SPECS.docx
DOCX document 75 KB Posted
- Attached to
- PLANETRAY FOOD MIXERS
- Solicitation number
- W911SD-18-T-0023
- Issued by
-
Department of the Army
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SITE_VISIT.docx | DOCX document | |
| SOLICITATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY SUSTAINMENT COMMAND
Bldg. 745 Cadet Mess Hall West Point, NY 10996
UNCLASSIFIED
10 August 2017
MEMO TO: Contract Specialist, MICC
SUBJECT: FLOOR MODEL MIXERS
Requirement: The Cadet Mess requires (4) new floor model mixers to accomplish the mission of feeding cadets. The mixers will replace the current Hobart Model V1401 which has exceeded their expected 15-year operational life cycle. The intent is purchase the floor model mixers as soon as practical utilizing the following specifications. The floor model mixers are utilized daily to accomplish the mission of preparing and serving 3 meals a day for 4,500 cadets, 350 days a year. To maintain this operational tempo with properly cleaned and sanitized equipment, operation must be seamless and result in minimal operational deficiencies. Funding is unknown, and the expectation is that funding will be via the Unfunded Request process.
Floor Model Mixer Specifications:
1. Must be same as or equivalent to Hobart Model V1401
2. Metallic gray hybrid powder coat finish, stainless steel bowl guard.
3. Heavy Duty 5 H.P Motor, gear transmission, and safety mechanism system.
4. 140 Quart, 200-240V/50/60/3 phase connection, ¾” pipe tap for electrical connection, 2960-3552 Wattage.
5. Push button power-bowl lift to raise and lower bowl.
6. 4 speeds, plus stir speed.
7. Ergonomic swing-out bowl, single point bowl installation, open base.
8. Accessory package to incluse stainless steel bowl, beater, dough hook, and bowl truck.
9. Shift-on-the-fly large, easy to reach controls with automatic time recall.
Vendor Requirements:
1. Must remove and transport current floor model mixers in use to loading dock, including disconnect of all components tied into facility utilities, install new mixers.
2. The vendor will be responsible for uncrating, installation, start-up, electrical, and demonstration of new equipment and removal of packaging and installation materials. Installation to include connection of new floor model mixers to all existing electric.
3. Must include a standard 2-year warranty on parts and workmanship.
image1.wmf
File details come from the government source that posted it.