment at the end of the contract work.

5.3 Work Area Maintenance:

All areas disturbed by the Contractor’s operation shall be kept reasonably clean by the contractor. During the course of the work, the Contractor shall periodically, or as directed by the COR, remove and dispose of all surplus construction materials and debris and keep the project area clean. Upon completion of the work, the Contractor shall remove temporary construction facilities, debris, and unused materials, leaving the project site in a neat and clean condition.

5.4 Utilities Clearances and Outages:

Contractor shall obtain utility clearances before digging, boring, burrowing, tunneling, excavating and any other penetrations that may damage underground utilities. Contractor shall notify the COR in writing no more than one week (7 calendar days) in advance and no earlier than 72 hours (3 calendar days) in advance prior to excavation. Contractor shall white mark all proposed excavation locations prior to requesting utility locates.

Utility outages shall be requested in writing at least one week (7 calendar days) in advance. The following utility clearances shall be required before the start of construction:

5.4.1 Communications Line

5.4.2 Electrical Line.

5.4.3 Gas Line.

5.4.4 Water Line.

5.4.5 Waste Water Line.

5.4.6 PNM Gas Lines.

5.4.7 Comcast Cable.

5.5 Emergency Suspension of Work:

When the Contractor is notified by the Contracting Officer Representative or Project Manager, of noncompliance with the safety provisions of the Contract, the Contractor shall immediately, unless otherwise instructed, correct the unsafe or unhealthy condition.

5.5.1 If the Contractor fails to comply promptly, all or part of the Work will be stopped by notice from the Contracting Officer Representative under the direction of the Contracting Officer.

5.5.2 When, in the opinion of and by notice given by the Contracting Officer or the Contracting Officer Representative under the direction of the Contracting Officer, satisfactory corrective action has been taken by the Contractor, work shall resume.

5.5.3 The Contractor shall not be allowed any extension of time or compensation for damages in connection with a work stoppage for an unsafe or unhealthy condition.

5.6 Government Witness:

All inspections and tests are required to verify documented contract assumptions, to establish work accomplishment, or to certify performance attainment shall be witnessed by the Government COR and coordinated through the Quality Control Plan (QCP). The contractor shall notify the COR in writing at least one calendar week prior to conducting.

5.7 Documentation:

The Contractor shall provide 1 electronic copy of documents containing all test reports/findings. Test results shall typically include: item/system tested, location, date of test, test parameters/measured data, date of last calibration done in the equipment, Contractor Inspector/Government witness, test equipment description and measurement technique. When complete, contractor shall provide these inspections/tests documents as an electronic copy to the COR.

Part 6 – Product Requirements

6.1 General Information:

References to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specified.

6.2 Delivery, Storage, and Handling:

Transport and handle manufactured products in accordance with manufacturer's instructions. Store and protect manufactured products in accordance with manufacturer's instructions. Remove and replace damaged items with new items. Store curing compounds, sealants, adhesives, paints, coatings, sealers, joint compounds, grouts, and similar products at the temperature and environmental conditions recommended by manufacturer.

6.3 Installation:

Install products in accordance with manufacturer’s recommendations unless otherwise specified.

6.4 Product Data:

Submit manufacturer's printed instructions including detailed application procedures, minimum and maximum application temperatures, and curing procedures. Include SDS for materials to be used at the job site.

Part 7 – Required Employee Training

7.1 Employee Training:

All persons entering White Sands Missile Range as part of the contract shall complete the following training.

Proof of completion of training shall be submitted to the COR prior to the start of any work.

7.1.1 Unexploded Ordnance Training. Prior to the start of any work on the installation, all Contractor and sub‐contractor employees are required to watch the Installation Unexploded Ordnance Briefing Video. All employees are required to read Policy Letter #24 and complete the Record of Organizational Training on Unexploded Ordnance Range Hazards. The video and policy letters are available for download at http://www.wsmr.army.mil/ux/Pages/default.aspx.

7.1.2 Wildlife‐Vehicle Accident Prevention information video. Available for download at http://www.wsmr.army.mil/ux/Pages/default.aspx.

7.1.3 AT Level‐1 Training. All Contractor and subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 7 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

7.1.4 iWATCH Training. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the appropriate personnel. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

Part 8 – Project Submittals

8.1 Submittals:

The contractor shall furnish all materials and perform all work required for furnishing submittals to the Government, in accordance with the clause at FAR 52.236‐21, and the requirements in the provisions, clauses, and paragraphs of these specifications.

