TE_5.4-001-_Required_Scheduled_Tasks.pdf

PDF 10 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.doc DOC document
TE_5.2-017_-_Earth_Electrode_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.xls XLS spreadsheet
TE_5.7-002-_Street_Sweeping_Schedule.doc DOC document
TE_3-001-_Gov't_Furnished_Facilities.xls XLS spreadsheet
TE_5.5-002-_Chlorofluorocarbon_(CFC)_Control.doc DOC document
TE_5_5-006_Filter_Count.xlsx XLSX spreadsheet
TE_5.6-003-_Leaf_removal_Areas.doc DOC document
TE_5.2-007-_ICYET_Inspection_Deficiency_List.docx DOCX document
TE_5.6-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.docx DOCX document
TE_5_10-004_Water_Heater_Inspections_(8_Feb_13).docx DOCX document
TE-1-014_OM_CLS_SSP.doc DOC document
Attachment_8_-_Collective_Bargaining_Agreement_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-4_Contractor_Furnished_Property.docx DOCX document
Attachment_3_Teaming_Consent,16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.7_SURFACED_AREA_MAINTENANCE.doc DOC document
Sec_C-5.11_RANGE_MAINTENANCE.doc DOC document
TE_5.10-006a-_Boiler_Building_List.pdf PDF
TE_5.1-001-_Installed_Serviceable_Equipment.pdf PDF
TE_5.8-004-_Recycle_Material_Collection_Stations-_Map.doc DOC document
TE_5.4-006_Petroleum_Products_Issued.pdf PDF
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route _Map_1.pdf PDF
TE_5.9-002_-_Transaction_Record.pdf PDF
TE_5.2-016_-_Signal_Ground_Reference_Subsystem_Checklist_For_New_Facilities.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_ _MAINTENANCEb.pdf PDF
TE_5.5-005-_Building_List_for_Heating_Plants_and_Systems.pdf PDF
TE_5.6-004-_List_of_Memorials.pdf PDF
Sec_C-5.8_MATERIAL_RECYCLING_FACILITY_b.pdf PDF
Sec_C-5.7_SURFACED_AREA_MAINTENANCEb.pdf PDF
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.pdf PDF
Technical_Exhibit_5.13-003_Building_100_Equipment.pdf PDF
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.pdf PDF
Sec_C-5.11_RANGE_MAINTENANCEb.pdf PDF
Sec_C-5.6_GROUNDS_MAINTENANCEb.pdf PDF
TE_5.1-005-_Automated_Information_Systems.pdf PDF
TE_5.1-008-_Bldgs._Under_Barracks_Maint._Prgm..pdf PDF
TE_5.1-004-_Labor_Hours_for_IJO's_by_Craft.pdf PDF
TE_5.12-006b_Columbarium_Numbering.pdf PDF
TE_5.5-002-_Chlorofluorocarbon_(CFC)_Control.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS

Utility Systems Operation and Maintenance

Technical Exhibits C-7.5.4-001-1 Fort Benning

Description PWS Paragraph

No. Unit Description Actual # Freq.

Description

# of Occur-ances /Year

If Req., # Persons Comments

Electrical Systems

- Engine Generators 5.4.3.2.1 Generators TE 5.4-003 Monthly 12

- Electric Meter Reading 5.4.3.2.2 Meters TE 5.1-001 Monthly 12

- Weather Sirens 5.4.3.2.3 System 1 Monthly 12

Fuel Distribution Systems

- UST Reports 5.4.3.3.2 Report 1 Annually 1

Natural Gas Distribution Systems

- Gas Meter Readings 5.4.3.4.2 Meters TE 5.1-001 Monthly 12

Peak Shaving Propane Plant Maintenance 5.4.3.5.10 Plants 2

Semi- Annually 2

TE 5.4-001

File details come from the government source that posted it. Updated .