W911SD-23-R-0051-0004 _Admin MRJ Questions Answers.pdf

PDF 101 KB Posted

Attached to
Cloud Base MRJ Manuscript Management Platform Base+2option Years
Solicitation number
W911SD23R0051
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

1. Which pages from W119SD are required when we submit this bid?

A. You need to submit the entire document. Returned can be emailed or mailed to arrive before the closing of the solicitation. The returned document needs to be signed, all required sections filled out, including your quote along with data sheet (of your specifications/capabilities for your MRJ product) to be compared with our PWS.

2. *Pages 28‐30 look to be where we indicate pricing. Can this information be submitted in another format?

A. Pricing is on page 17, for clin 0001. However, if you wish to give a breakdown of your pricing on a separate data sheet with your specifications this will be acceptable.

3. *Starting page 37 there look to be blanks that we need to complete. Would you like only these pages submitted or are we required to also include the pages that do not indicate any response?

A. You are required return the document in it’s entirety to include this Q&A page and signed.

4. I am working with a subcontractor for the Cloud Based job posted on Sam and was trying to inquire about the payout. I could have missed it but I did not see the way this contract would be paid out. I ask because I would like to submit a quote as close to accurate as possible.

A. This is a base plus two option years; the option years will depend on availability of funds. The Payment system used will be WAWF, please refer to clause “252.232-7006 WIDE AREA –

WORKFLOW PAYMENT INSTRUCTIONS”.

File details come from the government source that posted it. Updated .