TE_5.2-017_-_Earth_Electrode_Subsystem_Checklist_For_Existing_Facilities.docx

DOCX document 20 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

TE 5.2-017

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
TE_1-011-_ASP_Identifications.xls XLS spreadsheet
TE_5.1-006_Variance_Report.xlsx XLSX spreadsheet
TE_5.2-006-_Roof_Truss_Inspection_Form.doc DOC document
TE_1-001_Fort_Benning_PRS.rtf RTF text file
TE_5.1-004_Master_Agreements_Register.xls XLS spreadsheet
TE_5.1-001-_Service_Order_(SO)_Workload_Summary.xls XLS spreadsheet
TE_5.4-006_Petroleum_Products_Issued.docx DOCX document
TE_5.4-003-_List_of_Fuel_Tanks.xls XLS spreadsheet
TE_5.2-025_List_of_Ranges,_Lighting_Protection_&_Grounding_Points.docx DOCX document
TE_5.4-002-_List_of_Emergency_Generators.xls XLS spreadsheet
TE_512_004_Work_Load_Data.xlsx XLSX spreadsheet
TE_5.2-016_-_Signal_Ground_Reference_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_5.3-001_Inventory_Of_Dining_Facility_Equipment.xls XLS spreadsheet
TE_1-013_DPW__Network_Access.doc DOC document
TE_5.12-006a_Columbarian_Numbering.doc DOC document
TE_1-009-_List_of_Restricted_Areas.doc DOC document
Technical_Exhibit_5.13-004_Deliverables_Schedule.docx DOCX document
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
Attachment_2_-_Technical_Exhibits_Listing_16-R-0012_Benning_BASOPS.docx DOCX document
Attachment_7_-_Pricing_and_Labor_Matrix_16-R-0012_DPW_Benning_BASOPS_8_Aug_17.xlsx XLSX spreadsheet
Sec_C-5.10_REMOTE_CAMP_OPERATION_MAINTENANCE__SUPPORT.docx DOCX document
Sec_C-2_Definitions.docx DOCX document
Sec_C-5.1__TECHNICAL_DESCRIPTION_OF_WORK.doc DOC document
Attachment_5_-_Cover_Sheet_Past_Performance_Questionaire_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.2_BUILDINGS_&_STRUCTURES_MAINTENANCE.doc DOC document
Technical_Exhibit_5.13-001_Chiller_Equipment.pdf PDF
TE_5.3-001-Inventory_of_Dining_Facility_Equipment.pdf PDF
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.pdf PDF
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.pdf PDF
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.pdf PDF
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
Sec_C-3_Government-Furnished_Property_and_Servicesb.pdf PDF
TE_5.7-002-_Street_Sweeping_Schedule.pdf PDF
TE_5.2-002-_List_of_Memorials.pdf PDF
TE_5.11-002-_Maintenance_Allocation_Chart.pdf PDF
Sec_C-5.2_BUILDINGS_ _STRUCTURES_MAINTENANCEb.pdf PDF
TE_5.5-003-_List_of_Building_Requiring_Changeover.pdf PDF
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.pdf PDF
TE_5.11-004-_Obstacle_and_Confidence_Courses.pdf PDF
TE_5.11-003-_Range Service_Roads _Access_Grading_prioritizat.pdf PDF
TE_5.7-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.2-006-_Roof_Truss_Inspection_Form.pdf PDF
TE_5.5-001-_Required_Scheduled_Tasks.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No: TECHNICAL EXHIBIT 5.2-017

EARTH ELECTRODE SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

1. FACILITY
2. DATE (YYYYMMDD)
3. LOCATION
4. INSPECTOR

5. SKETCH THE LAYOUT OF THE EARTH ELECTRODE SUBSYSTEM (Or attach an up-to-date engineering drawing)

6. SOIL CONDITIONS (Type)

LOAM OR HUMUSCLAYSANDGRAVEL
7. EARTH ELECTRODE SUBSYSTEM RESISTANCE MEASUREMENT
8. LAST RESISTANCE MEASUREMENT
9. MONTHS SINCE LAST RESISTANCE MEASUREMENT

COMPONENT IDENTIFICATION

10. GROUND RODS

10a. TYPE
10b. SIZE (Diameter)
10c. LENGTH
10d. PHYSICAL CONDITION

11. GROUND CONDUCTORS

11 a. TYPE
11 b. SIZE
11 c. MATERIAL
11d. PHYSICAL CONDITION

12. INTERCONNECTING CONDUCTORS

12a. TYPE
12b. SIZE
12c. MATERIAL
12d. PHYSICAL CONDITION

13. RISERS

13a. PHYSICAL CONDITION
13b. MEASURED RESISTANCE

13. GROUND WELLS

13a. PHYSICAL CONDITION
13b. MEASURED RESISTANCE

14. WEATHER CONDITIONS (At time of inspection)

WET DRY SNOW RAIN MIST

15. MEASURED TEMPERATURE
16. DAYS SINCE LAST PRECIPITATION

DA FORM 7452-4-R, FEB 2002 USAPA V1.00

File details come from the government source that posted it. Updated .