W911SD-22-R-0080 Solicitation AMENDED DRAFT Final FY 22 GRAD Liginting.pdf
PDF 154 KB Posted
- Solicitation number
- W911SD-22-R-0080
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011759313
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the PWS, no other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SD22R0080
X 9B. DATED (SEE ITEM 11)
30-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2022
CODE
MICC - WEST POINT
681 HARDEE PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SD22R0080
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
PWS
Performance Requirement
2022 USMA Graduation Audio, Video Lighting Requirement
LOCATION
Graduation ceremonies will be held at the Michie Stadium football field complex.
DATE
Graduation will be held 21 May 2022
TIME
Graduation will commence promptly at 9:00 a.m.
REQUIREMENT
To provide a complete primary sound reinforcement system independent of the stadium’s existing sound system intended for football game support, provide broadcast television dais lighting system.
The contractors sound system shall include all microphones, stands, cabling, amplifiers, sound mixing boards, equalizers, delays, loudspeakers, equipment stands, loudspeaker stands, weather protection, audio distribution amplifiers, press and media audio feeds 40, microphone splitters, ground lifting devices, hum elimination devices, and equipment operator(s). The system shall incorporate the appropriate time alignment and equalization to provide undistorted sound covering the seating areas to be described. The system shall provide adequate power to and be able to achieve a minimum of 90 dB SPL (C-weighted), There shall be no more 3DB variation in the 60-8Khz frequency range throughout the coverage areas described below. The system shall remain operational for 90 minutes after the release of the graduates. All contractor owned and provided equipment shall be removed NLT 6:00 p.m. on May 21, 2022. The contractor shall incorporate a means of redundant sound reinforcement should a failure of the contractor’s primary equipment components occur. The Dais Lighting system shall be provided and operational in accordance with specifications detailed within this statement of work. The contractor shall take necessary precautions to protect the turf surface, all cabling crossing the field must be ramped and not pose a hazard. All specifications to perform this contract are detailed below.
1. Areas of audio coverage
A. The system shall provide full coverage for the following seating areas: Section 2 in the south end zone thru section 23 in the north end zone also to include the upper seating areas in front of, and adjacent to the Hoffman Press Box, the seating area for the graduating class, and the Gate 1 and Gate 3 staging area for the Graduating Class to receive instructions. In addition to the above the entire dais will also require audio coverage.
2. MICROPHONES
The podium (provided by USMA) will require 2 microphones arranged in a side-by-side configuration. Subject to change to a single mic set up if required by academy P.O.C. Recipient name announcement microphones on the dais will be required, 2ea will be setup to the left of the podium, on floor stands, microphones arranged in an over/under configuration. 2 wireless lavalier microphones 1 for the cadet charged with dismissing (1St Cpt) the graduating class and 1 for the class President for the class gift presentation. 2 wireless lavalier (same type as main) microphones will be required as back up microphones in the event of a wireless failure. 1 wireless Combo system with handheld and lavalier to be used as needed by the academy. A shotgun mic shall be set up centered on the back side (front barrier) of the downstage ramp to provide audio coverage of the commandant speaking.
The West Point Band and choir will require sound reinforcement and will be part of the final mix. The band and choir are typically located on the northern periphery of the dais but this is subject to change and may require additional cable length.
The band requires a minimum of 16 microphones and the choir requires a minimum of 8 microphones for a total of
24. Condenser mics may be used but in the event of rain dynamic mics MUST be used. Contractor shall provide all necessary microphone stands, booms, and cabling. 4 Additional audio lines are required for backstage announce and playback.
3. LOUDSPEAKERS
Loudspeakers shall be arranged so as not to obstruct the view of the graduating class from the seating areas. The contractor shall make provision to eliminate feedback for all sound support areas. Loudspeakers will be provided for general guest seating areas, including the upper seating area at Michie Stadium, graduating class seating on the field, stadium gate 1 located at the southeast corner, gate #3 at the northeast corner of the field, and dais monitor speakers. 2 additional speakers shall be set up in the backstage area with a full program mix. The contractor shall provide all cabling. The contractor shall take necessary precautions to protect cabling and cabling shall not pose a hazard. The contractor shall take all necessary precautions to protect the turf surface; where equipment will be placed or used on the field. This is to include protecting the turf during set up and removal of all equipment. Any equipment and materials needed for set up and removal (such as forklifts plywood etc.) shall be provided by the contractor.
4. ANCILLARY AUDIO FEED(S)
The contractor shall provide 1 ea. primary line balanced level feed (+4dB / 0Vu) and 2 ea. redundant balanced line level feeds of the final mix to the USMA television production system. Connections to the system will be made through the DPTMS television cameras in the following locations, (1 each), center press stand, stage left and stage right. The contractor shall provide press feeds for 40 positions, the feeds shall be –60dB balanced microphone level.
All feeds shall be free and clean of any noise, hum, or buzz. The contractor shall provide a 2-channel intercom communication capability (clear- com) to interface to the USMA Stadium intercom and provide intercom stations at the sound mixing location and up to 3 other location(s) to be determined by security personnel. The contractor shall provide all cabling. The contractor shall take necessary precautions to protect cabling and cabling shall not pose a hazard. The contractor shall take necessary precautions to protect the turf surface, cabling shall not pose a hazard.
5. DAIS.
The dais will be setup at the 50-yard line on the east side of the stadium and the dais access ramps will extend from the 0 yd line and continue towards the south end zone seating area. The dais will be setup by USMA engineers. A podium on the dais will be provided by USMA.
6. DAIS LIGHTING
Provide adequate lighting for live broadcast to minimize flash photography. The lighting instruments shall be as inconspicuous as possible and may be mounted to the structural cross members supporting the canopy. The entire stage area will be lit, not spot lit, to include the walk in ramps ( a full stage wash ). Provide lighting instruments located near the northwest side 20-yard line and the southwest side 25 yard line. The lighting shall be of sufficient strength to illuminate the dais from behind the press platform. The lighting shall be sufficient to provide soft fill lighting on the speaker(s). All lighting shall be color corrected for ambient lighting and require HMI lights Example (ARRI Daylight 18/12) with a 5600 degree color temp. The stage wash shall provide an even wash with no more than 20fc change from stage right to stage left. Back lights shall use barn doors to prevent flares in the video shot from the main press riser, they shall be focused on the speakers shoulders at the lectern and diffused. All lighting instruments cannot interfere with still photography, or television camera ability to document the ceremony. The contractor shall take necessary precautions to protect the turf surface, cabling shall not pose a hazard.
7. POWER
The contractor shall provide a generator capable of powering the sound reinforcement equipment and lighting systems. The generator should be movie quiet or equivalent as to not disturb the ceremony. The generator shall be located outside the stadium near gate #1; however, this may be subject to change due to security requirements. The contractor shall provide all electrical cabling from the 400 AMP main panel in the stadium as well as from the back up generator including electrical pigtails required to connect to the power mains. The contractor shall also provide all temporary power distribution panels and all power cables required to operate contractor furnished equipment.
8. TECHNICAL SUPPORT
The contractor shall provide on-site technical support in addition to operator personnel. The contractor shall provide to the PAO/VI POC (point of contact) all AC power requirements for complete system operation. The contractor shall provide to the PAO/VI POC frequency and operating power of all 2-way radio equipment utilized in the performance of the requirement. 2-way radio communication will not interfere with the contractor’s primary sound reinforcement system or the existing stadium system.
9. PERFORMANCE TIMELINE
The contractor shall provide a plan indicating the location of equipment, speaker locations NLT (no later than) April 25, 2022 for review and consideration. The system shall be installed, fully operational and ready for performance review by 1530 on May 18, 2021. The contractor shall provide personnel for the purpose of operational testing, graduation rehearsal, and system check by academy personnel by 5:30 a.m. on day of rehearsal between May 19 and 20, 2022. Graduation rehearsal will begin at 0600. The contractor shall provide all personnel required for the operation, setup, testing, and removal of the contractor’s system and equipment. The contractor’s personnel must be on station from 4:00 a.m. May 21, 2022 and remain on station until 90 minutes after release of the graduating class. It shall be the responsibility of the contractor to obtain lodging, if necessary, for the contractor’s personnel.
10. CONTRACTOR PERSONNEL
The contractor shall provide a list of employees participating with the setup, operation, and breakdown of the provided audio system. The list shall include the employee’s full name, social security number, birth date, city, state, and country of birth, and permanent/temporary job status with the company.
11. GOVERNMENT PROVIDED
The government shall provide 400 AMP, 3 phase electrical service for contractor provided sound reinforcement and lighting equipment. The government shall provide electricians to connect and disconnect contractor provided cables to electrical panels.
IMPORTANT NOTE:
Due to the urgency of this requirement – no quotes received after the closing date and time of this solicitation will be accepted or considered. If a site visit is needed you must request one through MICC -no later than 4:30 p.m.
Monday, -- March 29 2022.
INCLEMENT WEATHER:
Contractor shall provide cover as needed for their equipment in the event of inclement weather this is a rain or shine event.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .