W911SD22P0087 - KTR SIGNED.pdf
PDF 1 MB Posted
- Attached to
- Solicitation - Off Post Grass Cutting at the USMA Federal contract opportunity
- Solicitation number
- W911SD22P0087
About this file
This service contract award notice provides landscaping services in support of the West Point Military Complex. Reliable Building Services, Inc. was awarded a firm fixed price contract totaling $1,759,488 to provide supervision, personnel, labor, expertise, tools, equipment, and supplies for grounds maintenance activities including mowing, trimming, and debris removal of improved, semi-improved, and unimproved areas. The contract period is one base year from April 28, 2022 through April 27, 2023. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis is the contracting agency.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF231
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 30 - BLOCK 14 CONTINUATION PAGE
WAGE DETERMINATION
US DOL EMPLOYMENT STANDARDS
Department of Labor Wage Determination #2015-4159 Rev 19, dated 26 April 2022 is incorporated into this solicitation and is available at http://sam.gov/.
QUESTIONS AND ANSWERS
Questions and Answers
1) PWS 2.2.1 Are the refuse containers provided by the government? Yes. Referring To Either The Ranges Or The Camps. As It Says, In Other Places It May Be More Practicable To Have A Bag In Their Truck For Litter And Dispose Off Site Later. Litter Typically Not A Big Issue.
2) What is the size of the government-provided storage area for the contractor’s equipment? Let me get back to you on this. Also, a storage area will be determined after award.
3) PWS 11.0 The Capability Level exhibit cuts off @ Capability 3 is there any information missing? I don't think so. It's my understanding that 3 is the lowest level. Anyway we are directed to be at 3 so any other levels are not applicable.
4) Are the fall leaf clean-ups considered part of the cycles listed in TE2? Clean up of the camps are conducted in the spring (see pws 2.2.8). Dpw has already executed this.
Section SF 1449 - CONTINUATION SHEET
PERFORMANCE WORK STATEMENT
1.0 General Information
1.1 Overview
The Contractor shall inspect, service, maintain, and landscape the "off-post" grounds of the West Point U.S.
Military Academy (USMA). The work shall include scheduling and performance of mowing and trimming; and leaf and debris removal, as directed by the Contracting Officer's Representative (COR) or Alternate Contracting Officer's Representative (ACOR). The Contractor shall provide all work necessary to maintain the grounds to the standards specified herein.
2.0 Description of Services
2.1 Scope
The Contractor shall provide Grounds Maintenance for all High Visibility (Improved Grounds), Common Areas (Semi-Improved Grounds), and Ranges. The Contractor shall ensure all work accomplished maintains and presents a healthy, clean, neat, and professional appearance to all grounds included and covered by this contract in support of mission requirements for users, residents, and visitors. The Contractor shall mow grass only when the minimum height is reached or exceeded as indicated by the Work Capability Levels (WCL) table in paragraph 3.0 (WCL assigned to West Point is Capability Level 3). The Contractor shall set the mower height to three (3) inches for all areas. The assigned Contracting Officers' Representative (COR) will develop the weekly cutting schedule ICW installation stakeholders (i.e., DMI, Range Branch, ITAM, DPW, and DFMWR) and the Contractor's Representative (CR).
Improved, semi-improved and un- improved areas shall be maintained IAW mission requirements and reflected in the weekly cutting schedules. During Cadet Summer Training (CST), the CR may be required to shift efforts from one facility or area that was scheduled, to an unscheduled facility or area to support the CST training mission.
Mowing operations shouldn't interfere, delay or cause the cancellation of any required training activities. Refer to Technical Exhibit (TE) 1: Specific Features and Requirements for more detailed instructions on areas to be cut. All work shall be performed by personnel qualified in accordance with (IAW) applicable laws, regulations, and TE-1.
TE-2: Cutting Cycles, Ground Types, and Acreage identifies facilities and areas which require landscaping support, denotes allocated cycles (i.e., cuts) per facility and/or area, and includes acreage to be cut.
Work begins on 28 April of each year and ends 27 April the following year. Outside of weather related delays or training schedule conflicts, begin contract operations within five working days of the contract start date. It is the Government’s intent to award a Firm Fixed Price (FFP) Service Purchase Order with four (4) option periods.
2.2 Mowing High Visibility Areas
Developed areas of the installation that require an intensive level of maintenance (approximately 28.75 acres, see TE- 2 and TE-3). The work performed in these areas by the Contractor shall include mowing grass, edging and trimming grass, and removing grass trimmings from paved areas. The Contractor shall mulch mow the grass and remove visible grass clippings after mowing, before leaving the work area. Paved areas and walkways shall be free of lawn clippings/debris the same day the mowing is performed.
2.2.1 Mowing (All Areas)
The Contractor shall remove trash, litter, tree limbs, debris, etc., prior to mowing. Trash/litter shall be deposited in on-site refuse containers, or transported off-site if more practicable. Downed tree limbs shall be removed to the nearest wooded area. The lawn shall be uniform in appearance, free of skips, gaps, rutting, or scalping. The Contractor shall be responsible for any damage incurred as a result of grass cutting operations. The Contractor's equipment shall be removed from the areas being mowed at the completion of each cycle. Equipment failure shall not alleviate the contractor of completing the work within the scheduled time. Equipment awaiting repair may be removed to the Government provided storage area, within twenty-four (24) hours of breakdown. If storage area is not provided, the Contractor shall remove equipment off the military reservation within twenty- four (24) hours of breakdown.
