TE_5.5-002-_Chlorofluorocarbon_(CFC)_Control.pdf

PDF 9 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit C-7.5.5-002-1 Fort Benning

TECHNICAL EXHIBIT 5.5-002

CHLOROFLUOROCARBON (CFC) CONTROL

1. In accordance with EPA regulations, the Contractor shall fill out and maintain a Refrigerant Recovery and Refrigerant Usage Log for all uses and recovery of all refrigerants.

2. The Contractor shall complete and maintain an Accidental, Unintentional Venting log sheet any time a leak is discovered and when a system looses any refrigerant during repairs. The immediate notification to the KO is required upon a leak or accidental, unintentional venting.

All leaks must be repaired within 30 calendar days in accordance with 40 CFR Part 82. The Contractor shall review all recorded leaks and leak repairs on an annual basis to highlight equipment and areas requiring corrective action.