TE 5.2-017
View the file
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No: TECHNICAL EXHIBIT 5.2-017
EARTH ELECTRODE SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
| 1. FACILITY |
| 2. DATE (YYYYMMDD) |
| 3. LOCATION |
| 4. INSPECTOR |
5. SKETCH THE LAYOUT OF THE EARTH ELECTRODE SUBSYSTEM (Or attach an up-to-date engineering drawing)
6. SOIL CONDITIONS (Type)
| LOAM OR HUMUS | CLAY | SAND | GRAVEL |
| 7. EARTH ELECTRODE SUBSYSTEM RESISTANCE MEASUREMENT |
| 8. LAST RESISTANCE MEASUREMENT |
| 9. MONTHS SINCE LAST RESISTANCE MEASUREMENT |
COMPONENT IDENTIFICATION
10. GROUND RODS
| 10a. TYPE |
| 10b. SIZE (Diameter) |
| 10c. LENGTH |
| 10d. PHYSICAL CONDITION |
11. GROUND CONDUCTORS
| 11 a. TYPE |
| 11 b. SIZE |
| 11 c. MATERIAL |
| 11d. PHYSICAL CONDITION |
12. INTERCONNECTING CONDUCTORS
| 12a. TYPE |
| 12b. SIZE |
| 12c. MATERIAL |
| 12d. PHYSICAL CONDITION |
13. RISERS
| 13a. PHYSICAL CONDITION |
| 13b. MEASURED RESISTANCE |
13. GROUND WELLS
| 13a. PHYSICAL CONDITION |
| 13b. MEASURED RESISTANCE |
14. WEATHER CONDITIONS (At time of inspection)
WET DRY SNOW RAIN MIST
| 15. MEASURED TEMPERATURE |
| 16. DAYS SINCE LAST PRECIPITATION |