8.2 Submittal Requirements:

Contractor shall provide one electronic copy of all submittals to the COR with a courtesy copy forward to the Contracting Officer. TRADOC FORM 928‐R‐E, Jan 02 version are required for all submittals. All TRADOC Forms shall be electronically fillable.

8.3 List of Submittals:

After contract award and preconstruction meeting, at a minimum, the following submittals shall be provided by the contractor to the COR.

8.3.1 List of subcontractors (SF‐1413) as per 52.222‐11, within 14 days of award.

8.3.2 Health and Safety Plan at least 30 days prior to any construction activity.

8.3.3 Accident Hazard Analysis at least 30 days prior to any construction activity.

8.3.4 Quality Control Plan. The Quality Control Plan shall include the name of the Contractors Quality Control (CQC). During the actual work activities, a CQC shall be on site at all times who is an employee of the prime contractor and has authority to make decision on behalf of the prime contractor.

8.3.5 List of Hazardous Materials (LHM) prior to commencement of work.

8.3.6 Safety Data Sheets (SDS) prior to commencement of work.

8.3.7 Construction schedule within 5 days of start of work; updates by 10th of each month.

8.3.8 A submittal for all materials used during construction.

8.3.9 Other close out documents required include as‐built drawings in AutoCAD.

8.3.10 Square post extruded blade street name sign bracket.

8.3.11 90° cross separator bracket.

8.3.12 Universal cross separator bracket (45° or 180°).

8.3.13 Sign panel material.

8.3.14 High intensity prismatic reflective sheeting.

8.3.15 Galvanized square sign posts.

8.3.16 NCHRP 350 post breakaways.

8.4 Government Review of Submittals:

Review and acceptance of submittals by the Government does not relieve the Contractor from the responsibility to meet all specifications, drawings, and other required contractual standards or regulations.

The Government will require fourteen (14) calendar days for review of each submittal or resubmittal furnished by the contractor for approval.

8.5 Equipment Manuals:

The Contractor shall provide manuals/documentation reflecting "As‐Built" constructed building features/systems, including specifications, shop drawings, design calculations, and operation/maintenance requirements. Contractor shall provide one electronic copy of all manuals to the COR. All content shall be legible, first generation photocopies or prints of published material. Each manual shall be appropriately titled and provided with an introduction and table of contents. Should the Government establish that a submitted manual/document fails to represent installed conditions, the document shall be returned and corrected by the Contractor to the satisfaction of the Government at no additional cost.

8.6 Shop Drawing/Product Data Manual:

The Contractor shall provide 1 electronic copy of all shop drawings and product data manuals containing all approved shop drawing and product/catalog data submissions to the COR.

8.7 Operation and Maintenance Manual:

In addition to those manuals required to support training requirements, the Contractor shall prepare and provide one (1) detailed copy of Operation and Maintenance Manual(s), identifying all procedures, tools, equipment and parts necessary to assure satisfactory operations and to provide maintenance per manufacturer's recommendations. The manual(s) shall also include the manufacturers’ names addresses and telephone numbers. The design/build contractor’s name, address and telephone number shall be permanently affixed to the front cover of each manual along with the project number, contract number and the date of submittal of the manual. Contractor shall provide these manuals as an electronic copy to the COR.

8.8 Warranties:

At the conclusion of the project, the contractor shall provide to the COR, one (1) electronic copy of complete list of all warranted items and equipment responsibilities, specific warranties and guarantees, final certifications, and similar documents at the time of acceptance/substantial completion. All manufacturer's warranties shall be passed on to the government and defective parts shall be replaced without added handling surcharges, return fee, freight, restocking fees or other miscellaneous costs.

Part 9 – Construction Schedules

9.1 Construction Schedule:

The contractor shall develop, maintain and use an approved construction schedule to plan, monitor, and evaluate the accomplishment of work. Failure to include any element of the work on the schedule will not release Contractor from completing all required work under the contract. Prepare schedule based on required sequence and interdependence of activities. Include work of subcontractors, Government interfaces, and contract milestones. The Contractor shall submit an updated schedule by the tenth (10th) of each month throughout the term of this contract. The Contractor shall enter actual progress on the updated schedule. If in the opinion of the Contracting Officer Representative (COR), the contractor falls behind the approved schedule, the contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction, and to submit for approval any supplementary schedule or schedules in chart form as the Contacting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

Part 10 – Hazardous Building Materials Abatement

10.1 GENERAL:

No asbestos, lead‐based paint, or mold abatement is required for this project.