2.2.2 Edging
N/A
2.2.3 Trimming
The Contractor shall, in conjunction with grass cutting, trim grass and weeds around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and all other fixed objects that project above the ground so grass height is maintained consistent with adjacent grass. Additionally, the Contractor shall cut vegetation to include vines, brush, small trees and other volunteer plants which grow adjacent to obstacles such as building walls, foundations, retaining walls, signs, fence lines, playground equipment and trees. The Contractor shall remove all trimming debris from sidewalks and driveways on the same day trimming is performed.
The Contractor shall repair any damages to trees and shrubs caused by trimming. If a plant damaged by trimming dies or becomes unhealthy, the Contractor shall replace the damaged plant with a plant of the same size and type at no additional cost to the Government. The Contractor shall provide a one (1) year warranty on all replacement trees and shrubs. Tree and shrub replacements shall be performed within fifteen (15) days of the date the Contractor is notified to replace the plant.
2.2.4 Fertilizing and Liming N/A
2.2.5 Seeding and Sodding N/A
2.2.6 Maintain Flower Beds N/A
2.2.7 Weed Control
2.2.8 Remove Debris, Leaves, and Litter
The Contractor's responsibilities shall include, but not be limited to, the removal and disposal of all natural debris, (e.g., tree limbs, rodent habitats, etc.) litter, and trash. Leaves shall be removed from High Visibility Areas IAW the Work Capability Levels table. Organic debris such as leaves, grass clippings, tree fallen tree branches, and pine straw shall be collect and disposed off-post.
The Contractor shall perform spring cleanup of Camps Buckner and Natural Bridge. Contractor shall remove leaves and debris accumulated over the winter months to an off post location. Contractor shall perform initial cleanup operation between NLT 28 April-15 May of each year. Additional guidance is provided below:
a. Camp Buckner: All improved cutting areas around buildings, under buildings that are sited on raised piers, roadways, and beach where leaves accumulate. LZ Owl and Parade Field do not have sufficient leaf accumulation to warrant removal.
b. Camp Natural Bridge: All improved cutting areas around buildings, under buildings that are sited on raised piers, and roadways where leaves accumulate.
2.2.9 Service/Maintain Trees
2.2.10 Hedge and Shrub Maintenance
2.2.11 Irrigation
2.2.12 Service/Maintain Xeriscape Areas
2.2.13 Athletic Fields Grounds Maintenance
2.2.14 Special Services
The Contractor shall provide additional services as necessary due to unforeseen circumstances, including but not limited to, Very Important Person (VIP) visits, retreats, ribbon cutting ceremonies, and open houses. The COR/ACOR will notify the Contractor of special service requirements NLT forty-eight (48) hours prior to the event. The Contractor shall coordinate special service requirements with the existing grounds maintenance schedule. Upon receiving direction from the COR/ACOR, the Contractor shall complete work prior to the event. In the event the Contractor must deviate from their schedule to meet special event requirements, the Contractor shall do so at no additional cost to the Government. The Contractor shall be authorized/entitled one (1) additional duty day to return to their normal operations. Furthermore, the Contractor will not be held accountable for any unsatisfactory performance results, on a quality assurance inspection or complaint, due to KO-directed schedule change(s), until such point when the Contractor resumes normal operations.
2.3 Service Common Areas
2.4 Service Fire Breaks and Ranges
2.5 Service Unimproved Areas
2.6 Service Specialized Locations
2.7 Other Special Services
2.8 Special Equipment Requirements
a) All rotary mowers used within High Visibility Areas shall be equipped with mulching blades and have discharges blocked.
b) Contractor-furnished tools and equipment shall be of a type designed for the intended use to perform this contract and shall be kept in a safe and operable condition at all times. The Contractor shall maintain equipment safety devices such as safety shields and deflectors on all rotary mowers, filament line trimmers and edger's to deflect objects struck by the blades or lines. The Contractor shall submit a complete equipment list including make, model, specifications and catalog cut sheets for KO approval with the proposal.
c) All equipment used to perform grass mowing and leaf removal operations on High Visibility Areas shall be equipped with turf type tires. Equipment not essential for the performance of grass mowing or leaf removal functions (e.g., equipment with agricultural tires, wheel weights, snow blades, or other accessories that may damage turf or tree root zones by compaction, rutting, or scalping), shall not be permitted on High Visibility Areas.
d) Contractor shall possess equipment, or possess funds to rent equipment, which is capable of mowing grass 1 foot high or higher, without causing a delay in performance
e) All self-propelled equipment, which includes, walk behind mowers, riding mowers, tractor drawn mowers and leaf vacuums shall have a fully charged, certified and operational two (2) pound (minimum) Type ABC, Dry Chemical, fire extinguisher bracketed and installed on them in accordance with Occupational Safety and Health Administration (OSHA) regulations.
f) The Contractor shall provide and shall use safety shoes or boots, ear plugs, hard hats and eye protection when operating tractors, power mowers, trimmers, and other powered equipment. Contractor's employees who operate hand and power equipment shall wear fluorescent colored safety vests.
g) The Contractor shall furnish at government provided storage area a metal two foot by two foot (2'x 2') black on white sign indicating contractor's name, and phone number. Sign shall be free standing or attachable depending on type of storage area provided.
3.0 General Information
3.1 Service Hours
All services shall be performed on weekdays during normal duty hours Monday- Friday/0730-1600 and/or weekends when areas are not in use. Occasionally, service hours will not necessarily be the same as normal Government duty hours. The Contractor may be required to work on Federal Holidays.
3.2 Government Rescheduling
The Government reserves the right to reschedule certain areas for grass cutting, on specific days to accommodate special events, such as exercises conducted at the camps, ranges and training sites. The Contractor will be given at least 24 hour notice.
3.3 Contractor Representative
The Contractor shall designate in writing, to the Contracting Officer, a Contractor's Representative (CR) who will be in charge of the work on behalf of the Contractor. The written designation shall be received not later than ten (10) calendar days after contract award. This representative shall direct the contractor's work force and operations in accordance with the terms of the contract.
3.4 Quality Control Plan
The Contractor shall establish and submit a complete Quality Control Plan (QCP) to ensure the requirements of the contract are provided as specified. Two (2) copies of the Contractor's QCP shall be submitted to the Contracting Officer, within fifteen (15) calendar days after contract award and shall include:
a. An inspection system covering all the services in the specific tasks to be performed within the contract. It must specify areas to be inspected, type of inspection to be performed, and frequency of inspections.
b. A method of identifying deficiencies in the quality of services performed before the level of performance becomes other than satisfactory.
3.6. Quality Control Records
A record of all inspections conducted by the Contractor's Quality Control Representative and the corrective action taken.
These records shall be made available to the Government during the term contract.
4.0 Government-Furnished Property
There will be no government property furnished to the Contractor.
5.0 Security Requirements
Contractor personnel or any representative of the Contractor entering the West Point training complex shall abide by all security rules and regulations.
5.1 Vehicles
Make, model, color and associated license plate information to the COR within five days of contract award and within one day of any changes to the list through contract period of performance. The Contractor Project Manager will maintain a current list of all vehicles and individuals that will perform service to the training barracks. "Off-post" work does not require a contractor visitor pass from the Visitor Center.
5.2. Personnel Background Check
Within five workdays after contract award the Contractor shall submit to the Contracting Officer, COR and ITAM Program Coordinator/DPTMS a comprehensive personnel listing of all individuals who are expected to have access to Camp Natural Bridge and Camp Buckner during the contract performance period. The Contractor will complete USMA Form 13-16 including all names, social security numbers, and birth dates; City/State/County of birth and signatures of Contractor personnel performing under this contract. The Directorate of Emergency Services will perform a criminal records check on all proposed Contractor employees and provide an approval or disapproval to the Contractor within two business days. The Contractor may not add or replace personnel on the contract without first providing required information to and receiving approval from Directorate of Emergency Services through the West Point Visitor Control Center, Building 2107, West Point Highway, West Point, New York 10996. Commercial phone number is (845) 938-0390.
5.3. Physical Security
As applicable, the Contractor shall safeguard all Government property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
5.4. Search and Seizure
Contractor personnel and property shall be subject to search and seizure upon entering West Point and upon leaving West Point.
5.5. Key Control
The Contractor shall establish and implement methods for ensuring that all of the Contractor's keys issued by the Government or keys issued to the Contractor's employees are not misused, lost or misplaced, and are not used by unauthorized persons. The Contractor shall report the loss of any Government issued key to the Contracting Officer immediately. All keys lost by the Contractor, or by Contractor employees, will be replaced by the Government, however, charges incurred by the Government for replacement of the keys will be deducted from money due the Contractor.
One key is required for contract performance: the key to the Class IV yard gate where Contractor equipment has historically been stored. The COR will be responsible for signing out this key from Range Control and providing to the Contractor as needed (i.e., for the duration of each year's PoP).
6.0 Personnel
The Contractor shall provide employee(s) possessing the necessary skills, knowledge, and training to satisfactorily perform administration, operation, and maintenance services required by this contract.
6.1 Company Personnel
The Contractor personnel performing work under this work statement shall remain employees of the Contractor and will not be considered employees of the Government and shall be under the supervision and control of the Contractor.
ALL Contractor personnel performing work under this PWS shall be able to communicate fluently in English both written and verbally.
6.2 Company Vehicles
The Contractor company vehicles will be suitably marked with company name, logo, and phone number.
6.3. Site Manager or CR
The Contractor shall provide a site manager or CR (i.e., if they're different people) who shall be responsible for the oversight of the contract requirements by Contractor personnel. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer. The site manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The site manager must have demonstrated experience as a direct supervisor of personnel.
6.4 Compliance with Security Regulations
All personnel employed by the Contractor in the performance of this contract or any representative of the Contractor entering the Government reservation shall conform to all security regulations which may be in effect during the contract period, and shall be subject to such checks as may be deemed necessary to assure that no violations occur. No employee will be permitted on the installation when such a check reveals that his presence would be detrimental to the security of the installation or the accomplishment of the work. The Contracting Officer will require the Contractor to remove any employee for security and misconduct reasons.
6.5 Appearance and Identification of Contractor Employees
Contractor personnel shall present a clean, neat and well-groomed appearance and be easily recognized. All Contractor personnel shall be identifiable by wearing a clearly readable identification badge, furnished by the Contractor, which contains the Contractor's company name, employee's name, and current/recent picture, as a minimum. Items of military apparel shall not be worn by Contractor's personnel while performing duties under this contract.
6.6 Conduct of Personnel
The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be under the influence of alcohol, drugs, or other incapacitating agents. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary in the interest of the Government. In accordance with (IAW) Joint Ethics Regulations, DOD 5500.7-R, and 18 U.S.C. 1382 (1972), the Garrison Commander has the authority to bar individuals from the installation. The removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement of providing sufficient personnel to perform the services as required by this contract. Contractor personnel who enter the installation shall obey Government rules, regulations, directives and requirements that are in effect or issued during the contract term governing law and order and administration and security on the installation.
All questions regarding the above will be directed to the Mission Installation Contracting Officer (KO). The KO may require the Contractor to be remove from the job site any employee working IAW this contract for reasons of misconduct, security, or suspected or found to be under the influence of alcohol, drugs, or other incapacitating agent.
Contractor employees shall be subject to dismissal from the premises, upon determination by the KO that such action is in the best interest of the Government. The KO has the authority to bar individuals from the Installation Commander installation. Such removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide the services as required by this Statement of Work.
6.7. Conflict of Interest
The Contractor shall not hire any person who is an employee of the United States Government if the employment of that person would create a conflict of interest for the Contractor or employees. The Contractor shall not employ any person who is an employee of the Department of the Army, either military or civilians, unless such person seeks and receives approval in accordance with DOD Directive 5500.7 and AR 690-1 for Civilians and Military Personnel.
6.8. Smoking
The Contractor shall comply with the DOD policy and Regulations on smoking which establishes uniform policies governing the use of tobacco products on Government real property. At no time will smoking be permitted while Contractor is in performance of their duties.
7.0 Health and Safety
The Contractor shall be fully responsible for and shall assume all liability for compliance with all applicable regulations pertaining to the health and safety of personnel during execution of work. The Contractor shall hold the Government harmless for any action on its part or that of its employees, subcontractors or Contractor's representatives, which results in illness, injury, or death to anyone at West Point. The Contractor is solely responsible and liable for, following all applicable Federal, Department of Army, West Point and State of New York mandates and guidelines;
and ensuring safe work and otherwise safe actions, behavior, and conduct of employees.
7.1. Occupational Safety and Health
The Contractor shall comply with the Occupational Safety and Health Act (OSHA) rules and regulations (http://www.osha.gov). The Contractor shall be responsible for ensuring adherence to all applicable State of New York and Federal rules and regulations. The Contractor shall provide all Personal Protective Equipment (PPE) for Contractor personnel in accordance with 29 CFR 1910, Department of Labor, Occupational Safety and Health, SUBPART I, that are required to meet the terms of the contract.
7.2. Fire Protection
The Contractor shall comply with AR 420-1 Army Facilities Management; UFC 3-600-01, 2006 edition (Fire Protection Engineering for Facilities) and with all applicable National Fire Protection Association (NFPA) codes.
7.3 Reporting of Fire and Safety Hazards
The Contractor shall train his personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire and safety hazards and unsafe conditions to their contract manager (s). The Contractor shall immediate take corrective action to remedy all deficiencies within the appliances or installation of the appliances, in addition to any deficiencies that the COR identifies.
7.4. Accident Reporting
The Contractor shall comply with AR 385-55 and AR 385-10 and maintain an accurate record of accidents resulting in injury or death and accidents resulting in damage to government property, supplies, and equipment. The Contractor shall immediately report vehicle accidents that occur on West Point property to the West Point Directorate of Emergency Services by dialing 911 for emergencies. Additionally, the Contractor shall notify the CO and COR within 24 hours. Accidents involving serious injury or death shall be reported within 6 hours.
7.5. Damage to Government Property
The Contractor shall be held liable for damage to or destruction of Government property (e.g. buildings, vehicles, sidewalks, headstones, etc.) caused by the Contractor; Contractor personnel; or representatives of the Contractor in the performance of services in this contract.
7.6. Damage to Privately Owned Property
The Contractor shall be held liable for damage or destruction of privately owned property (e.g. privately owned vehicles), as defined in this PWS, caused by the c Contractor; Contractor personnel; or representatives of the Contractor in the performance of services in this contract. The Contractor shall take corrective action in a reasonable amount of time to repair damages or replace destroyed property.
7.7. Damage Reports
The Contractor shall submit a damage report to the Contracting Officer and designated representative within two workdays of damage or destruction to Government property or privately owned property caused by the Contractor;
Contractor personnel; or representatives of the Contractor. The damage report shall detail the facts and the extent of damages or destruction and the corrective action taken by the Contractor to repair damages or replace destroyed property.
7.8. Unexploded Ordinance (UXO)
Due to decades of discharge of military ordnance and munitions on the ranges and in the training areas, it is imperative that all Unexploded Ordnance (UXO) be left alone. All UXO, once found, must be reported immediately to Range Operations Headquarters, Building 1403, NYS Route 293. The Government (i.e., Range Operations Branch) will brief contractor on identification of UXO, before the Contractor starts work. Within five days after start date, the Contractor shall submit to the Contracting Officer, for approval, a plan to ensure all employees are aware of and familiar with the UXO hazard.
8.0 Contract Administration.
8.1. Type of Contract
The government will award a Firm Fixed Price contract for the described services.
8.2. Invoices
The Contractor shall submit payment requests using Wide Area Work Flow (WAWF). All invoices will be prepared, dated, and submitted into WAWF within 10 working days after the last day of the month. Information regarding WAWF is available on the internet at https://wawf.eb.mil.The Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests. Payment will be made in accordance with the Prompt Payment Act. Invoices will be paid less any deductions pending from services not received in accordance with Government Receiving Reports.
8.3. Post Award Conference/Periodic Progress Meetings
The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
9. Applicable Documents.
9.1. Documents applicable to this contract are listed below. These documents are mandatory and the contractor shall be obligated to follow these while performing under this contract. The following documents are available for review at the COR's office or as stated below.
9.1.1. U.S. Army Corps of Engineers Safety and Health Requirements Manual EM-385-1-1.
9.1.2. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 - OSHA Safety and Health
Standards.
9.1.3. Application for copies should be addressed to the Superintendent of Documents, U.S. Government
Printing Office, Washington, DC 20402.
9.1.4. United States Military Academy Site Protection Specification (USMA-SPS, Rev. 1/93).
9.1.5. Guide For Plant Appraisal, 8th Edition, Council of Tree and Landscape Appraisers, publisher:
International Society of Arboriculture. Available for review at Agronomist's office.
9.1.6. Joint Ethics Regulation DOD 5500.7-R.
11.0 Work Capability Levels.
PERFORMANCE REQ SUMMARY
Performance Requirement Summary
Performance Objective (from PWS Section 2)
Performance Standard Acceptable Quality Level
Method of Surveillance
I
Incentive / Disincentive
Mow/Trim Grass in Improved Areas
Grass shall be maintained to a height of 3" and cut/trimmed when height exceeds 6" or as required.
No more than 25% of total facility and/or area should exceed 6" during random sampling.
Random Sampling and Customer Complaints
Outstanding performance denoted in monthly status report.
Excessive grass clippings and clumps shall be removed or dispersed so as not to be visible when mowing is complete. Grass clippings shall be blown from pavement, sidewalks.
Substandard performance will also be denoted in the monthly status report, and possibility of funds withheld until deficiency is corrected.
"Footprint" (i.e., boundary) of cutting areas shall be maintained in accordance with and as represented in TE-3
Mow/Trim Grass in Semi-Improved Areas
Grass shall be maintained to a height of 3" and cut/trimmed when height exceeds 6" or as required.
No more than 25% of total facility and/or area should exceed 6" during random sampling.
Random Sampling And Customer Complaints
Outstanding performance denoted in monthly status report.
boundary) of cutting areas shall be maintained in accordance with and as represented in TE-3
Substandard performance will also be denoted in the monthly status report, and possibility of funds withheld until
Performance Objective (from PWS Section 2)
Performance Standard Acceptable Quality Level
Method of Surveillance Incentive / Disincentive
Grass shall be No more than 25% I
Random Sampling Outstanding maintained to a height of of total facility And Customer performance 3" and cut/trimmed when and/or area should Complaints denoted in
Mow/Trim Grass in height exceeds 7" or as exceed 6" during monthly status Ranges required. random sampling. report.
Substandard boundary) of cutting performance will areas shall be also be denoted in maintained in the monthly status accordance with and as report, and represented in TE-3 possibility of funds withheld until
TECHNICAL EXHIBIT 1
TECHNICAL EXHIBITS 1: SPECIFIC FEATURES AND REQUIREMENTS
1. The purpose of this exhibit is to identify and clarify specific features and requirements of Off Post Grass Cutting areas. This exhibit is an adjunct to the maps supplied in the Technical Exhibits.
2. RANGE 2. Mowing area includes a five foot (5') strip on either side of roadway beginning at Route 293 and ending at parking area across from the guard shack. Mowing area also includes the slope in front of the bleachers and the grassed area around the ordinance burn pit.
3. RANGES 3. Mowing areas include all areas of the Range 3 footprint: range tower, range office and storage building, bleacher area, firing lines, individual firing lanes and around each target boxes and berms. All target boxes are to have grass clippings and debris blown out of them after the area is mown.
4. RANGES 4 & 5. Mowing area includes a five foot (5') strip on either side of roadway beginning at Route 293 up to mowing area at the firing range. Mowing area includes a ten foot (10') strip outside exterior walls of Building# 1328. Mowing area includes ten feet (10') behind target frames. At Range 4, the area to be mowed includes atop and five feet (5') behind the berm. At Range 5, the mowing area extends northward to the tree line at the western end of Range 5. At Range 5, mow the areas around the target boxes and berms at the one hundred seventy-five (175) meter and three hundred (300) meter targets, and ten foot (10') around the eight target box at the two hundred (200) meter targets and the eight (8) target boxes at the four hundred (400) meter targets. Also, mow the area from the back of the twenty five (25) meter targets to the seventy-five (75) meter targets including the berm. All target boxes are to have grass clippings and debris blown out of them after the area is mown.
5. RANGE 5, 75 to 400M Targets: Mowing area is from the seventy-five (75) meter to the four hundred
(400) meter targets area.
6. RANGES 7, 8, 9, & 10. Mowing area includes a five foot (5') strip on either side of roadway beginning at Route 293 up to mowing area at the firing range. It also includes the small 3,500 square foot field by Route 293 where the cement coffin is located. This field contains the battery, solar panel, and cable to power the warning light for the ranges.
7. RANGE 11 (ROCA AREA). Mowing area includes a five foot (5') strip on either side of roadway beginning at Route 293 up to mowing area at the firing range. Mowing area includes a five foot (5') diameter circle around twenty-five (25) flared end drain pipes and catch basin grates west of the mowing area boundary. Mowing area includes a ten foot (10') diameter circle around forty-eight (48) target berms west of the mowing area boundary.
Mowing area includes grass under bleachers. Mowing area includes a five foot (5') wide path to targets on either side of creek running through range area. Vegetation is to be cut so that there is a clear line of sight from the firing point all the way to the targets. All debris will be blown out of pop-up target bunkers after each cutting.
8. RANGE 11 (MIDDLE SECTION). Mowing area includes the wet area populated with reeds, edges and similar vegetation between the one hundred seventy-five (175) meter and two hundred fifty (250) meter target lines. All debris will be blown out of pop-up target bunkers after each cutting.
9. RANGE 11 (REAR SECTION). Trimming and mowing area includes vegetation between located along the two hundred and fifty (250) meter and three hundred fifty (350) meter target lines, using weed
W911SD22P0087
trimmers, mower and possible manual cutting may be required. All debris will be blown out of pop-up target bunkers after each cutting.
10. RANGE 11 (ALL). Contractor shall possess ability to complete entirety of Range 11 in one working day.
11. RANGE 12. The cutting area of Range 12 also includes the clearing and cutting of vegetation to a depth of five feet (5') on both sides of the access road between Ranges 11 and 12.
12. RANGE 13, MORTAR RANGE: This area is to be cut once a season. This area equals one half(½) acre.
13. AMMO STORAGE AREA (ASP): Mowing area includes a twelve foot (12') area around the outside of ASP fences and all areas inside the fence area. Access to ASP must be scheduled in advance with the Contract Officer Representative and ASP manager.
14. ALL RANGES AND TRAINING AREAS: Mowing areas include cutting all grass and vegetation under all bleachers within the designated grass cutting areas.
15. TRAINING SITE W: Mowing area includes a five foot (5') strip on either side of roadway beginning at Route 293 up to mowing area at the training site.
16. RAPPEL SITE: This area includes the parking area on the south east side of the access road to the rappel site.
17. HELICOPTER LANDING ZONES: These areas are located throughout the training complex and are to support Cadet Summer Training, and provide a safe landing zone. The following landing zones (LZ's) are:
LZ Bull, LZ Falcon, LZ Vulture, LZ Raven, LZ Crow and LZ Owl.
18. DAMS: The following dams: Lake Frederick, Lake Popa/open, Mine Lake, Brooks Hollow, Cranberry Pond, Lake Georgina, Weygand Pond, Wilkins Pond, Lower Cragson and Stillwell Dam will be mowed.
The purpose is to allow the inspectors to view the ground on both sides of the dam for any signs of condition changes, seepage from dam coming up thru the grass, animal burrows, uprooted trees, slumps, or other soil movements, etc. The sloped terrain provides uneven footing and the grounds are classified as semi-improved and un-improved. The following cutting standards should be used when applicable and may differ from dam-to-dam.
a. Cutting areas vary, but none exceeds one (1) acre.
b. Cut downstream side to five (5') feet beyond the toe of the earthen dam.
c. Cutting area includes twenty-five feet (25') beyond the limits of the sides of the dam.
d. Cutting area on the water side is a narrow strip, approx. six (6') feet wide.
19. MINE TORNE ROAD: The area from Route 293 to the last road gate on Mine Tome Road, near the entrance to Camp Shea is to have all brush and herbaceous growth up to two inches (2")in diameter cut to as close to the ground as possible. The dimensions of the cut are ten feet (10') back from the edge of the road on both sides of the roadway and to a height of fifteen feet (15') of overhanging growth. This totals an area equal to five and one half (5 ½) acres.
20. BULL POND ROAD/PROCTORIA ROAD: The mowing area starts at Route 293 continues up Bull Pond Road onto Proctoria Road finishing at the entrance to Lake Frederick from Mineral Springs Road, a distance of three and one quarter (3.25) miles one way. This area is to be cleared of brush and herbaceous growth up to two inches (2") in diameter, cut as close to the ground as possible. The dimensions of the cut are ten feet (10') back from the edge ofthe road on both sides ofthe roadway and to a height of fifteen feet (15') of overhanging growth. This totals an area equal to eight (8) acres. The area described above is cut annually.
21. MORGAN FARM: The areas to be cut: to a depth of six feet (6') on either side of the entrance road to Morgan Farm, the road from the Morgan Farm sign past the main barn complex, and along the roadway around the upper riding ring and paddocks. Also, the area around the kennel and main barn area along with the front and sides of lower riding ring adjacent to the parking area and hard packed area in front of the main barn complex.
22. RANGE 14 & 15 (URBAN ASSAULT COURSE (UAC)): The areas to be cut include ten feet (10') back from the edge of the road on both sides of the roadway. Road intersections and stations have increased depth cutting areas. There are four (4) significant structures that require grass cutting and trimming.
23. SKI SLOPE: Includes two (2) cuts performed on the top slope and Two (2) cuts on the bottom of the slope, from Pipeline Trail to the improved grounds at the Ski Lodge (Building 718).
TECHNICAL EXHIBIT 2
CUTTING CYCLES, GROUNDS TYPES and ACREAGE
Item No Facility or Area Total
Cycles Type of Grounds Acreage
Camp Buckner/CNS Debris Cleanup
NA
36.41
2 Camp Buckner 6 Improved 26.09 3 Camp Buckner 4 Semi-Improved 2.86 4 Camp Natural Bridge 6 Improved 4.77 5 Camp Natural Bridge 4 Semi-Improved 2.69 6 Area B Forward 5 Range 0.96
7 Bldg 1330 - ITAM Office 5 Semi-Improved 0.29 8 Bldg 1400 - Fire Station 7 Improved 0.99 9 Bldg 1403 - Range Operations 7 Improved 0.65 10 Bldg 1670 - MP Co Game Wardens 3 Semi-Improved 0.26 11 Bldg 1666 - DMI Headquarters 3 Semi-Improved 0.26 12 Maddock Drop Zone 2 Range 11.56 13 Off Post Cemeteries 3 Semi-Improved 0.16 14 Leadership Reaction Course 2 Range 1.27 15 Area J 2 Semi-Improved 2.04 16 Range 1/1A - Hand Grenade 3 Range 7.39 17 Range 2 - Field Artillery Site 4 Range 7.94 18 Ranges 3, 4 & 5 5 Range 11.81 19 Range 5 - 75 to 400 Meter Targets 2 Range 13.10 20 Ranges 7,8,9 & 10 Complex 5 Range 11.31
21 Range 11 (middle) 5 Range 26.81 22 Range 11 (ROCA Area) 5 Range 3.58 23 Range 11 (rear) 5 Range 7.49 24 Range 12 2 Range 2.87 25 Range 13 1 Range 0.73 26 Ammunition Storage Point 4 Semi-Improved 3.49 27 Land Nav Site #3 1 Range 0.21 28 NBC Bivouac Area 3 Range 3.22
29 Land Nav Site #2 2 Range 0.53
30 Site P 3 Range 3.06
31 Range 14 & 15 UAC 5 Range 7.58 32 Training Site W 2 Range 3.47
33 Rappel Site - Pine Ridge 2 Range 0.13
34 Range 17 5 Range 4.42 35 Landing Zones - Owl 1 Range 6.10
36 Dam - Lake Frederick 2 Semi-Improved 0.98
37 Dam - Mine Lake 2 Semi-Improved 0.19
38 Dam - Weyant Pond 1 Semi-Improved 0.24
39 Mine Tome Road 2 Semi-Improved 8.91
40 Proctoria & Bull Pond Road 2 Semi-Improved 7.70
41 Lake Frederick Recreational Area 8 Improved 9.03
42 Lake Frederick Recreational Area 2 Semi-Improved 15.63
43 Ski Slope -Top Half 2 Semi-Improved 12.90
44 Ski Slope - Bottom Half 2 Semi-Improved 7.69
45 Ski Slope - Bldg 718 4 Semi-Improved 0.26
46 Round Pond Recreation Area 8 Improved 4.23
47 Round Pond 5 Semi-Improved 3.13
48 Morgan Farm Equestrian Center 7 Semi-Improved 4.46
49 Cragson Landfill 3 Semi-Improved 6.32
50 Additional Areas As Needed - 1 Acre 1 Semi-Improved 1.00
51 Additional Areas As Needed - 1 Acre 1 Improved 1.00 52 Additional Areas As Needed - 1 Acre 1 Range 1.00
53 Aachen MOUT Site 5 Range 4.33 54 T2 MOUT Site 2 Range 0.61 55 Constitution Island - Improved Area 5 Semi-Improved 3.97 56 Landing Zone - Falcon 2 Range 0.92
57 Landing Zone - Bull 2 Range 1.42 58 Landing Zone - Vulture 2 Range 0.77
59 Landing Zone - Raven 2 Range 0.76
60 Landing Zone - Crow 2 Range 0.17 total acres 314.12
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each $20,017.00 $20,017.00
0001 CAMP BCKNR/CNB CLEAN UP
FFP
0001 CAMP BCKNR/CNB CLEAN UP
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
PURCHASE REQUEST NUMBER: 0011553933-0001
PSC CD: S208
NET AMT $20,017.00
ACRN AA
CIN: GFEBS001155393300357
$20,017.00
0002 6 Each $9,213.00 $55,278.00
0002 CAMP BCKNR IMPRVD GROUNDS
FFP
0002 CAMP BCKNR IMPRVD GROUNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $55,278.00
CIN: GFEBS001155393300303
$55,278.00
0003 4 Each $858.00 $3,432.00
0003 CAMP BCKNR SEMI IMPRVD GRNDS
FFP
0003 CAMP BCKNR SEMI IMPRVD GRNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $3,432.00
CIN: GFEBS001155393300304
$3,432.00
0004 6 Each $1,531.00 $9,186.00
0004 CNB IMPRVD GROUNDS
FFP
0004 CAMP NATURAL BRIDGE IMPRVD GROUNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $9,186.00
CIN: GFEBS001155393300305
$9,186.00
0005 3 Each $807.00 $2,421.00
0005 CNB SEMI IMPRVD GRNDS
FFP
0005 CAMP NATURAL BRIDGE SEMI IMPRVD GRNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $2,421.00
CIN: GFEBS001155393300306
$2,421.00
0006 5 Each $190.00 $950.00
0006 BAYONET ASSAULT COURSE
FFP
0006 BAYONET ASSAULT COURSE
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $950.00
CIN: GFEBS001155393300307
$950.00
0007 5 Each $187.00 $935.00
0007 BLDG. 1330 ITAM OFC
FFP
0007 BLDG. 1330 ITAM OFC BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $935.00
CIN: GFEBS001155393300308
$935.00
0008 7 Each $317.00 $2,219.00
0008 BLDG. 1400 FIRE STATION
FFP
0008 BLDG. 1400 FIRE STATION
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $2,219.00
CIN: GFEBS001155393300309
$2,219.00
0009 7 Each $281.00 $1,967.00
0009 BLDG. 1403 RNGE CNTRL
FFP
0009 BLDG. 1403 RNGE CNTRL
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,967.00
CIN: GFEBS001155393300310
$1,967.00
0010 3 Each $78.00 $234.00
0010 BLDG. 1670 DMI
FFP
0010 BLDG. 1670 DMI BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $234.00
CIN: GFEBS001155393300311
$234.00
0011 3 Each $78.00 $234.00
0011 BLDG. 1666 DMI HQ
FFP
0011 BLDG. 1666 DMI HQ BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $234.00
CIN: GFEBS001155393300312
$234.00
0012 2 Each $2,289.00 $4,578.00
0012 LF DZ MADDOCK DRP ZONE
FFP
0012 LF DZ MADDOCK DRP ZONE
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,578.00
CIN: GFEBS001155393300313
$4,578.00
0013 3 Each $48.00 $144.00
0013 OFF POST CEMETERIES
FFP
0013 OFF POST CEMETERIES
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $144.00
CIN: GFEBS001155393300314
$144.00
0014 1 Each $251.00 $251.00
0014 LEDRSHIP REACTOIN CRSE
FFP
0014 LEADERSHIP REACTION COURSE
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $251.00
CIN: GFEBS001155393300315
$251.00
0015 2 Each $612.00 $1,224.00
0015 AREA J
FFP
0015 AREA J BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,224.00
CIN: GFEBS001155393300316
$1,224.00
0016 3 Each $1,463.00 $4,389.00
0016 RANGE 1 HAND GRENADE
