QUESTIONS - ANSWERS - COMMENTS.pdf

PDF 216 KB Posted

Attached to
Pack / Deliver Office & Household Goods (Springfield, MA -to- West Point, NY / Bethlehem, PA)
Solicitation number
W911SD24R0080
Issued by

About this file

This document includes a solicitation for packing, moving, transporting, and delivering office and household goods between locations in Springfield, MA, West Point, NY, and Bethlehem, PA. Vendors must be able to provide all necessary labor, materials, equipment, and transportation to complete the one-time move between March 18th and April 17th, 2024. The solicitation details an estimated 710 linear feet and 21,300 pounds of file cabinets, books, and maps to be packed and delivered. Responses are due by March 6, 2024. Vendors must submit a capability statement and signed SF1449 form with their quote to be considered, and provide pricing on the unit and total costs to complete the move. The NAICS code for this requirement is 484210 with an SBA size standard of $34 million.

View the file

Other files

File Type Posted
QUESTIONS - ANSWERS - COMMENTS (revised MAR 13).pdf PDF
PICTURE 1.JPG JPG image
PICTURE 4.JPG JPG image
PICTURE 5.JPG JPG image
QUESTIONS - ANSWERS - COMMENTS (revised MAR 12).pdf PDF
PICTURE 3.JPG JPG image
PICTURE 2.JPG JPG image
SOLICITATION W911SD24R0080 (SF1449).pdf PDF
SOLICITATION W911SD24R0080 (SF1449).docx DOCX document
SOLICITATION W911SD24R0080 (SF1449).docx DOCX document
SOLICITATION W911SD24R0080 (SF1449).pdf PDF
SOW (Statement of Work) (revised).pdf PDF
SOLICITATION W911SD24R0080 (SF1449 and SOW).docx DOCX document
SOLICITATION W911SD24R0080 (SF1449 and SOW).pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS / ANSWERS / COMMENTS

1. How many laborers are going to be needed?

The vendor needs to decide this based on the information in the Statement of Work (SOW).

2. Will File Cabinets need to be emptied into cartons?

No, the material needs to stay in the drawers of the cabinet. If the drawers need to be removed to move the cabinet, then is fine as long as the material stays in the drawer.

3. Are Contractors expected to provide tubes for maps, totes, and boxes / cartons?

Yes, as per the SOW, the vendor shall provide all necessary materials.

4. What access will be made available at the West Point / Bethlehem locations?

As per the SOW, the vendor will have access to the loading areas at West Point and Bethlehem. They do not have loading docks, so the vendor will need to provide lift gates to move the material in and out of the truck.

5. What kind of personnel (professional, technical, laborer, etc.) does West Point want for this project?

The vendor needs to decide this based on the SOW.

6. West Point requested this be a “one-time” run with no stops / interchanges in between. Therefore, how many hours are going to be assigned for each person?

The vendor needs to decide this based on the SOW – and – the mileage between the locations.

7. What type of vehicle(s) and / or equipment are going to be needed?

The vendor needs to decide this based on the SOW. The only equipment the library knows they will need is a lift gate to load and unload material. Everything else will be based on what the vendor determines for use.

8. How many packing supplies are going to be needed (boxes, tape, etc.)?

The vendor needs to decide this based on the info in the SOW.

9. Since you are moving from one state to another, should we include lodging expenses?

The vendor needs to decide this based on the info in the SOW. The locations for all sites are listed in the SOW.

However, the work is for a “one-time” run with no stops nor interchanges in between. Therefore, any vendor that chooses to include lodging must do so in a manner that does not go past the “one-time” run between locations as lodging will not be approved for stays at more than one location.

10. How did you calculate the 710 Linear Feet described in the SOW?

Linear feet is a standard measure for archival material and books. The estimate is from the total number of feet of shelving the books occupy.

11. Are you measuring the Cumulative Shelving Space?

Yes, the 710 linear feet is the cumulative total of the shelf space.

12. How many book shelves are in the basement?

There are 677 linear feet of books in the basement and 33 linear feet of books on the 1st floor.

13. What is the approximate weight of the books?

The approximate weight of 710 linear feet of book is 21,300 lbs.

(Continued)

QUESTIONS / ANSWERS / COMMENTS

IMPORTANT INFORMATION TO ALL VENDORS

1. Our agency does not accept bids for splitting contracts between vendors. This is strictly a FIRM-FIXED- PRICE Solicitation that has to come from ONE source.

2. Bids that do not provide the specific information listed on the posted notice are considered as “Non- Responsive” and will not considered as potential sources.

3. All vendors must provide their own data and not in “picture” format. It must be in either WORD or PDF – and – it must be complete, not snippets nor snapshots.

4. Signatures on the SF1449 must be either DIGITAL (Common Access Card) – or – Handwritten; not typed nor “painted” using MS paint-writer.

5. Complete information that’s requested regarding your own SAMs registration is mandatory. It cannot be someone else’s info.

6. Your company must also be registered in PIEE / WAWF to participate in this project (that’s why you must also be fully registered in SAMs).

7. Your own company quote document – and – the Standard Form 1449 must be completed and submitted as part of your overall bid.

8. Your own company quote must contain a basic Cost Breakdown of what you plan on charging for and how much for each.

9. Do not submit bids unless you provide a COST BREAKDOWN to go with it.

10. Pictures, snapshots, nor screenshots are allowed as so-called proof or as “capability statements”.

11. Generic statements from Comment Section is not proof of capabilities. Capability Statements will be vetted. Generic statements will cause your bid to be listed as “Non-Responsive”.

12. FAIR WARNING… Do not submit bids that are under the normal industry standard for competition. Your bid must be well within the normal industry standard for it to be considered for competition. We are well aware of the average cost assessments for projects of this nature in our area. Therefore, submitting bids that are really low just for the sake of being selected as the lowest bid could be considered as fraud and will be reported to the Small Business Administration for investigation. Bid fairly and within reason.