TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.pdf
PDF 65 KB Posted
- Attached to
- Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
- Solicitation number
- W911SF-16-R-0012
View the file
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 5.1-021
DA FORM 7452-8-R, FEB 2002 USAPA V1.00
SIGNAL GROUND REFERENCE SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
1. FACILITY 2. DATE (YYYYMMDD)
3. LOCATION 4. INSPECTOR
5. SKETCH THE LAYOUT OF THE EXISTING SIGNAL GROUND REFERENCE SUBSYSTEM OR ATTACH AN UP-TO-DATE ENGINEERING
DRAWING
6. VISUALLY INSPECT THE EXISTING SIGNAL GROUND REFERENCE SUBSYSTEM FOR SIGNS OF DETERIORATION, BURNING, CORROSION, OR DAMAGE. RECORD ALL DEFICIENCIES.
LOCATION GROUND COMPONENTS DEFICIENCIES
7. CHECK THE CONTINUITY OF THE GROUNDING CIRCUITS. CHECK ALL CONNECTORS, JOINTS, BONDS, AND FITTINGS FOR PROPER
INSTALLATION, CRACKS, AND TIGHTNESS. RECORD ALL DEFICIENCIES.
LOCATION DEFICIENCIES
8. MEASURE THE RESISTANCE BETWEEN CONNECTORS, JOINTS, BONDS, AND FITTINGS USING DOUBLE BALANCED DC BRIDGE.
RECORD ALL MEASUREMENTS.
LOCATION CONNECTIONS RESISTANCE
9. MEASURE THE EARTH TO GROUND RESISTANCE OF THE SIGNAL GROUND REFERENCE SUBSYSTEM USING THE FALL OF POTENTIAL
METHOD. RECORD THE MEASUREMENT.
RESISTANCE ________________________________________________________