FFP
0016 RANGE 1 HAND GRENADE
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,389.00
CIN: GFEBS001155393300317
$4,389.00
0017 3 Each $1,572.00 $4,716.00
0017 RANGE 2 FA SITE
FFP
0017 RANGE 2 FA SITE BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,716.00
CIN: GFEBS001155393300318
$4,716.00
0018 5 Each $2,338.00 $11,690.00
0018 RANGES 3, 4 & 5
FFP
0018 RANGES 3, 4 & 5
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $11,690.00
CIN: GFEBS001155393300319
$11,690.00
0019 2 Each $2,294.00 $4,588.00
0019 RANGE 5
FFP
0019 RANGE 5 - 75 TO 400 METER TARGETS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,588.00
CIN: GFEBS001155393300320
$4,588.00
0020 5 Each $2,239.00 $11,195.00
0020 RNGS 7,8,9,&10 COMPLEX
FFP
0020 RNGS 7,8,9,&10 COMPLEX
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $11,195.00
CIN: GFEBS001155393300321
$11,195.00
0021 5 Each $9,467.00 $47,335.00
0021 RANGE 11 IMPRVD GRNDS
FFP
0021 RANGE 11 IMPRVD GRNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $47,335.00
CIN: GFEBS001155393300322
$47,335.00
0022 5 Each $1,074.00 $5,370.00
0022 RANGE 11 SEMI IMPRVD GRNDS
FFP
0022 RANGE 11 SEMI IMPRVD GRNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $5,370.00
CIN: GFEBS001155393300323
$5,370.00
0023 5 Each $2,397.00 $11,985.00
0023 RANGE 11 UNIMPRVD GRNDS
FFP
0023 RANGE 11 UNIMPRVD GRNDS
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $11,985.00
CIN: GFEBS001155393300356
$11,985.00
0024 2 Each $568.00 $1,136.00
0024 RANGE 12
FFP
0024 RANGE 12 BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,136.00
CIN: GFEBS001155393300324
$1,136.00
0025 1 Each $145.00 $145.00
0025 RANGE 13
FFP
0025 RANGE 13 BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $145.00
CIN: GFEBS001155393300358
$145.00
0026 4 Each $1,047.00 $4,188.00
0026 AMMUN. STRGE POINT
FFP
0026 AMMUN. STRGE POINT
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,188.00
CIN: GFEBS001155393300325
$4,188.00
0027 1 Each $42.00 $42.00
0027 LAND NAV. SITE # 3
FFP
0027 LAND NAV. SITE # 3 BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $42.00
CIN: GFEBS001155393300359
$42.00
0028 3 Each $638.00 $1,914.00
0028 NBC BIVOUAC AREA
FFP
0028 NBC BIVOUAC AREA
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,914.00
CIN: GFEBS001155393300326
$1,914.00
0029 2 Each $105.00 $210.00
0029 LAND NAV SITE # 2
FFP
0029 LAND NAV SITE # 2 BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $210.00
CIN: GFEBS001155393300327
$210.00
0030 3 Each $606.00 $1,818.00
0030 SITE P
FFP
0030 SITE P BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,818.00
CIN: GFEBS001155393300328
$1,818.00
0031 5 Each $1,500.00 $7,500.00
0031 RANGE 14 & 15 UAC
FFP
0031 RANGE 14 & 15 UAC
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $7,500.00
CIN: GFEBS001155393300329
$7,500.00
0032 2 Each $687.00 $1,374.00
0032 TRAINING SITE W
FFP
0032 TRAINING SITE W BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,374.00
CIN: GFEBS001155393300330
$1,374.00
0033 2 Each $26.00 $52.00
0033 RAPPEL SITE (PINE RDG)
FFP
0033 RAPPEL SITE (PINE RDG)
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $52.00
CIN: GFEBS001155393300331
$52.00
0034 5 Each $875.00 $4,375.00
0034 LFX SITE # 1
FFP
0034 LFX SITE # 1 BASE
YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,375.00
CIN: GFEBS001155393300332
$4,375.00
0035 1 Each $1,208.00 $1,208.00
0035 HELICPTR LAND ZONES LZ OWL
FFP
0035 HELICPTR LAND ZONES LZ OWL
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $1,208.00
CIN: GFEBS001155393300333
$1,208.00
0036 2 Each $294.00 $588.00
0036 DAMS LAKE FREDERICK
FFP
0036 DAMS LAKE FREDERICK
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $588.00
CIN: GFEBS001155393300334
$588.00
0037 2 Each $57.00 $114.00 0037 DAMS Mike Lake
FFP
0037 MINE TORN ROAD
BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $114.00
CIN: GFEBS001155393300335
$114.00
0038 1 Each $72.00 $72.00 0038 Dams Weyant Pont
FFP
0038 Dams Weyant Pont BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $72.00
CIN: GFEBS001155393300336
$72.00
0039 2 Each $2,673.00 $5,346.00 0039 Mine Torn Rd
FFP
0039 Mine Torn Rd BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $5,346.00
CIN: GFEBS001155393300337
$5,346.00
0040 2 Each $2,310.00 $4,620.00 0040 Proctoria & Bull Pond Road
FFP
0040 Proctoria & Bull Pond Road BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $4,620.00
CIN: GFEBS001155393300338
$4,620.00
0041 8 Each $3,284.00 $26,272.00 0041 Lake Frederick Rec
FFP
0041 Lake Frederick Rec BASE YEAR: 01 JULY 2022 through 30 JUNE 2023 FOB: Destination
NET AMT $26,272.00
CIN: GFEBS001155393300339
$26,272.00
0042 2 Each $4,689.00 $9,378.00 0042 Lake Frederick Rec Semi Improved
FFP
0042 Lake Frederick…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .