SOLICITATION AMENDMENT 1

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011148557-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to:

1. Incorporate the answ ers to the RFI questions.

2. Update draw ings, instructions to bidders and upload pictures.

3. To extend the solicitation from 31 August 2018 to 06 September 2018

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG18B0024

X 9B. DATED (SEE ITEM 11)

31-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2018

CODE

MICC-FT BLISS W911SG

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SG18B0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 31-Aug-2018 10:00 AM to 06-Sep-2018 10:00 AM.

The required performance has changed from This is an “Invitation for Bids”Project Title: Sinking Culvert RepairA bid guarantee is required (see clause at FAR 52.228-1). All bid bonds must be originals; photocopies will not be accepted. Performance and payment bonds are required (see clause at FAR 52.228-15)This is a 100% competitive set-aside for Service Disabled Veteran Owned Small Business (SDVOSB) under NAICS 237310 with a small business size standard of $36.5 MillionThe estimated magnitude of construction for this project is between $100,000.00 and $250,000.00Applicable New Mexico Gross Receipts Tax Rate for Dona Ana County is 6.75% as of the date of solicitation.The awardee of this contract will be required to provide a Superintendent at all times work is being performed on the project (see clause at FAR 52.236-6). The Superintendent is considered a key position. This position SHALL NOT be subcontracted and must work directly for the prime contractor.Bid opening address:

MICC-Fort Bliss, 111 Pershing Rd, Fort Bliss, TX 79916Resulting contract will be Firm-Fixed-Price (FFP) to This is an “Invitation for Bids”Project Title: Sinking Culvert RepairA bid guarantee is required (see clause at FAR 52.228-1). All bid bonds must be originals; photocopies will not be accepted. Performance and payment bonds are required (see clause at FAR 52.228-15)This is a 100% competitive set-aside for Service Disabled Veteran Owned Small Business (SDVOSB) under NAICS 237310 with a small business size standard of $36.5 MillionThe estimated magnitude of construction for this project is between $100,000.00 and $250,000.00Applicable New Mexico Gross Receipts Tax Rate for Dona Ana County is 6.75% as of the date of solicitation.The awardee of this contract will be required to provide a Superintendent at all times work is being performed on the project (see clause at FAR 52.236- 6). The Superintendent is considered a key position. This position SHALL NOT be subcontracted and must work directly for the prime contractor.Bid opening address: MICC-Fort Bliss, 111 Pershing Rd, Fort Bliss, TX 79916A CD with bid documents in PDF shall be included with the sealed bid.Resulting contract will be Firm-Fixed-Price

(FFP).

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS

1. POINT OF CONTACT (POC):

Christopher Herrera, Purchasing Agent Tel: 915-569-7659 Email: christopher.herrera1.civ@mail.mil

2. COMPETITION REQUIREMENTS: This procurement is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set-aside acquisition.

3. SITE VISIT: The Government has scheduled a one day site visit at Route 21 WSMR, NM at 0800 am MST on 10 August 2018.

a. We will meet at White Sands Missile Range, New Mexico BLDG 102 (Parking lot)

b. Firms who wish to attend the site visit shall provide the name(s), company name, position title, telephone number, email address and mailing address of all attendees via e-mail to christopher.herrera1.civ@mail.mil later than 4:00 pm MST on 08 August 2018.

c. The site visit is limited to a maximum of two (2) attendees per company. Contractor representatives should be prepared to furnish identification if requested.

d. Individual or group questions will not be answered during the site visit. Potential offerors may submit written questions in accordance with number 4 (below) of this instructions to bidders section.

e. Potential offerors are not allowed to take pictures at the site visit. If pictures are required, the offeror may ask the designated Government representative to take any pictures requested. Pictures will subsequently be cleared by the WSMR Security Office and then incorporated into the solicitation as an amendment.

Note: Remarks and explanations made by the Government representatives during the course of the site visit, whether orally or in writing, shall not change or qualify any of the terms or conditions of this solicitation. The solicitation can only be changed by a formal written amendment issued by the Contracting Officer (KO).

4. REQUEST FOR INFORMATION (RFI): All offeror inquiries or questions shall be submitted in writing electronically to Christopher Herrera at christopher.herrera1.civ@mail.mil no later than 22 August 2018 at 16:00 MST. An amendment will then be issued with all questions and answers. **After the due date no additional RFI’s will be answered**

5. PRE-AWARD INFORMATION: Contract shall be awarded to the responsible prospective contractor. Before award, to be determined responsible, a prospective contractor must furnish the following information with their bid:

a. Cover sheet: Coversheet shall be on company letterhead and must contain your DUNS number, CAGE code, Tax ID, and primary point of contact information. Failure to provide all of the above requirements could render your bid nonresponsive.

b. Signed and completed SF 1442 along with any amendments.

c. Letter from Bonding Company: Letter must indicate the bidder’s ability to obtain performance and payment bonds in the amount of their bid. Failure to provide this letter could render your bid as nonresponsive

d. Bid Bond Guarantee: per FAR 52.228-1, failure to provide a bid bond guarantee per FAR 52.228-1 could render your bid nonresponsive.

e. Subcontractor List: Bidders shall submit a list of proposed subcontractors as an attachment to their bid. If bidder does not intend on utilizing subcontractors (self-perform), Bidder shall state so in their bid. Failure to provide this listing or statement will render the bid nonresponsive and eliminate the offer from further consideration for award.

f. Work Experience: The prime contractor shall demonstrate that it possesses general construction contract management by providing at least two examples of relevant work experience in an awarded contract similar to the requirements stated in this solicitation.

Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, and the period of time allocated for completion of the work. Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose.

Failure to provide this documentation will render the bid/offer non-responsive and no further consideration will be given to that bidder for award of this contract.

g. CD: A CD with bid documents in PDF shall be included with the sealed bid.

6. SUBMISSION OF BIDS

ELECTRONIC SUBMISSION OF BIDS, TO INCLUDE E-MAIL AND FACSIMILE

TRANSMISSIONS, IS NOT AUTHORIZED.

The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf as indicated below. Bids shall not be addressed to any specific person. Any bids hand-delivered between 9:00 am and 10:00am on the due date shall only be delivered to the bid opening room at:

**Hand Delivered Address** MICC-Fort Bliss, Room 220 Bldg. 111 Pershing Rd Fort Bliss, TX 79916

All bids must be clearly identified with the bidder’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Invitation for Bid No: W911SG-18-B-0024 Due Date of Bids: 06 September 2018 Time by which Bids are due: 10:00 A.M. (Mountain Standard Time) Title of Project: Sinking Culvert Repair Route 21

Bids delivered prior to one hour before bid opening must be delivered only by U.S. Mail, including U.S. Express Mail, Federal Express or United Parcel Service to the address as indicated below. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Mailroom personnel do not receive bids, delivered bids will subsequently be picked up by MICC-Fort Bliss personnel. After receipt by MICC-Fort Bliss personnel, a record will be made of the receipt of the bid. Completion of these actions will constitute delivery of the bid by the date and time designated for receipt of bids. Bidders are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of bids. Bids sent by U.S Mail, U.S. Express Mail, Federal Express and United Parcel Service are required to be sent to:

**Regular Mail** MICC-Fort Bliss (BLDG 111) ATTN: Christopher Herrera 1733 Pleasonton Rd

Fort Bliss, TX 79916

**Express Mail** MICC-Fort Bliss (BLDG 111) ATTN: Christopher Herrera Bldg. 111 Pershing Rd Fort Bliss, TX 79916

*Note the mailing address differs from the bid opening location.

Bidders must allow sufficient time to complete security screening to gain admittance to Fort Bliss, TX. The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Bidders are responsible for ensuring bids are submitted so as to reach the location designated for receipt of bids.

If a Bidder believes that the requirements in this Invitation for Bid contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Information for Bid based on the initial bid, as received, without discussion.

7. PUBLIC BID OPENING: Please refer to Block 13A of the SF1442. Anyone wishing to attend the bid opening MUST notify the Contracting Officer (mark.h.fitzgerald.mil@mail.mil) and the Purchasing Agent christopher.herrera1.civ@mail.mil by no later than 5 calendar days prior to the bid opening date with a firm commitment to attend.

8. SYSTEM FOR AWARD MANAGEMENT (SAM): Bidder must be registered in the database IAW FAR 52.204-7 in order to be awarded a contract and have the applicable NAICS code listed in FAR 52.219-1(c), Small Business Program Representations (Alternate I), Representations

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

DPW047048P_Plans Drawings_27 Aug 2018_Final Construction Set for Route 2...

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

RFI ANSWERS

W911SG-18-B-0024 SINKING CULVERT REPAIRS

1. Will a CAD PDF be adequate for topo and drainage plans?

No. Just like the as-builts, an electronic copy (AutoCAD .dwg format) shall be provided.

2. Will government confirm that the superintendent may dual hat superintendence, quality control, and safety?

Government concurs, superintendent may dual hat superintendence, quality control and safety.

3. Will government provide us with photos of current site conditions?

Photos were submitted to Ft. Bliss MICC on 16 August ’18.

4. Will government allow one 20 ft. width of bypass road in lieu of two 12' bypass roads?

Yes, DPW-E has granted permission to use tank trail on west side of Route 21 as a bypass.

5. Will bypass road require any millings applied to surface?

No millings will be required on bypass road, but contractor shall provide continued maintenance and water throughout the duration of construction.

6. A 48"x76" ID Concrete Culvert is not manufactured in the El Paso/ Las Cruces area, would a 43" x 68" size Concrete Culvert be acceptable for use on this Project?

