TE_5.2-016_-_Signal_Ground_Reference_Subsystem_Checklist_For_New_Facilities.pdf

PDF 111 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.7-003-Road_Inspection_Areas.doc DOC document
TE_5.12-003_Sources_of_Work.xlsx XLSX spreadsheet
TE_5.10-006-_Boiler_Building_List.xls XLS spreadsheet
Technicial_Exhibit_5.13-002_Chiller_Annual_Inspection_Checklist.docx DOCX document
Sec_C-5.4_UTILITY_OPERATIONS_&_MAINTENANCE.rtf RTF text file
Attachment_4_-_Past_Performance_Questionaire_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.3_DINING_FACILITY_EQUIPMENT_MAINTENANCE.docx DOCX document
Sec_C-3_Government-Furnished_Property_and_Services.doc DOC document
Sec_C-5.12_CEMETERY.pdf PDF
Sources_Sought-_Ft._Benning_BASOPS_4_May_2017.pdf PDF
DRAFT_SOLICITATION_16-R-0012_DPW_Benning_BASOPS__19_Jan_17.pdf PDF
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.pdf PDF
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.pdf PDF
TE_5.1-010_-_Variance_Report.pdf PDF
TE_5.1-006-_List_of_ISA _MOU _MOS'a.pdf PDF
Sec_C-5.9_SELF-HELP_SERVICES.pdf PDF
TE_5.2-009-_Building_and_Traffic_Sign_Areas.pdf PDF
TE_5.8-002-_Quantities_Req'd_to_be_on_hand_before_NAF_bid.pdf PDF
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).pdf PDF
TE_5.1-002-_Service_Order_(SO)_Workload_Summary.pdf PDF
TE_5.10-002-_Bldgs._Requiring_Fire_Sprinkler_Inspections.pdf PDF
TE_5.4-003-_List_of_Fuel_Tanks.pdf PDF
TE_5.6-005-_Leaf_removal_Areas.pdf PDF
TE_5.8-001-_List_of_bldgs._currently_serviced_by_MRF_Personn.pdf PDF
Sec_C-5.12_CEMETERY_SERVICES.pdf PDF
Technical_Exhibit_5.13-004_Deliverables_Schedule.pdf PDF
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.pdf PDF
TE_5.2-008-_USAIC_Suppl_1_to_AR_1-33.doc DOC document
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.pdf PDF
TE_5.1-003-_Service_Order_(SO)_Priority_Classifications.pdf PDF
Sec_C-5.1__TECHNICAL_DESCRIPTION_OF_WORKb.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.1-016

LOCATION DEFICIENCIES

LOCATION DEFICIENCIES

TEST POINTS RESISTANCE MEASUREMENT

SIGNAL GROUND REFERENCE SUBSYSTEM CHECKLIST FOR NEW FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

5. SKETCH THE LAYOUT OF THE ACTUAL SIGNAL GROUND REFERENCE SUBSYSTEM (Or attach the up-to-date engineering drawings)

6. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER SIZES, TYPES AND MATERIAL AS SPECIFIED. RECORD ALL DEFICIENCIES.

7. CHECK ALL SIGNAL GROUND COMPONENTS FOR PROPER CONNECTION, BONDING, AND CONTINUITY. RECORD ALL DISCREPANCIES.

8. GROUND RESISTANCE MEASUREMENTS (Use double balanced dc bridge for all joint connectors)

DA FORM 7452-3-R, FEB 2002 USAPA V1.00

1. FACILITY 2. DATE (YYYYMMDD)

3. LOCATION 4. INSPECTOR

File details come from the government source that posted it. Updated .