Contractor will not be providing new concrete culverts; existing culverts will be re-used. I provided concrete culvert dimensions for contractor information only. SEE NOTE 5, PLAN SHEET #6

7. How thick is the RipRap?

Existing riprap is 8 inches thick. Contractor shall reinstall riprap at 8 inches thick as it was previously.

8. Is the RipRap going to take Iron Stakes?

No iron stakes are needed for riprap. A geo-synthetic fabric liner underneath and diamond wire mesh shall be provided.

9. What type of Rock? (I'm assuming Basalt or Gabbro) Contractor will re-use the existing rock that shall be stockpiled. SEE NOTE 4, PLAN SHEET 5.

10. Is there any work on those bypass roads? Is it existing? Or do we providing a Temp road? Does it need base course?

Contractor shall provide a bypass road; it does not exist at the moment. Base course will not be needed for the temporary bypass road. SEE QUESTION 5 ABOVE.

11. General Note 11, says to cold mill and mix with existing base course, but note 2 on the demo sheet says to break asphalt and haul.

Contractor shall cold mill and mix into existing base course. Plan Sheet 2 has been updated to reflect the same verbiage as General Note 11.

12. Are we going to cold mill? Or Break off and haul Asphalt?

Contractor shall cold mill per Note 2, Plan Sheet 5. SEE QUESTION 11 ABOVE.

13. Will the contractor be allowed to combine both bypass roadways to the “tank trail”?

Yes. PLEASE SEE QUESTION 4 ABOVE.

a. Please provide the minimum dimensions of the bypass roadway if both roadways are combined to the “tank trail”.

Bypass road shall be 20 feet wide and shall carry 2-way traffic adjacent to project site.

14. Please specify the location of the closest water source and the distance from the project site.

See General Note 17, Plan Sheet 2.

15. What is the weight of the existing RCP culvert that is to be removed/reused?

Weight of concrete culverts is 1,535/LF. Each section is an 8 foot section with the exception of all four ends; which, are 4 foot sections each.

16. Will the contractor be given access/permissions to enter WSMR/project site from Highway 70?

Yes, this will be coordinated through the WSMR COR (Mr. Michel Leroux).

17. Will the contractor be allowed to stage equipment at the project site?

Yes. DPW-E has provided a staging area approximately 100 feet northeast of culverts.

18. As discussed in the site visit, the asphalt has to be reduced to a certain size before disposal. Please specify this size.

Asphalt millings shall be pulverized to no greater than 1” in diameter and reincorporated into sub-base. SEE NOTE 2, PLAN SHEET 5.

19. Can you provide coordinates on the location of the area or a map?

Please see Site Location, Plan Sheet 3.

20. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?

For this project the Federal Government is immune from State and local sales taxation. If requested, the Government can provide a Standard Form 1094, U.S. Tax Exemption Form to the successful bidder. However it is important for all bidders to understand that the *sucessful bidder* is responsible for the applicable New Mexico Gross Receipts Tax (NMGRT) for this project.

21. Where will the designated parking area be for workers accessing the construction site?

Contractor may use the staging area for parking. See question 17 above.

22. Does the Government currently have a 3rd party testing service for those items requiring testing or is the contractor free to locate and hire applicable testing firms?

No. Contractor is responsible for obtaining their own laboratory testing firm.

23. Who is responsible for the utility locations on this government facility?

All utility locates will be coordinated through the Government COR (Mr. Michel Leroux). Contractor shall notify COR minimum of 10 days prior to needing locates and shall white line in the vicinity of where digging will be performed. Government personnel will locate water, waste water, gas, communication lines and electric utilities. Contractor shall call 811 to locate century link and Comcast. There is no cost to the contractor for government utility locates.

24. Due to current potentially significant tariffs being placed on the importation of materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would increase pricing on all steel or wood materials, regardless of origin.

This is a Firm Fixed Priced FFP contract so the government will not consider price escalation.

25. Is there water access available at the job site? If not, what is the nearest location?

SEE QUESTION 14 ABOVE.

26. Is there a specific manner or location for disposal of the spoils, debris and refuse created?

Rigid concrete (cleaned of rebar) and asphalt may be disposed of at the Hughes Reclamation Area. All other debris (non-hazardous) generated can be disposed of at the WSMR C&D landfill.

27. In regards to UXO, has the site for this project been cleared for earthwork?

Yes. The Chief of Safety Office has cleared this area since there’s been no historical information that UXO’s have been found nor the area was an old impact zone and area has previously been disturbed.

28. Are all key personnel required to be onsite during all construction activities (Quality Control, Superintendent, and Safety Officer)?

Yes.

29. Can the Superintendent also function as the Site Safety Officer as long as properly trained?

30. Can the Superintendent also function as the QC if they have the experience and/or training to operate in that capacity?

(End of Summary of Changes)